Eight visual surfaces over Compute Institute's live ratings data — the Jurisdiction Index dimension heatmap, score history, and radar, tracked-capacity treemap and status pipeline, evidenced capital flows, the global project map, and the projected pipeline built from announced, cited timeline claims. Every chart is backed by the same data in plain HTML tables, with methodology and citations linked where scores appear.

Jurisdiction Index dimension heatmap

#index-heatmap

Qatar leads 3 of 7 dimensions across the 30 rated jurisdictions.

Interactive chart — the same data is in the table below.

Data table — Jurisdiction Index dimension heatmap
Jurisdiction
JCI
Power
Cost
Speed
Regulatory
Fiscal
Capital
Stability
Qatar 77.4 6.9 8.4 6.6 8 8.4 8.5
US — Texas (ERCOT) 72.3 6.4 7.1 7.8 7 7.2 7.4 8
United Arab Emirates 69.7 6.4 6.3 7.2 6.5 7.4 8 7.4
US — Arizona (APS/SRP) 67.2 5.1 6.8 6.9 6.4 7.7 7.3 7.7
US — Georgia (Southern/Georgia Power) 67.2 6 6.3 7 6.3 6.8 6.3 8.3
Saudi Arabia 65.2 5.8 7 6.8 5.7 6.5 7.4 6.9
US — North Carolina (Duke Energy) 63.4 4.7 6.4 6.7 7 7.8
US — Rest of US (composite) 63.4 5.1 5.9 6.3 6.1 6.4 6.9 8.1
Sweden 63.1 6.5 7.3 4 6 4.5 7 8.8
Canada 62.3 5.2 6.9 5.9 6.1 5.4 5.9 8.5
France 62.3 6.5 5.9 5.6 5.9 5.5 6.3 7.6
Australia 61.9 5.9 4.9 4.8 6.9 4.7 7.6 8.6
US — Virginia (PJM/Dominion) 61.6 3.9 5 6.8 5.8 6.6 7.7 8.3
US — Ohio (AEP Ohio / PJM) 61.2 4.3 4.5 6.5 6.5 6.1 8 7.7
Denmark 60.2 4.2 4.8 5.9 7.1 5.1 6.5 8.9
US — Minnesota (Xcel / MISO) 59.3 5.5 6.6 6 6.4 5 3.3 8.4
Singapore 59 2.8 4.3 6.9 6 6.7 6.7 9
Malaysia — Johor (Johor-Singapore SEZ) 58.9 6.8 4.2 6.2 6.2 5.5
Japan 58.6 4.7 1.6 6 8 5.7 7.8 7.6
United Kingdom 57 4.5 3.3 5.5 7.1 5 6.4 8.2
Germany 56.7 4.6 3.2 6 6.2 3.7 7.4 8.3
India 54.9 4.9 5.1 5.7 5.2 5.9 6.1 6
Ireland 54.1 3 1.7 5.4 6.4 8.5 8.5
Indonesia 53.6 3.9 6.4 5 5.5 6.1 7 4.9
South Africa 52.3 3.9 4.4 6.5 5.4 4.9 6.4 5.4
Brazil 50.9 6.3 2.7 5 5.6 4.5 6.4 4.5
Argentina 50.7 4.5 6 5.5 5 7 5.4 3
Poland 50.7 4.2 3.2 4.5 6.2 6.5 6.6
Netherlands 50.3 2.8 3.2 3.7 5.2 4.7 8.5 8.3
South Korea 49 3.6 2.2 5 5.8 5 7.9 5.6

Dimension scores 0–10, composite JCI 0–100; "—" = not yet evidenced at E1–E2. Methodology v0 — every score traces to cited sources on the jurisdiction page.

JCI score history

#history

Score history begins June 14, 2026 — 30 jurisdictions scored across 2 scoring runs so far; trend lines deepen as new runs publish.

Interactive chart — the same data is in the table below.

Data table — JCI score history
Jurisdiction
Run date
Methodology
JCI
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
Singapore v0 59
Sweden v0 63.1
Qatar v0 77.4
Saudi Arabia v0 65.2
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
Japan v0 58.6
South Korea v0 49
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Denmark v0 60.2
France v0 62.3
Germany v0 56.7
Australia v0 61.9
Brazil v0 50.9
Canada v0 62.3
Argentina v0 50.7
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Rest of US (composite) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Georgia (Southern/Georgia Power) v0 67.2
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
Sweden v0 63.1
Qatar v0 77.4
Saudi Arabia v0 65.2
Poland v0 50.7
Netherlands v0 50.3
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
India v0 54.9
Japan v0 58.6
Ireland v0 54.1
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Denmark v0 60.2
Germany v0 56.7
Canada v0 62.3
Australia v0 61.9
Brazil v0 50.9
Argentina v0 50.7
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Virginia (PJM/Dominion) v0 61.6
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Saudi Arabia v0 65.2
Sweden v0 63.1
Poland v0 50.7
Qatar v0 77.4
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
South Korea v0 49
India v0 54.9
Japan v0 58.6
Indonesia v0 53.6
Ireland v0 54.1
United Kingdom v0 57
Denmark v0 60.2
France v0 62.3
Canada v0 62.3
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
Singapore v0 59
Sweden v0 63.1
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
India v0 54.9
Japan v0 58.6
South Korea v0 49
Indonesia v0 53.6
Ireland v0 54.1
France v0 62.3
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Australia v0 61.9
Brazil v0 50.9
Argentina v0 50.7
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Virginia (PJM/Dominion) v0 61.6
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
Poland v0 50.7
Qatar v0 77.4
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
South Korea v0 49
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Denmark v0 60.2
Germany v0 56.7
Brazil v0 50.9
Canada v0 62.3
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
South Korea v0 49
Canada v0 62.3
Denmark v0 60.2
France v0 62.3
Germany v0 56.7
Indonesia v0 53.6
United Kingdom v0 57
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Rest of US (composite) v0 63.4
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Poland v0 50.7
Qatar v0 77.4
Saudi Arabia v0 65.2
Sweden v0 63.1
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
India v0 54.9
Japan v0 58.6
South Korea v0 49
Indonesia v0 53.6
Ireland v0 54.1
Denmark v0 60.2
France v0 62.3
United Kingdom v0 57
Brazil v0 50.9
Canada v0 62.3
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — Minnesota (Xcel / MISO) v0 59.3
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
Singapore v0 59
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
Qatar v0 77.4
Saudi Arabia v0 65.2
Sweden v0 63.1
Netherlands v0 50.3
Poland v0 50.7
Japan v0 58.6
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
South Korea v0 49
India v0 54.9
Indonesia v0 53.6
Ireland v0 54.1
France v0 62.3
United Kingdom v0 57
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
Brazil v0 50.9
United Arab Emirates v0 69.7
South Africa v0 52.3
US — Texas (ERCOT) v0 72.3
US — Virginia (PJM/Dominion) v0 61.6
US — North Carolina (Duke Energy) v0 63.4
US — Ohio (AEP Ohio / PJM) v0 61.2
US — Rest of US (composite) v0 63.4
US — Arizona (APS/SRP) v0 67.2
US — Georgia (Southern/Georgia Power) v0 67.2
US — Minnesota (Xcel / MISO) v0 59.3
Qatar v0 77.4
Saudi Arabia v0 65.2
Singapore v0 59
Sweden v0 63.1
Malaysia — Johor (Johor-Singapore SEZ) v0 58.9
Netherlands v0 50.3
Poland v0 50.7
India v0 54.9
Ireland v0 54.1
Japan v0 58.6
South Korea v0 49
France v0 62.3
Indonesia v0 53.6
United Kingdom v0 57
Brazil v0 50.9
Canada v0 62.3
Denmark v0 60.2
Germany v0 56.7
Argentina v0 50.7
Australia v0 61.9
United Arab Emirates v0 69.7

One row per published scoring run (jurisdiction_scores is append-only — history is recorded, never back-filled). The line chart deepens as runs accumulate.

Dimension radar — jurisdiction profiles

#radar

Across the 30 rated jurisdictions, the single strongest dimension score is Singapore in Stability & Execution Risk (9 of 10); the computed median profile is drawn for comparison.

Interactive chart — the same data is in the table below.

Data table — Dimension radar — jurisdiction profiles
Jurisdiction
JCI
Power
Cost
Speed
Regulatory
Fiscal
Capital
Stability
Qatar 77.4 6.9 8.4 6.6 8 8.4 8.5
US — Texas (ERCOT) 72.3 6.4 7.1 7.8 7 7.2 7.4 8
United Arab Emirates 69.7 6.4 6.3 7.2 6.5 7.4 8 7.4
US — Arizona (APS/SRP) 67.2 5.1 6.8 6.9 6.4 7.7 7.3 7.7
US — Georgia (Southern/Georgia Power) 67.2 6 6.3 7 6.3 6.8 6.3 8.3
Saudi Arabia 65.2 5.8 7 6.8 5.7 6.5 7.4 6.9
US — North Carolina (Duke Energy) 63.4 4.7 6.4 6.7 7 7.8
US — Rest of US (composite) 63.4 5.1 5.9 6.3 6.1 6.4 6.9 8.1
Sweden 63.1 6.5 7.3 4 6 4.5 7 8.8
Canada 62.3 5.2 6.9 5.9 6.1 5.4 5.9 8.5
France 62.3 6.5 5.9 5.6 5.9 5.5 6.3 7.6
Australia 61.9 5.9 4.9 4.8 6.9 4.7 7.6 8.6
US — Virginia (PJM/Dominion) 61.6 3.9 5 6.8 5.8 6.6 7.7 8.3
US — Ohio (AEP Ohio / PJM) 61.2 4.3 4.5 6.5 6.5 6.1 8 7.7
Denmark 60.2 4.2 4.8 5.9 7.1 5.1 6.5 8.9
US — Minnesota (Xcel / MISO) 59.3 5.5 6.6 6 6.4 5 3.3 8.4
Singapore 59 2.8 4.3 6.9 6 6.7 6.7 9
Malaysia — Johor (Johor-Singapore SEZ) 58.9 6.8 4.2 6.2 6.2 5.5
Japan 58.6 4.7 1.6 6 8 5.7 7.8 7.6
United Kingdom 57 4.5 3.3 5.5 7.1 5 6.4 8.2
Germany 56.7 4.6 3.2 6 6.2 3.7 7.4 8.3
India 54.9 4.9 5.1 5.7 5.2 5.9 6.1 6
Ireland 54.1 3 1.7 5.4 6.4 8.5 8.5
Indonesia 53.6 3.9 6.4 5 5.5 6.1 7 4.9
South Africa 52.3 3.9 4.4 6.5 5.4 4.9 6.4 5.4
Brazil 50.9 6.3 2.7 5 5.6 4.5 6.4 4.5
Argentina 50.7 4.5 6 5.5 5 7 5.4 3
Poland 50.7 4.2 3.2 4.5 6.2 6.5 6.6
Netherlands 50.3 2.8 3.2 3.7 5.2 4.7 8.5 8.3
South Korea 49 3.6 2.2 5 5.8 5 7.9 5.6
Median profile (computed) 59.8 4.8 5 5.9 6.1 6.1 7 7.9

Dimension scores 0–10 per methodology v0; full sub-factor provenance on each jurisdiction page. The chart's chips overlay up to four jurisdictions; the median profile is computed per dimension across rated jurisdictions.

Tracked capacity treemap

#treemap

US — Rest of US (composite) hosts the largest tracked capacity: 15,422 MW across 9 projects (38.7% of 39,862 tracked MW).

Interactive chart — the same data is in the table below.

Data table — Tracked capacity treemap
Jurisdiction
Projects with MW
MW undisclosed
Tracked MW
Share
US — Rest of US (composite) 9 1 15,422 MW 38.7%
US — Texas (ERCOT) 5 1 14,900 MW 37.4%
France 1 5,000 MW 12.5%
US — Minnesota (Xcel / MISO) 1 2,700 MW 6.8%
United Arab Emirates 4 1 1,330 MW 3.3%
Argentina 3 2 510 MW 1.3%
US — Georgia (Southern/Georgia Power) 0 3 0 MW 0%
US — Virginia (PJM/Dominion) 0 4 0 MW 0%

Only projects with a stored MW figure enter the sums (12 active projects without a disclosed capacity excluded, never estimated). In the chart, undisclosed projects appear as a hatched leaf per jurisdiction, drawn at the median disclosed project size for visibility only.

Capital flow — evidenced commitments

#capital-flow

211.3B USD of evidenced capital commitments span 24 entity–project links; the largest single commitment is 40.0B USD by Google into Google Haskell County Data Centers.

Interactive chart — the same data is in the table below.

Data table — Capital flow — evidenced commitments
Entity
Role
Project
Committed capital
Google Investor Google Haskell County Data Centers $40.0B
Amazon Web Services Investor AWS Susquehanna Nuclear Data Center Campus $20.0B
PIMCO Lender Meta Hyperion (Richland Parish) $18.0B
Microsoft Investor Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) $15.2B
Blue Owl Capital Investor Stargate Abilene (Crusoe campus) $15.0B
Vantage Data Centers Investor Stargate Wisconsin - Vantage Lighthouse (Port Washington) $15.0B
Amazon Web Services Investor AWS Georgia Data Center Campuses (Butts & Douglas Counties) $11.0B
Amazon Web Services Investor AWS Louisa County Campuses (Lake Anna Tech Campus) $11.0B
Amazon Web Services Investor AWS Project Rainier (New Carlisle) $11.0B
Meta Investor Meta El Paso Data Center $10.0B
Google Investor Google Chesterfield Data Center Campus (Project Peanut) $9.0B
Microsoft Investor Microsoft Fairwater (Mount Pleasant) $7.3B
JPMorgan Chase Lender Stargate Abilene (Crusoe campus) $7.1B
Blue Owl Capital Investor Meta Hyperion (Richland Parish) $7.0B
BlackRock Lender Meta Hyperion (Richland Parish) $3.0B
Abu Dhabi Commercial Bank Lender Khazna AUH8 Masdar City AI Data Center $2.6B
Microsoft Investor Microsoft Boydton Campus $2.0B
Nvidia Investor xAI Colossus 2 (Memphis) $2.0B
Microsoft Investor Microsoft Fairwater Atlanta $1.8B
Meta Investor Meta Stanton Springs / Newton Data Center $1.0B
Undisclosed equipment financing providers Lender Fermi America Project Matador HyperGrid $885.0M
Public market investors (Nasdaq & LSE IPO) Investor Fermi America Project Matador HyperGrid $785.0M
du (Emirates Integrated Telecommunications Company) Investor du-Microsoft Hyperscale Data Center (Dubai) $544.0M
ARSAT (Empresa Argentina de Soluciones Satelitales) Government Partner ARSAT Benavidez Data Center Hall IV Expansion $17.0M

Committed capital is shown only where a USD figure is on the evidence record (project–entity roles) — 178 roles without a disclosed figure are excluded, never estimated.

Global map of tracked projects

#map

35 tracked projects across 8 jurisdictions, totaling 39,862 MW of announced or in-development capacity.

Interactive chart — the same data is in the table below.

Data table — Global map of tracked projects
Project
Jurisdiction
Status
Phase at June 2026
Announced transitions
Capacity
Health score
Location
Fermi America Project Matador HyperGrid US — Texas (ERCOT) Construction Construction Live: announced H2 2026 (resolves ) 11,000 MW
80 / 100
City
SoftBank France AI Data Center Program (Hauts-de-France) France Announced Live 5,000 MW
68 / 100
City
Homer City Energy Campus US — Rest of US (composite) Construction Construction Live: announced 2027 (resolves ) 4,400 MW
71.9 / 100
City
Google Project Skyway (Pine Island, MN) US — Minnesota (Xcel / MISO) Stalled Pre-construction No announced timeline — ghosted on the map 2,700 MW
35 / 100
City
AWS Project Rainier (New Carlisle) US — Rest of US (composite) Operating Live 2,200 MW
87 / 100
City
Meta Hyperion (Richland Parish) US — Rest of US (composite) Construction Construction Live: announced 2028 (resolves ) 2,000 MW
80.3 / 100
City
AWS Susquehanna Nuclear Data Center Campus US — Rest of US (composite) Construction Construction Live: announced 2029 (resolves ) 1,920 MW
68.3 / 100
City
Vantage Data Centers Frontier (Shackelford County / Stargate) US — Texas (ERCOT) Construction Construction Live: announced H2 2026 (resolves ) 1,400 MW
69.5 / 100
City
Stargate Abilene (Crusoe campus) US — Texas (ERCOT) Construction Live 1,200 MW
75 / 100
City
Stargate Milam County (OpenAI / SB Energy) US — Texas (ERCOT) Construction Construction Live: announced Oct 2026 (resolves ) 1,200 MW
72 / 100
City
Meta Prometheus (New Albany) US — Rest of US (composite) Construction Construction Live: announced Q3 2026 (resolves ) 1,000 MW
53.8 / 100
City
Stargate Michigan - The Barn (Saline Township) US — Rest of US (composite) Construction Construction Live: announced H1 2028 (resolves ) 1,000 MW
69.5 / 100
City
Stargate New Mexico - Project Jupiter (Dona Ana County) US — Rest of US (composite) Construction Construction Live: announced 2026 (resolves ) 1,000 MW
69.5 / 100
City
Stargate UAE (Abu Dhabi) United Arab Emirates Announced Pre-construction Live: announced Q3 2026 (resolves ) 1,000 MW
58.5 / 100
Region
xAI Colossus 2 (Memphis) US — Rest of US (composite) Operating Live 1,000 MW
82 / 100
City
Stargate Wisconsin - Vantage Lighthouse (Port Washington) US — Rest of US (composite) Construction Construction Live: announced Q3 2027 (resolves ) 902 MW
82 / 100
City
Stargate Argentina (Patagonia) Argentina Announced Pre-construction Construction: announced 2026 (resolves ); Live: announced 2027 (resolves ) 500 MW
58.5 / 100
Jurisdiction centroid
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) United Arab Emirates Planned Pre-construction Live: announced 2026 (resolves ) 200 MW
71.5 / 100
Jurisdiction centroid
Khazna QAJ1 Ajman AI Data Center United Arab Emirates Construction Construction Live: announced Dec 2026 (resolves ) 100 MW
67.8 / 100
City
Meta El Paso Data Center US — Texas (ERCOT) Construction Construction Live: announced 2028 (resolves ) 100 MW
66 / 100
City
Khazna AUH8 Masdar City AI Data Center United Arab Emirates Construction Construction Live: announced Aug 2026 (resolves ) 30 MW
75.3 / 100
City
Cirion BUE1 Buenos Aires Expansion Argentina Operating Live 9 MW
62.5 / 100
Jurisdiction centroid
ARSAT Benavidez Data Center Hall IV Expansion Argentina Planned Pre-construction No announced timeline — ghosted on the map 1 MW
69 / 100
City
AWS Georgia Data Center Campuses (Butts & Douglas Counties) US — Georgia (Southern/Georgia Power) Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
76 / 100
City
AWS Louisa County Campuses (Lake Anna Tech Campus) US — Virginia (PJM/Dominion) Planned Construction Live: announced 2040 (resolves ) Undisclosed
78.5 / 100
City
du-Microsoft Hyperscale Data Center (Dubai) United Arab Emirates Planned Pre-construction No announced timeline — ghosted on the map Undisclosed
69 / 100
Jurisdiction centroid
Google Chesterfield Data Center Campus (Project Peanut) US — Virginia (PJM/Dominion) Planned Construction Construction: announced H1 2026 (resolves ) Undisclosed
71.5 / 100
City
Google Haskell County Data Centers US — Texas (ERCOT) Announced Live Live: announced Jun 2026 (resolves ) Undisclosed
72 / 100
City
Meta Stanton Springs / Newton Data Center US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
74 / 100
City
Microsoft Boydton Campus US — Virginia (PJM/Dominion) Operating Live Undisclosed
54 / 100
City
Microsoft Fairwater (Mount Pleasant) US — Rest of US (composite) Energized Live Undisclosed
81.3 / 100
City
Microsoft Fairwater Atlanta US — Georgia (Southern/Georgia Power) Operating Live Undisclosed
74 / 100
City
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Argentina Announced Pre-construction Live: announced 2030 (resolves ) Undisclosed
51 / 100
Jurisdiction centroid
Prince William Digital Gateway (QTS / Compass) US — Virginia (PJM/Dominion) Permitted Pre-construction No announced timeline — ghosted on the map Undisclosed
56.2 / 100
City
Telecom Argentina Edge AI Data Center Conversion Program Argentina Announced Pre-construction No announced timeline — ghosted on the map Undisclosed
48.4 / 100
Jurisdiction centroid

Markers are sized by disclosed capacity and colored by the latest project health score (0–100); the capacity heat layer (Heat / Markers / Both toggle) is weighted purely by stored MW — undisclosed capacity registers only a trace of presence, never an estimate. Undisclosed sites are plotted at their jurisdiction's centroid and labeled as such — a centroid is never presented as an exact site location. The phase filter and month scrubber move projects through phases per announced timelines — as announced by developers and press, not a Compute Institute forecast; a milestone dated only "2028" resolves to the end of its stated period. Projects with no announced timeline are ghosted at low opacity on the map — shown, never hidden silently, never interpolated.

Capacity pipeline by status

#pipeline

Construction-stage projects carry the most tracked capacity: 27,252 MW (68.4% of the 39,862 MW pipeline).

Interactive chart — the same data is in the table below.

Data table — Capacity pipeline by status
Status
Projects
Tracked MW
Announced 6 6,500 MW
Planned 6 201 MW
Permitted 1 0 MW
Construction 14 27,252 MW
Energized 1 0 MW
Operating 6 3,209 MW
Stalled 1 2,700 MW

Lifecycle order; MW sums cover projects with a stored capacity figure (12 without one). Statuses and capacities are provenance-backed project fields. Each stage links to the projects dashboard pre-filtered to that status.

Projected pipeline — per announced timelines

#projected

Per announced timelines, tracked operating capacity reaches 37.2 GW by 2032 — 6 projects carry no dated timeline and are shown separately, never interpolated.

This projection aggregates announced, cited timeline claims — as announced by developers and press, not a Compute Institute forecast. A milestone dated only "2028" resolves to the end of its stated period (December 2028); date precision is respected, never sharpened. 6 of 35 tracked projects carry no announced timeline and are bucketed visibly as such — never interpolated.

Interactive chart — the same data is in the table below.

Data table — Projected pipeline — per announced timelines

Snapshot — October 2028, per announced timelines

Phase at October 2028
Projects
Tracked MW
Projects in this phase
Operating 23 33,141 MW Fermi America Project Matador HyperGrid (Energization, announced H2 2026); SoftBank France AI Data Center Program (Hauts-de-France); Homer City Energy Campus (Commissioning, announced 2027); AWS Project Rainier (New Carlisle); Vantage Data Centers Frontier (Shackelford County / Stargate) (Commissioning, announced H2 2026); Stargate Abilene (Crusoe campus); Stargate Milam County (OpenAI / SB Energy) (Commissioning, announced Oct 2026); Meta Prometheus (New Albany) (Energization, announced Q3 2026); Stargate Michigan - The Barn (Saline Township) (Commissioning, announced H1 2028); Stargate New Mexico - Project Jupiter (Dona Ana County) (Commissioning, announced 2026); Stargate UAE (Abu Dhabi) (First 200 MW phase of Stargate UAE live, announced Q3 2026); xAI Colossus 2 (Memphis); Stargate Wisconsin - Vantage Lighthouse (Port Washington) (Commissioning, announced Q3 2027); Stargate Argentina (Patagonia) (Energization, announced 2027); Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) (Energization, announced 2026); Khazna QAJ1 Ajman AI Data Center (Commissioning, announced Dec 2026); Khazna AUH8 Masdar City AI Data Center (Commissioning, announced Aug 2026); Cirion BUE1 Buenos Aires Expansion; Google Haskell County Data Centers (Energization, announced Jun 2026); Meta Stanton Springs / Newton Data Center; Microsoft Boydton Campus; Microsoft Fairwater (Mount Pleasant); Microsoft Fairwater Atlanta
Construction 5 4,020 MW Meta Hyperion (Richland Parish); AWS Susquehanna Nuclear Data Center Campus; Meta El Paso Data Center; AWS Louisa County Campuses (Lake Anna Tech Campus); Google Chesterfield Data Center Campus (Project Peanut) (Groundbreaking, announced H1 2026)
Pre-construction 1 0 MW Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City)
No announced timeline 6 2,701 MW known Google Project Skyway (Pine Island, MN) (Stalled); ARSAT Benavidez Data Center Hall IV Expansion (Planned); AWS Georgia Data Center Campuses (Butts & Douglas Counties) (Planned); du-Microsoft Hyperscale Data Center (Dubai) (Planned); Prince William Digital Gateway (QTS / Compass) (Permitted); Telecom Argentina Edge AI Data Center Conversion Program (Announced)

Announced milestone dates — all tracked projects

Project
Milestone
Announced date
Precision
Resolves to
Evidence
Fermi America Project Matador HyperGrid Energization H2 2026 Half-year
E4
Groundbreaking 2027 Year
E2
Commissioning 2033 Year
E2
SoftBank France AI Data Center Program (Hauts-de-France) None announced — no dated milestone on record (Announced)
Homer City Energy Campus Commissioning 2027 Year
E4
Energization 2027 Year
E3
Google Project Skyway (Pine Island, MN) None announced — no dated milestone on record (Stalled)
AWS Project Rainier (New Carlisle) Groundbreaking 2026 Year
E4
Meta Hyperion (Richland Parish) Energization 2028 Year
E4
Commissioning 2030 Year
E4
AWS Susquehanna Nuclear Data Center Campus Energization 2029 Year
E3
Energization 2032 Year
E3
Vantage Data Centers Frontier (Shackelford County / Stargate) Commissioning H2 2026 Half-year
E3
Stargate Abilene (Crusoe campus) Phase 2 energization — full 1.2 GW campus (eight buildings) H1 2026 Half-year
E2
Commissioning H1 2026 Half-year
E4
Stargate Milam County (OpenAI / SB Energy) Commissioning Oct 2026 Month
E4
Energization 2026 Year
E4
Meta Prometheus (New Albany) Energization Q3 2026 Quarter
E4
E4
Stargate Michigan - The Barn (Saline Township) Commissioning H1 2028 Half-year
E4
Stargate New Mexico - Project Jupiter (Dona Ana County) Commissioning 2026 Year
E3
Stargate UAE (Abu Dhabi) First 200 MW phase of Stargate UAE live Q3 2026 Quarter
E4
E4
E2
xAI Colossus 2 (Memphis) Energization Apr 2026 Month
E4
Energization Q2 2027 Quarter
E4
Stargate Wisconsin - Vantage Lighthouse (Port Washington) Commissioning Q3 2027 Quarter
E4
Commissioning 2028 Year
E3
Stargate Argentina (Patagonia) Groundbreaking 2026 Year
E3
Energization 2027 Year
E3
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) Energization 2026 Year
E3
Khazna QAJ1 Ajman AI Data Center Commissioning Dec 2026 Month
E5
Meta El Paso Data Center Energization 2028 Year
E4
Khazna AUH8 Masdar City AI Data Center Commissioning Aug 2026 Month
E4
Cirion BUE1 Buenos Aires Expansion Commissioning Nov 2025 Month
E4
ARSAT Benavidez Data Center Hall IV Expansion None announced — no dated milestone on record (Planned)
AWS Georgia Data Center Campuses (Butts & Douglas Counties) None announced — no dated milestone on record (Planned)
AWS Louisa County Campuses (Lake Anna Tech Campus) Commissioning 2040 Year
E2
du-Microsoft Hyperscale Data Center (Dubai) None announced — no dated milestone on record (Planned)
Google Chesterfield Data Center Campus (Project Peanut) Groundbreaking H1 2026 Half-year
E4
Google Haskell County Data Centers Energization Jun 2026 Month
E4
Meta Stanton Springs / Newton Data Center Commissioning Dec 31, 2026 Exact day
E4
Commissioning 2028 Year
E4
Commissioning 2030 Year
E4
Commissioning 2032 Year
E4
Microsoft Boydton Campus None announced — no dated milestone on record (Operating)
Microsoft Fairwater (Mount Pleasant) Energization 2026 Year
E3
Energization H2 2027 Half-year
E4
Microsoft Fairwater Atlanta None announced — no dated milestone on record (Operating)
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Commissioning 2030 Year
E4
Prince William Digital Gateway (QTS / Compass) None announced — no dated milestone on record (Permitted)
Telecom Argentina Edge AI Data Center Conversion Program None announced — no dated milestone on record (Announced)

Phases derive from milestone-type transitions (groundbreaking → construction; energization/commissioning → operating) plus current statuses. 26 of 35 projects carry dated milestone claims (40 dated milestones; precision mix: 1 day, 6 month, 4 quarter, 7 half, 22 year). Already-due claims apply from the current month; nothing is interpolated or forecast.