Ratings for the physical buildout of AI

Visuals

Eight visual surfaces over Compute Institute's live ratings data — the Jurisdiction Index dimension heatmap, score history, and radar, tracked-capacity treemap and status pipeline, evidenced capital flows, the global project map, and the projected pipeline built from announced, cited timeline claims. Every chart is backed by the same data in plain HTML tables, with methodology and citations linked where scores appear.

Jurisdiction Index dimension heatmap

#index-heatmap

Qatar leads 3 of 7 dimensions across the 34 rated jurisdictions.

Interactive chart — the same data is in the table below.

Data table — Jurisdiction Index dimension heatmap
Jurisdiction
JCI
Power
Cost
Speed
Regulatory
Fiscal
Capital
Stability
Qatar 77.4 6.9 8.4 6.6 8 8.4 8.5
US — Iowa (MISO) 76.5 6.6 7.8 7.7 7.2 7.4 8.7 8.6
US — Indiana (MISO) 72.4 6.5 5.1 7 7.4 8 8.7 8.6
US — Texas (ERCOT) 72.3 6.4 7.1 7.8 7 7.2 7.4 8
United Arab Emirates 69.7 6.4 6.3 7.2 6.5 7.4 8 7.4
US — Wisconsin (MISO) 68.5 5.4 4.9 7.3 7.4 7.1 7.9 8.5
US — Arizona (APS/SRP) 67.2 5.1 6.8 6.9 6.4 7.7 7.3 7.7
US — Georgia (Southern/Georgia Power) 67.2 6 6.3 7 6.3 6.8 6.3 8.3
Saudi Arabia 65.2 5.8 7 6.8 5.7 6.5 7.4 6.9
US — North Carolina (Duke Energy) 63.4 4.7 6.4 6.7 7 7.8
US — Rest of US (composite) 63.4 5.1 5.9 6.3 6.1 6.4 6.9 8.1
Sweden 63.1 6.5 7.3 4 6 4.5 7 8.8
Canada 62.3 5.2 6.9 5.9 6.1 5.4 5.9 8.5
France 62.3 6.5 5.9 5.6 5.9 5.5 6.3 7.6
Australia 61.9 5.9 4.9 4.8 6.9 4.7 7.6 8.6
US — Virginia (PJM/Dominion) 61.6 3.9 5 6.8 5.8 6.6 7.7 8.3
US — Ohio (AEP Ohio / PJM) 61.2 4.3 4.5 6.5 6.5 6.1 8 7.7
US — Pennsylvania (PJM) 60.4 3.8 4.3 6.7 7.2 7 8.4
Denmark 60.2 4.2 4.8 5.9 7.1 5.1 6.5 8.9
US — Minnesota (Xcel / MISO) 59.3 5.5 6.6 6 6.4 5 3.3 8.4
Singapore 59 2.8 4.3 6.9 6 6.7 6.7 9
Malaysia — Johor (Johor-Singapore SEZ) 58.9 6.8 4.2 6.2 6.2 5.5
Japan 58.6 4.7 1.6 6 8 5.7 7.8 7.6
United Kingdom 57 4.5 3.3 5.5 7.1 5 6.4 8.2
Germany 56.7 4.6 3.2 6 6.2 3.7 7.4 8.3
India 54.9 4.9 5.1 5.7 5.2 5.9 6.1 6
Ireland 54.1 3 1.7 5.4 6.4 8.5 8.5
Indonesia 53.6 3.9 6.4 5 5.5 6.1 7 4.9
South Africa 52.3 3.9 4.4 6.5 5.4 4.9 6.4 5.4
Brazil 50.9 6.3 2.7 5 5.6 4.5 6.4 4.5
Argentina 50.7 4.5 6 5.5 5 7 5.4 3
Poland 50.7 4.2 3.2 4.5 6.2 6.5 6.6
Netherlands 50.3 2.8 3.2 3.7 5.2 4.7 8.5 8.3
South Korea 49 3.6 2.2 5 5.8 5 7.9 5.6

Dimension scores 0–10, composite JCI 0–100; "—" = not yet evidenced at E1–E2. Methodology v0 — every score traces to cited sources on the jurisdiction page.

JCI score history

#history

Score history begins June 14, 2026 — 34 jurisdictions scored across 10 scoring runs so far; trend lines deepen as new runs publish.

Interactive chart — the same data is in the table below.

Data table — JCI score history
Jurisdiction
Run date
Methodology
JCI
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Wisconsin (MISO) v0 68.5
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Pennsylvania (PJM) v0 60.4
US — Rest of US (composite) v0 63.4
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Indiana (MISO) v0 72.4
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Iowa (MISO) v0 76.5
Qatar v0 77.4
Saudi Arabia v0 65.2
Sweden v0 63.1
Netherlands v0 50.3
Poland v0 50.7
India v0 54.9
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
France v0 62.3
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Brazil v0 50.9
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Wisconsin (MISO) v0 68.5
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Pennsylvania (PJM) v0 60.4
US — Rest of US (composite) v0 63.4
US — Georgia (Southern/Georgia Power) v0 67.2
US — Indiana (MISO) v0 72.4
US — Iowa (MISO) v0 76.5
US — Minnesota (Xcel / MISO) v0 59.3
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
US — Arizona (APS/SRP) v0 67.2
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
Qatar v0 77.4
India v0 54.9
Japan v0 58.6
South Korea v0 49
France v0 62.3
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Pennsylvania (PJM) v0 60.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Wisconsin (MISO) v0 68.5
US — Indiana (MISO) v0 72.4
US — Iowa (MISO) v0 76.5
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
Singapore v0 59
Sweden v0 63.1
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Netherlands v0 50.3
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
France v0 62.3
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Virginia (PJM/Dominion) v0 61.6
US — Wisconsin (MISO) v0 68.5
US — Pennsylvania (PJM) v0 60.4
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Indiana (MISO) v0 72.4
US — Iowa (MISO) v0 76.5
Singapore v0 59
Sweden v0 63.1
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Netherlands v0 50.3
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
Denmark v0 60.2
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Australia v0 61.9
Brazil v0 50.9
Canada v0 62.3
Germany v0 56.7
Argentina v0 50.7
United Arab Emirates v0 69.7
US — Wisconsin (MISO) v0 68.5
US — Iowa (MISO) v0 76.5
US — Indiana (MISO) v0 72.4
South Africa v0 52.3
US — Pennsylvania (PJM) v0 60.4
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
Qatar v0 77.4
Saudi Arabia v0 65.2
Sweden v0 63.1
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
South Korea v0 49
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
France v0 62.3
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
US — Pennsylvania (PJM) v0 60.4
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
Qatar v0 77.4
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
South Korea v0 49
France v0 62.3
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Brazil v0 50.9
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
Singapore v0 59
Sweden v0 63.1
Qatar v0 77.4
Saudi Arabia v0 65.2
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
Japan v0 58.6
South Korea v0 49
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Denmark v0 60.2
France v0 62.3
Germany v0 56.7
Australia v0 61.9
Brazil v0 50.9
Canada v0 62.3
Argentina v0 50.7
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Rest of US (composite) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Georgia (Southern/Georgia Power) v0 67.2
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
Sweden v0 63.1
Qatar v0 77.4
Saudi Arabia v0 65.2
Poland v0 50.7
Netherlands v0 50.3
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
India v0 54.9
Japan v0 58.6
Ireland v0 54.1
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Denmark v0 60.2
Germany v0 56.7
Canada v0 62.3
Australia v0 61.9
Brazil v0 50.9
Argentina v0 50.7
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Virginia (PJM/Dominion) v0 61.6
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Saudi Arabia v0 65.2
Sweden v0 63.1
Poland v0 50.7
Qatar v0 77.4
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
South Korea v0 49
India v0 54.9
Japan v0 58.6
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Denmark v0 60.2
France v0 62.3
Canada v0 62.3
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
Singapore v0 59
Sweden v0 63.1
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
India v0 54.9
Japan v0 58.6
South Korea v0 49
Indonesia v0 53.6
Ireland v0 54.1
France v0 62.3
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Australia v0 61.9
Brazil v0 50.9
Argentina v0 50.7
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Virginia (PJM/Dominion) v0 61.6
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
Poland v0 50.7
Qatar v0 77.4
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
South Korea v0 49
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Denmark v0 60.2
Germany v0 56.7
Brazil v0 50.9
Canada v0 62.3
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
South Korea v0 49
Canada v0 62.3
Denmark v0 60.2
France v0 62.3
Germany v0 56.7
Indonesia v0 53.6
United Kingdom v0 57
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Sweden v0 63.1
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
India v0 54.9
Japan v0 58.6
South Korea v0 49
Indonesia v0 53.6
Ireland v0 54.1
Denmark v0 60.2
France v0 62.3
United Kingdom v0 57
Brazil v0 50.9
Canada v0 62.3
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Qatar v0 77.4
Saudi Arabia v0 65.2
Sweden v0 63.1
Netherlands v0 50.3
Poland v0 50.7
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
France v0 62.3
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
Qatar v0 77.4
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
South Korea v0 49
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Brazil v0 50.9
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7

One row per published scoring run (jurisdiction_scores is append-only — history is recorded, never back-filled). The line chart deepens as runs accumulate.

Dimension radar — jurisdiction profiles

#radar

Across the 34 rated jurisdictions, the single strongest dimension score is Singapore in Stability & Execution Risk (9 of 10); the computed median profile is drawn for comparison.

Interactive chart — the same data is in the table below.

Data table — Dimension radar — jurisdiction profiles
Jurisdiction
JCI
Power
Cost
Speed
Regulatory
Fiscal
Capital
Stability
Qatar 77.4 6.9 8.4 6.6 8 8.4 8.5
US — Iowa (MISO) 76.5 6.6 7.8 7.7 7.2 7.4 8.7 8.6
US — Indiana (MISO) 72.4 6.5 5.1 7 7.4 8 8.7 8.6
US — Texas (ERCOT) 72.3 6.4 7.1 7.8 7 7.2 7.4 8
United Arab Emirates 69.7 6.4 6.3 7.2 6.5 7.4 8 7.4
US — Wisconsin (MISO) 68.5 5.4 4.9 7.3 7.4 7.1 7.9 8.5
US — Arizona (APS/SRP) 67.2 5.1 6.8 6.9 6.4 7.7 7.3 7.7
US — Georgia (Southern/Georgia Power) 67.2 6 6.3 7 6.3 6.8 6.3 8.3
Saudi Arabia 65.2 5.8 7 6.8 5.7 6.5 7.4 6.9
US — North Carolina (Duke Energy) 63.4 4.7 6.4 6.7 7 7.8
US — Rest of US (composite) 63.4 5.1 5.9 6.3 6.1 6.4 6.9 8.1
Sweden 63.1 6.5 7.3 4 6 4.5 7 8.8
Canada 62.3 5.2 6.9 5.9 6.1 5.4 5.9 8.5
France 62.3 6.5 5.9 5.6 5.9 5.5 6.3 7.6
Australia 61.9 5.9 4.9 4.8 6.9 4.7 7.6 8.6
US — Virginia (PJM/Dominion) 61.6 3.9 5 6.8 5.8 6.6 7.7 8.3
US — Ohio (AEP Ohio / PJM) 61.2 4.3 4.5 6.5 6.5 6.1 8 7.7
US — Pennsylvania (PJM) 60.4 3.8 4.3 6.7 7.2 7 8.4
Denmark 60.2 4.2 4.8 5.9 7.1 5.1 6.5 8.9
US — Minnesota (Xcel / MISO) 59.3 5.5 6.6 6 6.4 5 3.3 8.4
Singapore 59 2.8 4.3 6.9 6 6.7 6.7 9
Malaysia — Johor (Johor-Singapore SEZ) 58.9 6.8 4.2 6.2 6.2 5.5
Japan 58.6 4.7 1.6 6 8 5.7 7.8 7.6
United Kingdom 57 4.5 3.3 5.5 7.1 5 6.4 8.2
Germany 56.7 4.6 3.2 6 6.2 3.7 7.4 8.3
India 54.9 4.9 5.1 5.7 5.2 5.9 6.1 6
Ireland 54.1 3 1.7 5.4 6.4 8.5 8.5
Indonesia 53.6 3.9 6.4 5 5.5 6.1 7 4.9
South Africa 52.3 3.9 4.4 6.5 5.4 4.9 6.4 5.4
Brazil 50.9 6.3 2.7 5 5.6 4.5 6.4 4.5
Argentina 50.7 4.5 6 5.5 5 7 5.4 3
Poland 50.7 4.2 3.2 4.5 6.2 6.5 6.6
Netherlands 50.3 2.8 3.2 3.7 5.2 4.7 8.5 8.3
South Korea 49 3.6 2.2 5 5.8 5 7.9 5.6
Median profile (computed) 60.8 5 5 6 6.2 6.3 7.3 8.1

Dimension scores 0–10 per methodology v0; full sub-factor provenance on each jurisdiction page. The chart's chips overlay up to four jurisdictions; the median profile is computed per dimension across rated jurisdictions.

Tracked capacity treemap

#treemap

US — Rest of US (composite) hosts the largest tracked capacity: 50,742 MW across 18 projects (44.1% of 115,101 tracked MW).

Interactive chart — the same data is in the table below.

Data table — Tracked capacity treemap
Jurisdiction
Projects with MW
MW undisclosed
Tracked MW
Share
US — Rest of US (composite) 18 1 50,742 MW 44.1%
US — Texas (ERCOT) 21 8 38,444 MW 33.4%
US — Pennsylvania (PJM) 7 4 10,920 MW 9.5%
France 1 5,000 MW 4.3%
US — Minnesota (Xcel / MISO) 1 2,700 MW 2.3%
US — Indiana (MISO) 3 4 1,472 MW 1.3%
United Arab Emirates 4 1 1,330 MW 1.2%
US — Arizona (APS/SRP) 4 2 1,184 MW 1%
US — Ohio (AEP Ohio / PJM) 2 6 992 MW 0.9%
US — Virginia (PJM/Dominion) 6 15 907 MW 0.8%
US — Georgia (Southern/Georgia Power) 5 12 704 MW 0.6%
Argentina 3 2 510 MW 0.4%
Australia 1 4 80 MW 0.1%
US — North Carolina (Duke Energy) 1 3 60 MW 0.1%
South Korea 1 2 36 MW 0%
Singapore 1 20 MW 0%
Japan 0 1 0 MW 0%
United Kingdom 0 3 0 MW 0%
Malaysia — Johor (Johor-Singapore SEZ) 0 2 0 MW 0%
US — Iowa (MISO) 0 3 0 MW 0%
Germany 0 1 0 MW 0%
Netherlands 0 2 0 MW 0%
US — Wisconsin (MISO) 0 1 0 MW 0%

Only projects with a stored MW figure enter the sums (77 active projects without a disclosed capacity excluded, never estimated). In the chart, undisclosed projects appear as a hatched leaf per jurisdiction, drawn at the median disclosed project size for visibility only.

Capital flow — evidenced commitments

#capital-flow

211.3B USD of evidenced capital commitments span 24 entity–project links; the largest single commitment is 40.0B USD by Google into Google Haskell County Data Centers.

Interactive chart — the same data is in the table below.

Data table — Capital flow — evidenced commitments
Entity
Role
Project
Committed capital
Google Investor Google Haskell County Data Centers $40.0B
Amazon Web Services Investor AWS Susquehanna Nuclear Data Center Campus $20.0B
PIMCO Lender Meta Hyperion (Richland Parish) $18.0B
Microsoft Investor Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) $15.2B
Blue Owl Capital Investor Stargate Abilene (Crusoe campus) $15.0B
Vantage Data Centers Investor Stargate Wisconsin - Vantage Lighthouse (Port Washington) $15.0B
Amazon Web Services Investor AWS Georgia Data Center Campuses (Butts & Douglas Counties) $11.0B
Amazon Web Services Investor AWS Louisa County Campuses (Lake Anna Tech Campus) $11.0B
Amazon Web Services Investor AWS Project Rainier (New Carlisle) $11.0B
Meta Investor Meta El Paso Data Center $10.0B
Google Investor Google Chesterfield Data Center Campus (Project Peanut) $9.0B
Microsoft Investor Microsoft Fairwater (Mount Pleasant) $7.3B
JPMorgan Chase Lender Stargate Abilene (Crusoe campus) $7.1B
Blue Owl Capital Investor Meta Hyperion (Richland Parish) $7.0B
BlackRock Lender Meta Hyperion (Richland Parish) $3.0B
Abu Dhabi Commercial Bank Lender Khazna AUH8 Masdar City AI Data Center $2.6B
Microsoft Investor Microsoft Boydton Campus $2.0B
Nvidia Investor xAI Colossus 2 (Memphis) $2.0B
Microsoft Investor Microsoft Fairwater Atlanta $1.8B
Meta Investor Meta Stanton Springs / Newton Data Center $1.0B
Undisclosed equipment financing providers Lender Fermi America Project Matador HyperGrid $885.0M
Public market investors (Nasdaq & LSE IPO) Investor Fermi America Project Matador HyperGrid $785.0M
du (Emirates Integrated Telecommunications Company) Investor du-Microsoft Hyperscale Data Center (Dubai) $544.0M
ARSAT (Empresa Argentina de Soluciones Satelitales) Government Partner ARSAT Benavidez Data Center Hall IV Expansion $17.0M

Committed capital is shown only where a USD figure is on the evidence record (project–entity roles) — 437 roles without a disclosed figure are excluded, never estimated.

Global map of tracked projects

#map

156 tracked projects across 23 jurisdictions, totaling 115,101 MW of announced or in-development capacity.

Interactive chart — the same data is in the table below.

Data table — Global map of tracked projects
Project
Jurisdiction
Status
Phase at August 2026
Announced transitions
Capacity
Health score
Location
Fermi America Project Matador HyperGrid US — Texas (ERCOT) Construction Construction Live: announced H2 2026 (resolves ) 11,000 MW
80 / 100
City
SB Energy AI Campus (Pike County, Ohio) US — Rest of US (composite) Construction Construction No announced timeline — ghosted on the map 10,000 MW
66 / 100
Jurisdiction centroid
Stratos Project US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 9,000 MW
60.5 / 100
Jurisdiction centroid
Comanche Circle US — Rest of US (composite) Permitted Pre-construction No announced timeline — ghosted on the map 5,000 MW
63 / 100
Jurisdiction centroid
GW Ranch (Pacifico Energy) US — Texas (ERCOT) Permitted Construction Construction: announced Q1 2026 (resolves ); Live: announced Q1 2027 (resolves ) 5,000 MW
64 / 100
Jurisdiction centroid
SoftBank France AI Data Center Program (Hauts-de-France) France Announced Live 5,000 MW
68 / 100
City
Homer City Energy Campus US — Rest of US (composite) Construction Construction Live: announced 2027 (resolves ) 4,400 MW
71.9 / 100
City
Shippingport / Bruce Mansfield Data Center (Project Phoenix) US — Pennsylvania (PJM) Permitted Pre-construction No announced timeline — ghosted on the map 3,600 MW
63.7 / 100
Jurisdiction centroid
MSB Global Services Matrix Data Center Campus US — Texas (ERCOT) Construction Live Live: announced Mar 2026 (resolves ) 3,000 MW
55.3 / 100
Jurisdiction centroid
TECfusions Keystone Connect (Upper Burrell) US — Pennsylvania (PJM) Planned Pre-construction No announced timeline — ghosted on the map 3,000 MW
51 / 100
Jurisdiction centroid
Google Project Skyway (Pine Island, MN) US — Minnesota (Xcel / MISO) Stalled Pre-construction No announced timeline — ghosted on the map 2,700 MW
35 / 100
City
AWS Project Rainier (New Carlisle) US — Rest of US (composite) Operating Live 2,200 MW
77 / 100
City
Eneus Energy Cameron County data center US — Texas (ERCOT) Announced Pre-construction No announced timeline — ghosted on the map 2,000 MW
54.3 / 100
Jurisdiction centroid
Meta Hyperion (Richland Parish) US — Rest of US (composite) Construction Construction Live: announced 2028 (resolves ) 2,000 MW
80.3 / 100
City
Microsoft Pecos data center campus US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 2,000 MW
60.5 / 100
Jurisdiction centroid
Poolside Project Horizon US — Texas (ERCOT) Stalled Live Live: announced Dec 2025 (resolves ) 2,000 MW
35 / 100
Jurisdiction centroid
Sweetwater 1 and 2 (IREN) US — Texas (ERCOT) Energized Live 2,000 MW
78.6 / 100
Jurisdiction centroid
Tract Caldwell County Technology Park US — Texas (ERCOT) Announced Pre-construction Live: announced 2028 (resolves ) 2,000 MW
51 / 100
Jurisdiction centroid
Wheatfield data center and gas plant US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 2,000 MW
60.5 / 100
Jurisdiction centroid
AWS Susquehanna Nuclear Data Center Campus US — Rest of US (composite) Construction Construction Live: announced 2029 (resolves ) 1,920 MW
68.3 / 100
City
Talen Energy - AWS Susquehanna PPA US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 1,920 MW
50.5 / 100
Jurisdiction centroid
AREP PowerHouse Grand Prairie US — Texas (ERCOT) Planned Live Construction: announced Q1 2025 (resolves ); Live: announced May 2026 (resolves ) 1,800 MW
51 / 100
Jurisdiction centroid
Crusoe Callaway County Missouri data center US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 1,800 MW
60.5 / 100
Jurisdiction centroid
Joliet data center campus US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 1,800 MW
60.5 / 100
Jurisdiction centroid
Yorkville data center campus US — Rest of US (composite) Announced Pre-construction No announced timeline — ghosted on the map 1,800 MW
60.5 / 100
Jurisdiction centroid
Crusoe / Blue Energy Data Center (Victoria, TX) US — Texas (ERCOT) Announced Pre-construction Live: announced 2028 (resolves ) 1,500 MW
61 / 100
Jurisdiction centroid
Vantage Data Centers Frontier (Shackelford County / Stargate) US — Texas (ERCOT) Construction Construction Live: announced H2 2026 (resolves ) 1,400 MW
69.5 / 100
City
Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus US — Pennsylvania (PJM) Announced Pre-construction No announced timeline — ghosted on the map 1,350 MW
51 / 100
Jurisdiction centroid
CloudBurst Data Center (New Braunfels) US — Texas (ERCOT) Construction Construction Live: announced 2026 (resolves ) 1,200 MW
59 / 100
Jurisdiction centroid
Stargate Abilene (Crusoe campus) US — Texas (ERCOT) Operating Live 1,200 MW
75.8 / 100
City
Stargate Milam County (OpenAI / SB Energy) US — Texas (ERCOT) Construction Construction Live: announced Oct 2026 (resolves ) 1,200 MW
72 / 100
City
Crane Clean Energy Center US — Pennsylvania (PJM) Announced Live Live: announced 1970 (resolves ) 1,000 MW
48.4 / 100
City
Meta Lebanon Data Center Campus (LEAP District) US — Indiana (MISO) Construction Construction No announced timeline — ghosted on the map 1,000 MW
67.8 / 100
Jurisdiction centroid
Meta Prometheus (New Albany) US — Rest of US (composite) Construction Construction Live: announced Q3 2026 (resolves ) 1,000 MW
53.8 / 100
City
Stargate Michigan - The Barn (Saline Township) US — Rest of US (composite) Construction Construction Live: announced H1 2028 (resolves ) 1,000 MW
69.5 / 100
City
Stargate New Mexico - Project Jupiter (Dona Ana County) US — Rest of US (composite) Construction Construction Live: announced 2026 (resolves ) 1,000 MW
52.8 / 100
City
Stargate UAE (Abu Dhabi) United Arab Emirates Announced Pre-construction Live: announced Q3 2026 (resolves ) 1,000 MW
47.5 / 100
Region
xAI Colossus 2 (Memphis) US — Rest of US (composite) Operating Live 1,000 MW
82 / 100
City
Amazon / AWS Salem Township Data Center Campus (Susquehanna) US — Pennsylvania (PJM) Construction Construction No announced timeline — ghosted on the map 960 MW
59 / 100
Jurisdiction centroid
Robena Mine Data Center (Project Hummingbird) US — Pennsylvania (PJM) Planned Live Live: announced 1970 (resolves ) 910 MW
64.9 / 100
Jurisdiction centroid
Stargate Wisconsin - Vantage Lighthouse (Port Washington) US — Rest of US (composite) Construction Construction Live: announced Q3 2027 (resolves ) 902 MW
82 / 100
City
Cologix Johnstown AI-Ready Campus US — Ohio (AEP Ohio / PJM) Announced Construction Construction: announced 2025 (resolves ) 800 MW
51 / 100
Jurisdiction centroid
Nexus Data Center (Hubbard) US — Texas (ERCOT) Announced Pre-construction Live: announced 2026 (resolves ) 612 MW
58.5 / 100
Jurisdiction centroid
Project Aggie (College Station) US — Texas (ERCOT) Cancelled Pre-construction No announced timeline — ghosted on the map 600 MW
10 / 100
Jurisdiction centroid
Aligned Project Caprock (Hale County) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map 540 MW
67.8 / 100
Jurisdiction centroid
Stargate Argentina (Patagonia) Argentina Announced Pre-construction Construction: announced 2026 (resolves ); Live: announced 2027 (resolves ) 500 MW
47.5 / 100
Jurisdiction centroid
EdgeCore Mesa (Greater Phoenix) US — Arizona (APS/SRP) Construction Live 496 MW
58.3 / 100
Jurisdiction centroid
DataBank Red Oak Campus (South Dallas) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map 480 MW
66 / 100
Jurisdiction centroid
Stack Infrastructure NVA02 (Manassas) US — Virginia (PJM/Dominion) Operating Live 420 MW
69.5 / 100
Jurisdiction centroid
Vantage Pittsboro Campus US — Indiana (MISO) Permitted Pre-construction No announced timeline — ghosted on the map 400 MW
53.2 / 100
Jurisdiction centroid
Project Comal US — Texas (ERCOT) Permitted Pre-construction No announced timeline — ghosted on the map 360 MW
65.9 / 100
Jurisdiction centroid
Novva Data Centers Mesa US — Arizona (APS/SRP) Planned Pre-construction Live: announced Q4 2026 (resolves ) 300 MW
51 / 100
Jurisdiction centroid
Rowan Cinco Data Center Campus (Medina County) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map 300 MW
51 / 100
Jurisdiction centroid
Compass Datacenters Goodyear US — Arizona (APS/SRP) Construction Construction No announced timeline — ghosted on the map 212 MW
66 / 100
Jurisdiction centroid
Vantage Data Centers Ashburn I (VA1) US — Virginia (PJM/Dominion) Operating Live 206 MW
61.5 / 100
Jurisdiction centroid
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) United Arab Emirates Planned Pre-construction Live: announced 2026 (resolves ) 200 MW
71.5 / 100
Jurisdiction centroid
T5 @ Atlanta IV (Palmetto) US — Georgia (Southern/Georgia Power) Planned Pre-construction Live: announced 2027 (resolves ) 200 MW
60.5 / 100
Jurisdiction centroid
DataBank Culpeper Campus (IAD5/IAD6) US — Virginia (PJM/Dominion) Planned Pre-construction No announced timeline — ghosted on the map 192 MW
50.5 / 100
Jurisdiction centroid
Vantage Data Centers OH1 (New Albany) US — Ohio (AEP Ohio / PJM) Construction Live Live: announced 2025 (resolves ) 192 MW
53.5 / 100
Jurisdiction centroid
Vantage Data Centers AZ1 (Goodyear) US — Arizona (APS/SRP) Construction Construction No announced timeline — ghosted on the map 176 MW
66 / 100
Jurisdiction centroid
Edged Atlanta ATL01 Campus (Tilford Yard) US — Georgia (Southern/Georgia Power) Operating Live 168 MW
58 / 100
Jurisdiction centroid
Meta Temple Data Center US — Texas (ERCOT) Commissioned Live 152 MW
55 / 100
Jurisdiction centroid
DataBank Lithia Springs Campus (ATL5/ATL6) US — Georgia (Southern/Georgia Power) Construction Construction No announced timeline — ghosted on the map 120 MW
53.5 / 100
Jurisdiction centroid
DC BLOX Atlanta West US — Georgia (Southern/Georgia Power) Construction Construction Live: announced 2027 (resolves ) 120 MW
51 / 100
Jurisdiction centroid
CoreWeave Lancaster AI Data Center Campus US — Pennsylvania (PJM) Planned Pre-construction No announced timeline — ghosted on the map 100 MW
51 / 100
Jurisdiction centroid
Khazna QAJ1 Ajman AI Data Center United Arab Emirates Construction Construction Live: announced Dec 2026 (resolves ) 100 MW
67.8 / 100
City
Meta El Paso Data Center US — Texas (ERCOT) Construction Construction Live: announced 2028 (resolves ) 100 MW
66 / 100
City
Microsoft Project Rita (Tyrone) US — Georgia (Southern/Georgia Power) Permitted Pre-construction No announced timeline — ghosted on the map 96 MW
56.2 / 100
Jurisdiction centroid
NEXTDC S3 (Sydney) Australia Operating Live 80 MW
58 / 100
Jurisdiction centroid
Metrobloks IND-A1 (Indianapolis) US — Indiana (MISO) Permitted Pre-construction No announced timeline — ghosted on the map 72 MW
64.9 / 100
Jurisdiction centroid
T5 @ Charlotte II (Kings Mountain) US — North Carolina (Duke Energy) Planned Pre-construction Live: announced 2026 (resolves ) 60 MW
61 / 100
Jurisdiction centroid
QTS Ashburn 1 (ASH1) US — Virginia (PJM/Dominion) Operating Live 55 MW
69.5 / 100
Jurisdiction centroid
Digital Edge SEL2 (Incheon) South Korea Operating Live 36 MW
58 / 100
Jurisdiction centroid
Khazna AUH8 Masdar City AI Data Center United Arab Emirates Construction Live Live: announced Aug 2026 (resolves ) 30 MW
75.3 / 100
City
NTT VA6 (Ashburn) US — Virginia (PJM/Dominion) Operating Live 24 MW
54 / 100
Jurisdiction centroid
Equinix SG6 (Singapore) Singapore Construction Construction No announced timeline — ghosted on the map 20 MW
51.8 / 100
Jurisdiction centroid
DC BLOX Henrico (Wilkinson Road) US — Virginia (PJM/Dominion) Construction Construction No announced timeline — ghosted on the map 10 MW
72.5 / 100
City
Cirion BUE1 Buenos Aires Expansion Argentina Operating Live 9 MW
62.5 / 100
Jurisdiction centroid
ARSAT Benavidez Data Center Hall IV Expansion Argentina Planned Pre-construction No announced timeline — ghosted on the map 1 MW
69 / 100
City
AirTrunk Osaka Campus (OSK1 + OSK2) Japan Construction Construction No announced timeline — ghosted on the map Undisclosed
57.3 / 100
Jurisdiction centroid
AirTrunk SYD3 (Western Sydney) Australia Permitting Pre-construction No announced timeline — ghosted on the map Undisclosed
50.5 / 100
Jurisdiction centroid
Aligned IAD-02 (Ashburn) US — Virginia (PJM/Dominion) Construction Construction No announced timeline — ghosted on the map Undisclosed
51.8 / 100
Jurisdiction centroid
Amazon / AWS Falls Township Data Center (Keystone Trade Center) US — Pennsylvania (PJM) Construction Construction No announced timeline — ghosted on the map Undisclosed
59 / 100
Jurisdiction centroid
Amazon Devlin Technology Park (Bristow) US — Virginia (PJM/Dominion) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
58 / 100
Jurisdiction centroid
Apple Maiden Data Center US — North Carolina (Duke Energy) Operating Live Undisclosed
52 / 100
Jurisdiction centroid
AWS Desper Creek Technology Campus (Louisa County) US — Virginia (PJM/Dominion) Permitting Pre-construction No announced timeline — ghosted on the map Undisclosed
47 / 100
Jurisdiction centroid
AWS Georgia Data Center Campuses (Butts & Douglas Counties) US — Georgia (Southern/Georgia Power) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
76 / 100
City
AWS Hilliard Third Campus (Scioto Darby Road) US — Ohio (AEP Ohio / PJM) Permitted Pre-construction No announced timeline — ghosted on the map Undisclosed
55.1 / 100
Jurisdiction centroid
AWS Louisa County Campuses (Lake Anna Tech Campus) US — Virginia (PJM/Dominion) Construction Construction Live: announced 2040 (resolves ) Undisclosed
80.3 / 100
City
AWS New Albany Data Center Campus US — Ohio (AEP Ohio / PJM) Operating Live Undisclosed
56 / 100
Jurisdiction centroid
Blackstone QTS Cambois Campus (Blyth) United Kingdom Construction Construction No announced timeline — ghosted on the map Undisclosed
57.1 / 100
Jurisdiction centroid
Bridge Data Centres MY07 (Ulu Tiram) Malaysia — Johor (Johor-Singapore SEZ) Construction Construction No announced timeline — ghosted on the map Undisclosed
53.6 / 100
Jurisdiction centroid
CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract Australia Permitted Pre-construction No announced timeline — ghosted on the map Undisclosed
58 / 100
Jurisdiction centroid
Crusoe / Lancium Abilene AI Campus (Stargate) US — Texas (ERCOT) Construction Live Undisclosed
54 / 100
Jurisdiction centroid
CyrusOne New Albany COL-1 US — Ohio (AEP Ohio / PJM) Construction Construction No announced timeline — ghosted on the map Undisclosed
52.8 / 100
Jurisdiction centroid
CyrusOne Project Peach (Coweta County) US — Georgia (Southern/Georgia Power) Permitted Pre-construction No announced timeline — ghosted on the map Undisclosed
63 / 100
Jurisdiction centroid
CyrusOne Whitney Campus (DFW10 series, Bosque County) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map Undisclosed
53.5 / 100
Jurisdiction centroid
DC BLOX Atlanta East (Rockdale County) US — Georgia (Southern/Georgia Power) Construction Construction No announced timeline — ghosted on the map Undisclosed
60.8 / 100
Jurisdiction centroid
du-Microsoft Hyperscale Data Center (Dubai) United Arab Emirates Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
69 / 100
Jurisdiction centroid
EdgeConneX New Albany Campus US — Ohio (AEP Ohio / PJM) Construction Live Live: announced Apr 2026 (resolves ) Undisclosed
53.5 / 100
Jurisdiction centroid
EdgeCore Culpeper Campus US — Virginia (PJM/Dominion) Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
51 / 100
Jurisdiction centroid
Empyrion KR1 Gangnam (Seoul) South Korea Operating Live Undisclosed
58 / 100
Jurisdiction centroid
Energy Capital Partners / Calpine York 2 Data Center US — Pennsylvania (PJM) Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
51 / 100
Jurisdiction centroid
Google / Intersect Meitner Energy Center (Texas Panhandle) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map Undisclosed
59 / 100
Jurisdiction centroid
Google Chesterfield Data Center Campus (Project Peanut) US — Virginia (PJM/Dominion) Permitting Construction Construction: announced H1 2026 (resolves ) Undisclosed
71.5 / 100
City
Google Council Bluffs Data Center US — Iowa (MISO) Operating Live Undisclosed
63.5 / 100
Jurisdiction centroid
Google Douglas County Data Center US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
59.5 / 100
Jurisdiction centroid
Google Fort Wayne Data Center US — Indiana (MISO) Construction Construction No announced timeline — ghosted on the map Undisclosed
59 / 100
Jurisdiction centroid
Google Goodnight Campus (Armstrong County, TX) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map Undisclosed
59.6 / 100
City
Google Hanau Data Center Germany Operating Live Undisclosed
57.5 / 100
Jurisdiction centroid
Google Haskell County Data Centers US — Texas (ERCOT) Construction Live Live: announced Jun 2026 (resolves ) Undisclosed
77 / 100
City
Google Lenoir Data Center US — North Carolina (Duke Energy) Operating Live Undisclosed
59.5 / 100
Jurisdiction centroid
Google Mesa Data Center US — Arizona (APS/SRP) Construction Construction No announced timeline — ghosted on the map Undisclosed
55 / 100
Jurisdiction centroid
Google Midlothian Campus - Building 5 (Sharka) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map Undisclosed
57.3 / 100
Jurisdiction centroid
Google New Albany Campus (Montauk Innovations) US — Ohio (AEP Ohio / PJM) Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
51 / 100
Jurisdiction centroid
Google Project Pegasus (LaGrange) US — Georgia (Southern/Georgia Power) Construction Construction No announced timeline — ghosted on the map Undisclosed
67.8 / 100
Jurisdiction centroid
Google Tussenweg / Green Box Computing (Hollands Kroon) Netherlands Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
62.5 / 100
City
Google Waltham Cross Data Centre United Kingdom Operating Live Undisclosed
56.5 / 100
Jurisdiction centroid
Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) US — Virginia (PJM/Dominion) Construction Construction No announced timeline — ghosted on the map Undisclosed
53.5 / 100
Jurisdiction centroid
Iron Mountain VA-1 (Manassas) US — Virginia (PJM/Dominion) Operating Live Undisclosed
69.5 / 100
Jurisdiction centroid
Meta (Facebook) Forest City Data Center US — North Carolina (Duke Energy) Operating Live Undisclosed
60 / 100
Jurisdiction centroid
Meta Altoona Data Center US — Iowa (MISO) Construction Construction No announced timeline — ghosted on the map Undisclosed
55 / 100
Jurisdiction centroid
Meta Henrico Data Center (White Oak Technology Park) US — Virginia (PJM/Dominion) Operating Live Undisclosed
62 / 100
Jurisdiction centroid
Meta Jeffersonville Data Center US — Indiana (MISO) Construction Construction No announced timeline — ghosted on the map Undisclosed
55.3 / 100
Jurisdiction centroid
Meta Mesa Data Center US — Arizona (APS/SRP) Announced Live Undisclosed
54.5 / 100
Jurisdiction centroid
Meta Stanton Springs / Newton Data Center US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
74 / 100
City
Microsoft Boydton Campus US — Virginia (PJM/Dominion) Operating Live Undisclosed
54 / 100
City
Microsoft Fairwater (Mount Pleasant) US — Rest of US (composite) Energized Live Undisclosed
73.3 / 100
City
Microsoft Fairwater Atlanta US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
64 / 100
City
Microsoft Granger Data Center (St. Joe Farms) US — Indiana (MISO) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
51 / 100
Jurisdiction centroid
Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) Netherlands Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
51 / 100
City
Microsoft Mount Pleasant Data Center Campus US — Wisconsin (MISO) Construction Construction No announced timeline — ghosted on the map Undisclosed
53.5 / 100
Jurisdiction centroid
Microsoft New Albany Data Centers US — Ohio (AEP Ohio / PJM) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
51 / 100
Jurisdiction centroid
Microsoft Palmetto Data Center US — Georgia (Southern/Georgia Power) Construction Construction No announced timeline — ghosted on the map Undisclosed
59 / 100
Jurisdiction centroid
Microsoft Southeast Asia 3 Region (Johor Bahru) Malaysia — Johor (Johor-Singapore SEZ) Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
47.5 / 100
Jurisdiction centroid
Microsoft West Des Moines Data Centers US — Iowa (MISO) Operating Live Undisclosed
58 / 100
Jurisdiction centroid
NEXTDC M3 (West Footscray, Melbourne) Australia Operating Live Undisclosed
69.5 / 100
Jurisdiction centroid
NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) Australia Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
58.5 / 100
Jurisdiction centroid
Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) United Kingdom Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
47.5 / 100
Jurisdiction centroid
NTT Grove at Gainesville Campus (VA10-VA13) US — Virginia (PJM/Dominion) Construction Live Undisclosed
56.5 / 100
Jurisdiction centroid
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Argentina Announced Pre-construction Live: announced 2030 (resolves ) Undisclosed
51 / 100
Jurisdiction centroid
PowerHouse 95 (Spotsylvania) US — Virginia (PJM/Dominion) Construction Construction No announced timeline — ghosted on the map Undisclosed
53.5 / 100
Jurisdiction centroid
Prince William Digital Gateway (QTS / Compass) US — Virginia (PJM/Dominion) Cancelled Pre-construction No announced timeline — ghosted on the map Undisclosed
10 / 100
City
Project Gravity (Archbald / Gouldsboro Data Center Campus) US — Pennsylvania (PJM) Stalled Pre-construction No announced timeline — ghosted on the map Undisclosed
35 / 100
Jurisdiction centroid
Prologis Project Sail (Coweta County) US — Georgia (Southern/Georgia Power) Permitted Pre-construction No announced timeline — ghosted on the map Undisclosed
63 / 100
Jurisdiction centroid
Prologis Shelbyville Data Center Campus US — Indiana (MISO) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
63 / 100
Jurisdiction centroid
QTS Atlanta Metro DC1 US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
69.5 / 100
Jurisdiction centroid
QTS Fayetteville Campus (Project Excalibur) US — Georgia (Southern/Georgia Power) Construction Live Undisclosed
56 / 100
Jurisdiction centroid
QTS Salem Township Campus US — Pennsylvania (PJM) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
60.5 / 100
Jurisdiction centroid
QTS White Oak Expansion (RIC4/RIC5, Henrico) US — Virginia (PJM/Dominion) Permitted Pre-construction No announced timeline — ghosted on the map Undisclosed
63 / 100
Jurisdiction centroid
Rowan Project Temple (Bell County) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map Undisclosed
59 / 100
Jurisdiction centroid
SK Group + AWS Ulsan AI Data Center South Korea Construction Construction No announced timeline — ghosted on the map Undisclosed
51 / 100
Jurisdiction centroid
Skybox / Prologis PowerCampus Austin (Hutto) US — Texas (ERCOT) Construction Construction No announced timeline — ghosted on the map Undisclosed
66 / 100
Jurisdiction centroid
Stack Infrastructure Berry Hill Megasite (Pittsylvania) US — Virginia (PJM/Dominion) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
62.5 / 100
Jurisdiction centroid
Switch The Keep Campus (Douglas County) US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
61.5 / 100
Jurisdiction centroid
Telecom Argentina Edge AI Data Center Conversion Program Argentina Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
48.4 / 100
Jurisdiction centroid

Markers are sized by disclosed capacity and colored by the latest project health score (0–100); the capacity heat layer (Heat / Markers / Both toggle) is weighted purely by stored MW — undisclosed capacity registers only a trace of presence, never an estimate. Undisclosed sites are plotted at their jurisdiction's centroid and labeled as such — a centroid is never presented as an exact site location. The phase filter and month scrubber move projects through phases per announced timelines — as announced by developers and press, not a Compute Institute forecast; a milestone dated only "2028" resolves to the end of its stated period. Projects with no announced timeline are ghosted at low opacity on the map — shown, never hidden silently, never interpolated.

Capacity pipeline by status

#pipeline

Construction-stage projects carry the most tracked capacity: 44,878 MW (39.0% of the 115,101 MW pipeline).

Interactive chart — the same data is in the table below.

Data table — Capacity pipeline by status
Status
Projects
Tracked MW
Announced 28 36,082 MW
Planned 18 6,763 MW
Permitting 3 0 MW
Permitted 12 14,528 MW
Construction 58 44,878 MW
Energized 2 2,000 MW
Commissioned 1 152 MW
Operating 29 5,398 MW
Stalled 3 4,700 MW
Cancelled 2 600 MW

Lifecycle order; MW sums cover projects with a stored capacity figure (77 without one). Statuses and capacities are provenance-backed project fields. Each stage links to the projects dashboard pre-filtered to that status.

Projected pipeline — per announced timelines

#projected

Per announced timelines, tracked operating capacity reaches 60.7 GW by 2032 — 81 projects carry no dated timeline and are shown separately, never interpolated.

This projection aggregates announced, cited timeline claims — as announced by developers and press, not a Compute Institute forecast. A milestone dated only "2028" resolves to the end of its stated period (December 2028); date precision is respected, never sharpened. 81 of 156 tracked projects carry no announced timeline and are bucketed visibly as such — never interpolated.

Interactive chart — the same data is in the table below.

Data table — Projected pipeline — per announced timelines

Snapshot — October 2028, per announced timelines

Phase at October 2028
Projects
Tracked MW
Projects in this phase
Operating 66 53,172 MW Fermi America Project Matador HyperGrid (Energization, announced H2 2026); GW Ranch (Pacifico Energy) (Energization, announced Q1 2027); SoftBank France AI Data Center Program (Hauts-de-France); Homer City Energy Campus (Commissioning, announced 2027); MSB Global Services Matrix Data Center Campus (Commissioning, announced Mar 2026); AWS Project Rainier (New Carlisle); Poolside Project Horizon (Energization, announced Dec 2025); Sweetwater 1 and 2 (IREN); AREP PowerHouse Grand Prairie (Energization, announced May 2026); Vantage Data Centers Frontier (Shackelford County / Stargate) (Commissioning, announced H2 2026); CloudBurst Data Center (New Braunfels) (Energization, announced 2026); Stargate Abilene (Crusoe campus); Stargate Milam County (OpenAI / SB Energy) (Commissioning, announced Oct 2026); Crane Clean Energy Center (Energization, announced 1970); Meta Prometheus (New Albany) (Energization, announced Q3 2026); Stargate Michigan - The Barn (Saline Township) (Commissioning, announced H1 2028); Stargate New Mexico - Project Jupiter (Dona Ana County) (Commissioning, announced 2026); Stargate UAE (Abu Dhabi) (First 200 MW phase of Stargate UAE live, announced Q3 2026); xAI Colossus 2 (Memphis); Robena Mine Data Center (Project Hummingbird) (Commissioning, announced 1970); Stargate Wisconsin - Vantage Lighthouse (Port Washington) (Commissioning, announced Q3 2027); Nexus Data Center (Hubbard) (Energization, announced 2026); Stargate Argentina (Patagonia) (Energization, announced 2027); EdgeCore Mesa (Greater Phoenix); Stack Infrastructure NVA02 (Manassas); Novva Data Centers Mesa (Commissioning, announced Q4 2026); Vantage Data Centers Ashburn I (VA1); Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) (Energization, announced 2026); T5 @ Atlanta IV (Palmetto) (Commissioning, announced 2027); Vantage Data Centers OH1 (New Albany) (Commissioning, announced 2025); Edged Atlanta ATL01 Campus (Tilford Yard); Meta Temple Data Center; DC BLOX Atlanta West (Energization, announced 2027); Khazna QAJ1 Ajman AI Data Center (Commissioning, announced Dec 2026); NEXTDC S3 (Sydney); T5 @ Charlotte II (Kings Mountain) (Commissioning, announced 2026); QTS Ashburn 1 (ASH1); Digital Edge SEL2 (Incheon); Khazna AUH8 Masdar City AI Data Center (Commissioning, announced Aug 2026); NTT VA6 (Ashburn); Cirion BUE1 Buenos Aires Expansion; Apple Maiden Data Center; AWS New Albany Data Center Campus; Crusoe / Lancium Abilene AI Campus (Stargate); EdgeConneX New Albany Campus (Commissioning, announced Apr 2026); Empyrion KR1 Gangnam (Seoul); Google Council Bluffs Data Center; Google Douglas County Data Center; Google Hanau Data Center; Google Haskell County Data Centers (Energization, announced Jun 2026); Google Lenoir Data Center; Google Waltham Cross Data Centre; Iron Mountain VA-1 (Manassas); Meta (Facebook) Forest City Data Center; Meta Henrico Data Center (White Oak Technology Park); Meta Mesa Data Center; Meta Stanton Springs / Newton Data Center; Microsoft Boydton Campus; Microsoft Fairwater (Mount Pleasant); Microsoft Fairwater Atlanta; Microsoft West Des Moines Data Centers; NEXTDC M3 (West Footscray, Melbourne); NTT Grove at Gainesville Campus (VA10-VA13); QTS Atlanta Metro DC1; QTS Fayetteville Campus (Project Excalibur); Switch The Keep Campus (Douglas County)
Construction 6 4,820 MW Meta Hyperion (Richland Parish); AWS Susquehanna Nuclear Data Center Campus; Cologix Johnstown AI-Ready Campus (Groundbreaking, announced 2025); Meta El Paso Data Center; AWS Louisa County Campuses (Lake Anna Tech Campus); Google Chesterfield Data Center Campus (Project Peanut) (Groundbreaking, announced H1 2026)
Pre-construction 3 3,500 MW Tract Caldwell County Technology Park; Crusoe / Blue Energy Data Center (Victoria, TX); Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City)
No announced timeline 81 53,609 MW known SB Energy AI Campus (Pike County, Ohio) (Construction); Stratos Project (Announced); Comanche Circle (Permitted); Shippingport / Bruce Mansfield Data Center (Project Phoenix) (Permitted); TECfusions Keystone Connect (Upper Burrell) (Planned); Google Project Skyway (Pine Island, MN) (Stalled); Eneus Energy Cameron County data center (Announced); Microsoft Pecos data center campus (Announced); Wheatfield data center and gas plant (Announced); Talen Energy - AWS Susquehanna PPA (Announced); Crusoe Callaway County Missouri data center (Announced); Joliet data center campus (Announced); Yorkville data center campus (Announced); Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus (Announced); Meta Lebanon Data Center Campus (LEAP District) (Construction); Amazon / AWS Salem Township Data Center Campus (Susquehanna) (Construction); Project Aggie (College Station) (Cancelled); Aligned Project Caprock (Hale County) (Construction); DataBank Red Oak Campus (South Dallas) (Construction); Vantage Pittsboro Campus (Permitted); Project Comal (Permitted); Rowan Cinco Data Center Campus (Medina County) (Construction); Compass Datacenters Goodyear (Construction); DataBank Culpeper Campus (IAD5/IAD6) (Planned); Vantage Data Centers AZ1 (Goodyear) (Construction); DataBank Lithia Springs Campus (ATL5/ATL6) (Construction); CoreWeave Lancaster AI Data Center Campus (Planned); Microsoft Project Rita (Tyrone) (Permitted); Metrobloks IND-A1 (Indianapolis) (Permitted); Equinix SG6 (Singapore) (Construction); DC BLOX Henrico (Wilkinson Road) (Construction); ARSAT Benavidez Data Center Hall IV Expansion (Planned); AirTrunk Osaka Campus (OSK1 + OSK2) (Construction); AirTrunk SYD3 (Western Sydney) (Permitting); Aligned IAD-02 (Ashburn) (Construction); Amazon / AWS Falls Township Data Center (Keystone Trade Center) (Construction); Amazon Devlin Technology Park (Bristow) (Planned); AWS Desper Creek Technology Campus (Louisa County) (Permitting); AWS Georgia Data Center Campuses (Butts & Douglas Counties) (Planned); AWS Hilliard Third Campus (Scioto Darby Road) (Permitted); Blackstone QTS Cambois Campus (Blyth) (Construction); Bridge Data Centres MY07 (Ulu Tiram) (Construction); CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract (Permitted); CyrusOne New Albany COL-1 (Construction); CyrusOne Project Peach (Coweta County) (Permitted); CyrusOne Whitney Campus (DFW10 series, Bosque County) (Construction); DC BLOX Atlanta East (Rockdale County) (Construction); du-Microsoft Hyperscale Data Center (Dubai) (Planned); EdgeCore Culpeper Campus (Announced); Energy Capital Partners / Calpine York 2 Data Center (Announced); Google / Intersect Meitner Energy Center (Texas Panhandle) (Construction); Google Fort Wayne Data Center (Construction); Google Goodnight Campus (Armstrong County, TX) (Construction); Google Mesa Data Center (Construction); Google Midlothian Campus - Building 5 (Sharka) (Construction); Google New Albany Campus (Montauk Innovations) (Announced); Google Project Pegasus (LaGrange) (Construction); Google Tussenweg / Green Box Computing (Hollands Kroon) (Announced); Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) (Construction); Meta Altoona Data Center (Construction); Meta Jeffersonville Data Center (Construction); Microsoft Granger Data Center (St. Joe Farms) (Planned); Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) (Announced); Microsoft Mount Pleasant Data Center Campus (Construction); Microsoft New Albany Data Centers (Planned); Microsoft Palmetto Data Center (Construction); Microsoft Southeast Asia 3 Region (Johor Bahru) (Announced); NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) (Announced); Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) (Announced); PowerHouse 95 (Spotsylvania) (Construction); Prince William Digital Gateway (QTS / Compass) (Cancelled); Project Gravity (Archbald / Gouldsboro Data Center Campus) (Stalled); Prologis Project Sail (Coweta County) (Permitted); Prologis Shelbyville Data Center Campus (Planned); QTS Salem Township Campus (Planned); QTS White Oak Expansion (RIC4/RIC5, Henrico) (Permitted); Rowan Project Temple (Bell County) (Construction); SK Group + AWS Ulsan AI Data Center (Construction); Skybox / Prologis PowerCampus Austin (Hutto) (Construction); Stack Infrastructure Berry Hill Megasite (Pittsylvania) (Planned); Telecom Argentina Edge AI Data Center Conversion Program (Announced)

Announced milestone dates — all tracked projects

Project
Milestone
Announced date
Precision
Resolves to
Evidence
Fermi America Project Matador HyperGrid Energization H2 2026 Half-year
E4
Groundbreaking 2027 Year
E2
Commissioning 2033 Year
E2
SB Energy AI Campus (Pike County, Ohio) None announced — no dated milestone on record (Construction)
Stratos Project None announced — no dated milestone on record (Announced)
Comanche Circle None announced — no dated milestone on record (Permitted)
GW Ranch (Pacifico Energy) Groundbreaking Q1 2026 Quarter
E2
Energization Q1 2027 Quarter
E2
SoftBank France AI Data Center Program (Hauts-de-France) None announced — no dated milestone on record (Announced)
Homer City Energy Campus Commissioning 2027 Year
E4
Energization 2027 Year
E3
Shippingport / Bruce Mansfield Data Center (Project Phoenix) None announced — no dated milestone on record (Permitted)
MSB Global Services Matrix Data Center Campus Commissioning Mar 2026 Month
E2
TECfusions Keystone Connect (Upper Burrell) None announced — no dated milestone on record (Planned)
Google Project Skyway (Pine Island, MN) None announced — no dated milestone on record (Stalled)
AWS Project Rainier (New Carlisle) Groundbreaking 2026 Year
E4
Eneus Energy Cameron County data center None announced — no dated milestone on record (Announced)
Meta Hyperion (Richland Parish) Energization 2028 Year
E4
Commissioning 2030 Year
E4
Microsoft Pecos data center campus None announced — no dated milestone on record (Announced)
Poolside Project Horizon Energization Dec 2025 Month
E3
Commissioning 2027 Year
E3
Sweetwater 1 and 2 (IREN) Energization 2027 Year
E2
Tract Caldwell County Technology Park Energization 2028 Year
E2
Wheatfield data center and gas plant None announced — no dated milestone on record (Announced)
AWS Susquehanna Nuclear Data Center Campus Energization 2029 Year
E3
Energization 2032 Year
E3
Talen Energy - AWS Susquehanna PPA None announced — no dated milestone on record (Announced)
AREP PowerHouse Grand Prairie Groundbreaking Q1 2025 Quarter
E3
Energization May 2026 Month
E2
Crusoe Callaway County Missouri data center None announced — no dated milestone on record (Announced)
Joliet data center campus None announced — no dated milestone on record (Announced)
Yorkville data center campus None announced — no dated milestone on record (Announced)
Crusoe / Blue Energy Data Center (Victoria, TX) Energization 2028 Year
E2
Vantage Data Centers Frontier (Shackelford County / Stargate) Commissioning H2 2026 Half-year
E3
Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus None announced — no dated milestone on record (Announced)
CloudBurst Data Center (New Braunfels) Energization 2026 Year
E2
Stargate Abilene (Crusoe campus) Phase 2 energization — full 1.2 GW campus (eight buildings) H1 2026 Half-year
E2
Commissioning H1 2026 Half-year
E4
Stargate Milam County (OpenAI / SB Energy) Commissioning Oct 2026 Month
E4
Energization 2026 Year
E4
Crane Clean Energy Center Energization 1970 Year
E2
Meta Lebanon Data Center Campus (LEAP District) None announced — no dated milestone on record (Construction)
Meta Prometheus (New Albany) Energization Q3 2026 Quarter
E4
E4
Stargate Michigan - The Barn (Saline Township) Commissioning H1 2028 Half-year
E4
Stargate New Mexico - Project Jupiter (Dona Ana County) Commissioning 2026 Year
E3
Stargate UAE (Abu Dhabi) First 200 MW phase of Stargate UAE live Q3 2026 Quarter
E4
E4
E2
xAI Colossus 2 (Memphis) Energization Apr 2026 Month
E4
Energization Q2 2027 Quarter
E4
Amazon / AWS Salem Township Data Center Campus (Susquehanna) None announced — no dated milestone on record (Construction)
Robena Mine Data Center (Project Hummingbird) Commissioning 1970 Year
E3
Stargate Wisconsin - Vantage Lighthouse (Port Washington) Commissioning Q3 2027 Quarter
E4
Commissioning 2028 Year
E3
Cologix Johnstown AI-Ready Campus Groundbreaking 2025 Year
E2
Nexus Data Center (Hubbard) Energization 2026 Year
E2
Project Aggie (College Station) Announcement Sep 9, 2025 Exact day
E3
Aligned Project Caprock (Hale County) None announced — no dated milestone on record (Construction)
Stargate Argentina (Patagonia) Groundbreaking 2026 Year
E3
Energization 2027 Year
E3
EdgeCore Mesa (Greater Phoenix) None announced — no dated milestone on record (Construction)
DataBank Red Oak Campus (South Dallas) None announced — no dated milestone on record (Construction)
Stack Infrastructure NVA02 (Manassas) None announced — no dated milestone on record (Operating)
Vantage Pittsboro Campus None announced — no dated milestone on record (Permitted)
Project Comal None announced — no dated milestone on record (Permitted)
Novva Data Centers Mesa Commissioning Q4 2026 Quarter
E3
Rowan Cinco Data Center Campus (Medina County) None announced — no dated milestone on record (Construction)
Compass Datacenters Goodyear None announced — no dated milestone on record (Construction)
Vantage Data Centers Ashburn I (VA1) None announced — no dated milestone on record (Operating)
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) Energization 2026 Year
E3
T5 @ Atlanta IV (Palmetto) Commissioning 2027 Year
E2
DataBank Culpeper Campus (IAD5/IAD6) None announced — no dated milestone on record (Planned)
Vantage Data Centers OH1 (New Albany) Commissioning 2025 Year
E2
Vantage Data Centers AZ1 (Goodyear) None announced — no dated milestone on record (Construction)
Edged Atlanta ATL01 Campus (Tilford Yard) None announced — no dated milestone on record (Operating)
Meta Temple Data Center None announced — no dated milestone on record (Commissioned)
DataBank Lithia Springs Campus (ATL5/ATL6) None announced — no dated milestone on record (Construction)
DC BLOX Atlanta West Energization 2027 Year
E2
CoreWeave Lancaster AI Data Center Campus None announced — no dated milestone on record (Planned)
Khazna QAJ1 Ajman AI Data Center Commissioning Dec 2026 Month
E5
Meta El Paso Data Center Energization 2028 Year
E4
Microsoft Project Rita (Tyrone) None announced — no dated milestone on record (Permitted)
NEXTDC S3 (Sydney) None announced — no dated milestone on record (Operating)
Metrobloks IND-A1 (Indianapolis) None announced — no dated milestone on record (Permitted)
T5 @ Charlotte II (Kings Mountain) Commissioning 2026 Year
E2
QTS Ashburn 1 (ASH1) Energization Q2 2026 Quarter
E2
Digital Edge SEL2 (Incheon) None announced — no dated milestone on record (Operating)
Khazna AUH8 Masdar City AI Data Center Commissioning Aug 2026 Month
E4
NTT VA6 (Ashburn) None announced — no dated milestone on record (Operating)
Equinix SG6 (Singapore) None announced — no dated milestone on record (Construction)
DC BLOX Henrico (Wilkinson Road) None announced — no dated milestone on record (Construction)
Cirion BUE1 Buenos Aires Expansion Commissioning Nov 2025 Month
E4
ARSAT Benavidez Data Center Hall IV Expansion None announced — no dated milestone on record (Planned)
AirTrunk Osaka Campus (OSK1 + OSK2) None announced — no dated milestone on record (Construction)
AirTrunk SYD3 (Western Sydney) None announced — no dated milestone on record (Permitting)
Aligned IAD-02 (Ashburn) None announced — no dated milestone on record (Construction)
Amazon / AWS Falls Township Data Center (Keystone Trade Center) None announced — no dated milestone on record (Construction)
Amazon Devlin Technology Park (Bristow) None announced — no dated milestone on record (Planned)
Apple Maiden Data Center None announced — no dated milestone on record (Operating)
AWS Desper Creek Technology Campus (Louisa County) None announced — no dated milestone on record (Permitting)
AWS Georgia Data Center Campuses (Butts & Douglas Counties) None announced — no dated milestone on record (Planned)
AWS Hilliard Third Campus (Scioto Darby Road) None announced — no dated milestone on record (Permitted)
AWS Louisa County Campuses (Lake Anna Tech Campus) Commissioning 2040 Year
E2
AWS New Albany Data Center Campus None announced — no dated milestone on record (Operating)
Blackstone QTS Cambois Campus (Blyth) None announced — no dated milestone on record (Construction)
Bridge Data Centres MY07 (Ulu Tiram) None announced — no dated milestone on record (Construction)
CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract None announced — no dated milestone on record (Permitted)
Crusoe / Lancium Abilene AI Campus (Stargate) None announced — no dated milestone on record (Construction)
CyrusOne New Albany COL-1 None announced — no dated milestone on record (Construction)
CyrusOne Project Peach (Coweta County) Utility Approval Oct 2026 Month
E2
CyrusOne Whitney Campus (DFW10 series, Bosque County) None announced — no dated milestone on record (Construction)
DC BLOX Atlanta East (Rockdale County) None announced — no dated milestone on record (Construction)
du-Microsoft Hyperscale Data Center (Dubai) None announced — no dated milestone on record (Planned)
EdgeConneX New Albany Campus Commissioning Apr 2026 Month
E2
EdgeCore Culpeper Campus None announced — no dated milestone on record (Announced)
Empyrion KR1 Gangnam (Seoul) None announced — no dated milestone on record (Operating)
Energy Capital Partners / Calpine York 2 Data Center None announced — no dated milestone on record (Announced)
Google / Intersect Meitner Energy Center (Texas Panhandle) None announced — no dated milestone on record (Construction)
Google Chesterfield Data Center Campus (Project Peanut) Groundbreaking H1 2026 Half-year
E4
Google Council Bluffs Data Center None announced — no dated milestone on record (Operating)
Google Douglas County Data Center None announced — no dated milestone on record (Operating)
Google Fort Wayne Data Center None announced — no dated milestone on record (Construction)
Google Goodnight Campus (Armstrong County, TX) None announced — no dated milestone on record (Construction)
Google Hanau Data Center None announced — no dated milestone on record (Operating)
Google Haskell County Data Centers Energization Jun 2026 Month
E4
Google Lenoir Data Center None announced — no dated milestone on record (Operating)
Google Mesa Data Center None announced — no dated milestone on record (Construction)
Google Midlothian Campus - Building 5 (Sharka) None announced — no dated milestone on record (Construction)
Google New Albany Campus (Montauk Innovations) None announced — no dated milestone on record (Announced)
Google Project Pegasus (LaGrange) None announced — no dated milestone on record (Construction)
Google Tussenweg / Green Box Computing (Hollands Kroon) None announced — no dated milestone on record (Announced)
Google Waltham Cross Data Centre None announced — no dated milestone on record (Operating)
Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) None announced — no dated milestone on record (Construction)
Iron Mountain VA-1 (Manassas) None announced — no dated milestone on record (Operating)
Meta (Facebook) Forest City Data Center None announced — no dated milestone on record (Operating)
Meta Altoona Data Center None announced — no dated milestone on record (Construction)
Meta Henrico Data Center (White Oak Technology Park) None announced — no dated milestone on record (Operating)
Meta Jeffersonville Data Center None announced — no dated milestone on record (Construction)
Meta Mesa Data Center None announced — no dated milestone on record (Announced)
Meta Stanton Springs / Newton Data Center Commissioning Dec 31, 2026 Exact day
E4
Commissioning 2028 Year
E4
Commissioning 2030 Year
E4
Commissioning 2032 Year
E4
Microsoft Boydton Campus None announced — no dated milestone on record (Operating)
Microsoft Fairwater (Mount Pleasant) Energization 2026 Year
E3
Energization H2 2027 Half-year
E4
Microsoft Fairwater Atlanta None announced — no dated milestone on record (Operating)
Microsoft Granger Data Center (St. Joe Farms) None announced — no dated milestone on record (Planned)
Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) None announced — no dated milestone on record (Announced)
Microsoft Mount Pleasant Data Center Campus None announced — no dated milestone on record (Construction)
Microsoft New Albany Data Centers None announced — no dated milestone on record (Planned)
Microsoft Palmetto Data Center None announced — no dated milestone on record (Construction)
Microsoft Southeast Asia 3 Region (Johor Bahru) None announced — no dated milestone on record (Announced)
Microsoft West Des Moines Data Centers None announced — no dated milestone on record (Operating)
NEXTDC M3 (West Footscray, Melbourne) None announced — no dated milestone on record (Operating)
NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) None announced — no dated milestone on record (Announced)
Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) None announced — no dated milestone on record (Announced)
NTT Grove at Gainesville Campus (VA10-VA13) None announced — no dated milestone on record (Construction)
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Commissioning 2030 Year
E4
PowerHouse 95 (Spotsylvania) None announced — no dated milestone on record (Construction)
Prince William Digital Gateway (QTS / Compass) None announced — no dated milestone on record (Cancelled)
Project Gravity (Archbald / Gouldsboro Data Center Campus) None announced — no dated milestone on record (Stalled)
Prologis Project Sail (Coweta County) None announced — no dated milestone on record (Permitted)
Prologis Shelbyville Data Center Campus None announced — no dated milestone on record (Planned)
QTS Atlanta Metro DC1 None announced — no dated milestone on record (Operating)
QTS Fayetteville Campus (Project Excalibur) None announced — no dated milestone on record (Construction)
QTS Salem Township Campus None announced — no dated milestone on record (Planned)
QTS White Oak Expansion (RIC4/RIC5, Henrico) None announced — no dated milestone on record (Permitted)
Rowan Project Temple (Bell County) None announced — no dated milestone on record (Construction)
SK Group + AWS Ulsan AI Data Center None announced — no dated milestone on record (Construction)
Skybox / Prologis PowerCampus Austin (Hutto) None announced — no dated milestone on record (Construction)
Stack Infrastructure Berry Hill Megasite (Pittsylvania) None announced — no dated milestone on record (Planned)
Switch The Keep Campus (Douglas County) None announced — no dated milestone on record (Operating)
Telecom Argentina Edge AI Data Center Conversion Program None announced — no dated milestone on record (Announced)

Phases derive from milestone-type transitions (groundbreaking → construction; energization/commissioning → operating) plus current statuses. 47 of 156 projects carry dated milestone claims (64 dated milestones; precision mix: 2 day, 11 month, 9 quarter, 7 half, 35 year). Already-due claims apply from the current month; nothing is interpolated or forecast.