Eight visual surfaces over Compute Institute's live ratings data — the Jurisdiction Index dimension heatmap, score history, and radar, tracked-capacity treemap and status pipeline, evidenced capital flows, the global project map, and the projected pipeline built from announced, cited timeline claims. Every chart is backed by the same data in plain HTML tables, with methodology and citations linked where scores appear.
Qatar leads 3 of 7 dimensions across the 34 rated jurisdictions.
Interactive chart — the same data is in the table below.
|
Jurisdiction
|
JCI
|
Power
|
Cost
|
Speed
|
Regulatory
|
Fiscal
|
Capital
|
Stability
|
|---|---|---|---|---|---|---|---|---|
| Qatar | 77.4 | 6.9 | 8.4 | — | 6.6 | 8 | 8.4 | 8.5 |
| US — Iowa (MISO) | 76.5 | 6.6 | 7.8 | 7.7 | 7.2 | 7.4 | 8.7 | 8.6 |
| US — Indiana (MISO) | 72.4 | 6.5 | 5.1 | 7 | 7.4 | 8 | 8.7 | 8.6 |
| US — Texas (ERCOT) | 72.3 | 6.4 | 7.1 | 7.8 | 7 | 7.2 | 7.4 | 8 |
| United Arab Emirates | 69.7 | 6.4 | 6.3 | 7.2 | 6.5 | 7.4 | 8 | 7.4 |
| US — Wisconsin (MISO) | 68.5 | 5.4 | 4.9 | 7.3 | 7.4 | 7.1 | 7.9 | 8.5 |
| US — Arizona (APS/SRP) | 67.2 | 5.1 | 6.8 | 6.9 | 6.4 | 7.7 | 7.3 | 7.7 |
| US — Georgia (Southern/Georgia Power) | 67.2 | 6 | 6.3 | 7 | 6.3 | 6.8 | 6.3 | 8.3 |
| Saudi Arabia | 65.2 | 5.8 | 7 | 6.8 | 5.7 | 6.5 | 7.4 | 6.9 |
| US — North Carolina (Duke Energy) | 63.4 | 4.7 | 6.4 | — | 6.7 | 7 | — | 7.8 |
| US — Rest of US (composite) | 63.4 | 5.1 | 5.9 | 6.3 | 6.1 | 6.4 | 6.9 | 8.1 |
| Sweden | 63.1 | 6.5 | 7.3 | 4 | 6 | 4.5 | 7 | 8.8 |
| Canada | 62.3 | 5.2 | 6.9 | 5.9 | 6.1 | 5.4 | 5.9 | 8.5 |
| France | 62.3 | 6.5 | 5.9 | 5.6 | 5.9 | 5.5 | 6.3 | 7.6 |
| Australia | 61.9 | 5.9 | 4.9 | 4.8 | 6.9 | 4.7 | 7.6 | 8.6 |
| US — Virginia (PJM/Dominion) | 61.6 | 3.9 | 5 | 6.8 | 5.8 | 6.6 | 7.7 | 8.3 |
| US — Ohio (AEP Ohio / PJM) | 61.2 | 4.3 | 4.5 | 6.5 | 6.5 | 6.1 | 8 | 7.7 |
| US — Pennsylvania (PJM) | 60.4 | 3.8 | 4.3 | — | 6.7 | 7.2 | 7 | 8.4 |
| Denmark | 60.2 | 4.2 | 4.8 | 5.9 | 7.1 | 5.1 | 6.5 | 8.9 |
| US — Minnesota (Xcel / MISO) | 59.3 | 5.5 | 6.6 | 6 | 6.4 | 5 | 3.3 | 8.4 |
| Singapore | 59 | 2.8 | 4.3 | 6.9 | 6 | 6.7 | 6.7 | 9 |
| Malaysia — Johor (Johor-Singapore SEZ) | 58.9 | 6.8 | 4.2 | — | 6.2 | 6.2 | — | 5.5 |
| Japan | 58.6 | 4.7 | 1.6 | 6 | 8 | 5.7 | 7.8 | 7.6 |
| United Kingdom | 57 | 4.5 | 3.3 | 5.5 | 7.1 | 5 | 6.4 | 8.2 |
| Germany | 56.7 | 4.6 | 3.2 | 6 | 6.2 | 3.7 | 7.4 | 8.3 |
| India | 54.9 | 4.9 | 5.1 | 5.7 | 5.2 | 5.9 | 6.1 | 6 |
| Ireland | 54.1 | 3 | 1.7 | — | 5.4 | 6.4 | 8.5 | 8.5 |
| Indonesia | 53.6 | 3.9 | 6.4 | 5 | 5.5 | 6.1 | 7 | 4.9 |
| South Africa | 52.3 | 3.9 | 4.4 | 6.5 | 5.4 | 4.9 | 6.4 | 5.4 |
| Brazil | 50.9 | 6.3 | 2.7 | 5 | 5.6 | 4.5 | 6.4 | 4.5 |
| Argentina | 50.7 | 4.5 | 6 | 5.5 | 5 | 7 | 5.4 | 3 |
| Poland | 50.7 | 4.2 | 3.2 | 4.5 | 6.2 | 6.5 | — | 6.6 |
| Netherlands | 50.3 | 2.8 | 3.2 | 3.7 | 5.2 | 4.7 | 8.5 | 8.3 |
| South Korea | 49 | 3.6 | 2.2 | 5 | 5.8 | 5 | 7.9 | 5.6 |
Dimension scores 0–10, composite JCI 0–100; "—" = not yet evidenced at E1–E2. Methodology v0 — every score traces to cited sources on the jurisdiction page.
Score history begins June 14, 2026 — 34 jurisdictions scored across 10 scoring runs so far; trend lines deepen as new runs publish.
Interactive chart — the same data is in the table below.
One row per published scoring run (jurisdiction_scores is append-only — history is recorded, never back-filled). The line chart deepens as runs accumulate.
Across the 34 rated jurisdictions, the single strongest dimension score is Singapore in Stability & Execution Risk (9 of 10); the computed median profile is drawn for comparison.
Interactive chart — the same data is in the table below.
|
Jurisdiction
|
JCI
|
Power
|
Cost
|
Speed
|
Regulatory
|
Fiscal
|
Capital
|
Stability
|
|---|---|---|---|---|---|---|---|---|
| Qatar | 77.4 | 6.9 | 8.4 | — | 6.6 | 8 | 8.4 | 8.5 |
| US — Iowa (MISO) | 76.5 | 6.6 | 7.8 | 7.7 | 7.2 | 7.4 | 8.7 | 8.6 |
| US — Indiana (MISO) | 72.4 | 6.5 | 5.1 | 7 | 7.4 | 8 | 8.7 | 8.6 |
| US — Texas (ERCOT) | 72.3 | 6.4 | 7.1 | 7.8 | 7 | 7.2 | 7.4 | 8 |
| United Arab Emirates | 69.7 | 6.4 | 6.3 | 7.2 | 6.5 | 7.4 | 8 | 7.4 |
| US — Wisconsin (MISO) | 68.5 | 5.4 | 4.9 | 7.3 | 7.4 | 7.1 | 7.9 | 8.5 |
| US — Arizona (APS/SRP) | 67.2 | 5.1 | 6.8 | 6.9 | 6.4 | 7.7 | 7.3 | 7.7 |
| US — Georgia (Southern/Georgia Power) | 67.2 | 6 | 6.3 | 7 | 6.3 | 6.8 | 6.3 | 8.3 |
| Saudi Arabia | 65.2 | 5.8 | 7 | 6.8 | 5.7 | 6.5 | 7.4 | 6.9 |
| US — North Carolina (Duke Energy) | 63.4 | 4.7 | 6.4 | — | 6.7 | 7 | — | 7.8 |
| US — Rest of US (composite) | 63.4 | 5.1 | 5.9 | 6.3 | 6.1 | 6.4 | 6.9 | 8.1 |
| Sweden | 63.1 | 6.5 | 7.3 | 4 | 6 | 4.5 | 7 | 8.8 |
| Canada | 62.3 | 5.2 | 6.9 | 5.9 | 6.1 | 5.4 | 5.9 | 8.5 |
| France | 62.3 | 6.5 | 5.9 | 5.6 | 5.9 | 5.5 | 6.3 | 7.6 |
| Australia | 61.9 | 5.9 | 4.9 | 4.8 | 6.9 | 4.7 | 7.6 | 8.6 |
| US — Virginia (PJM/Dominion) | 61.6 | 3.9 | 5 | 6.8 | 5.8 | 6.6 | 7.7 | 8.3 |
| US — Ohio (AEP Ohio / PJM) | 61.2 | 4.3 | 4.5 | 6.5 | 6.5 | 6.1 | 8 | 7.7 |
| US — Pennsylvania (PJM) | 60.4 | 3.8 | 4.3 | — | 6.7 | 7.2 | 7 | 8.4 |
| Denmark | 60.2 | 4.2 | 4.8 | 5.9 | 7.1 | 5.1 | 6.5 | 8.9 |
| US — Minnesota (Xcel / MISO) | 59.3 | 5.5 | 6.6 | 6 | 6.4 | 5 | 3.3 | 8.4 |
| Singapore | 59 | 2.8 | 4.3 | 6.9 | 6 | 6.7 | 6.7 | 9 |
| Malaysia — Johor (Johor-Singapore SEZ) | 58.9 | 6.8 | 4.2 | — | 6.2 | 6.2 | — | 5.5 |
| Japan | 58.6 | 4.7 | 1.6 | 6 | 8 | 5.7 | 7.8 | 7.6 |
| United Kingdom | 57 | 4.5 | 3.3 | 5.5 | 7.1 | 5 | 6.4 | 8.2 |
| Germany | 56.7 | 4.6 | 3.2 | 6 | 6.2 | 3.7 | 7.4 | 8.3 |
| India | 54.9 | 4.9 | 5.1 | 5.7 | 5.2 | 5.9 | 6.1 | 6 |
| Ireland | 54.1 | 3 | 1.7 | — | 5.4 | 6.4 | 8.5 | 8.5 |
| Indonesia | 53.6 | 3.9 | 6.4 | 5 | 5.5 | 6.1 | 7 | 4.9 |
| South Africa | 52.3 | 3.9 | 4.4 | 6.5 | 5.4 | 4.9 | 6.4 | 5.4 |
| Brazil | 50.9 | 6.3 | 2.7 | 5 | 5.6 | 4.5 | 6.4 | 4.5 |
| Argentina | 50.7 | 4.5 | 6 | 5.5 | 5 | 7 | 5.4 | 3 |
| Poland | 50.7 | 4.2 | 3.2 | 4.5 | 6.2 | 6.5 | — | 6.6 |
| Netherlands | 50.3 | 2.8 | 3.2 | 3.7 | 5.2 | 4.7 | 8.5 | 8.3 |
| South Korea | 49 | 3.6 | 2.2 | 5 | 5.8 | 5 | 7.9 | 5.6 |
| Median profile (computed) | 60.8 | 5 | 5 | 6 | 6.2 | 6.3 | 7.3 | 8.1 |
Dimension scores 0–10 per methodology v0; full sub-factor provenance on each jurisdiction page. The chart's chips overlay up to four jurisdictions; the median profile is computed per dimension across rated jurisdictions.
US — Rest of US (composite) hosts the largest tracked capacity: 50,742 MW across 18 projects (44.1% of 115,101 tracked MW).
Interactive chart — the same data is in the table below.
|
Jurisdiction
|
Projects with MW
|
MW undisclosed
|
Tracked MW
|
Share
|
|---|---|---|---|---|
| US — Rest of US (composite) | 18 | 1 | 50,742 MW | 44.1% |
| US — Texas (ERCOT) | 21 | 8 | 38,444 MW | 33.4% |
| US — Pennsylvania (PJM) | 7 | 4 | 10,920 MW | 9.5% |
| France | 1 | — | 5,000 MW | 4.3% |
| US — Minnesota (Xcel / MISO) | 1 | — | 2,700 MW | 2.3% |
| US — Indiana (MISO) | 3 | 4 | 1,472 MW | 1.3% |
| United Arab Emirates | 4 | 1 | 1,330 MW | 1.2% |
| US — Arizona (APS/SRP) | 4 | 2 | 1,184 MW | 1% |
| US — Ohio (AEP Ohio / PJM) | 2 | 6 | 992 MW | 0.9% |
| US — Virginia (PJM/Dominion) | 6 | 15 | 907 MW | 0.8% |
| US — Georgia (Southern/Georgia Power) | 5 | 12 | 704 MW | 0.6% |
| Argentina | 3 | 2 | 510 MW | 0.4% |
| Australia | 1 | 4 | 80 MW | 0.1% |
| US — North Carolina (Duke Energy) | 1 | 3 | 60 MW | 0.1% |
| South Korea | 1 | 2 | 36 MW | 0% |
| Singapore | 1 | — | 20 MW | 0% |
| Japan | 0 | 1 | 0 MW | 0% |
| United Kingdom | 0 | 3 | 0 MW | 0% |
| Malaysia — Johor (Johor-Singapore SEZ) | 0 | 2 | 0 MW | 0% |
| US — Iowa (MISO) | 0 | 3 | 0 MW | 0% |
| Germany | 0 | 1 | 0 MW | 0% |
| Netherlands | 0 | 2 | 0 MW | 0% |
| US — Wisconsin (MISO) | 0 | 1 | 0 MW | 0% |
Only projects with a stored MW figure enter the sums (77 active projects without a disclosed capacity excluded, never estimated). In the chart, undisclosed projects appear as a hatched leaf per jurisdiction, drawn at the median disclosed project size for visibility only.
211.3B USD of evidenced capital commitments span 24 entity–project links; the largest single commitment is 40.0B USD by Google into Google Haskell County Data Centers.
Interactive chart — the same data is in the table below.
Committed capital is shown only where a USD figure is on the evidence record (project–entity roles) — 437 roles without a disclosed figure are excluded, never estimated.
156 tracked projects across 23 jurisdictions, totaling 115,101 MW of announced or in-development capacity.
Interactive chart — the same data is in the table below.
|
Project
|
Jurisdiction
|
Status
|
Phase at August 2026
|
Announced transitions
|
Capacity
|
Health score
|
Location
|
|---|---|---|---|---|---|---|---|
| Fermi America Project Matador HyperGrid | US — Texas (ERCOT) | Construction | Construction | Live: announced H2 2026 (resolves ) | 11,000 MW | City | |
| SB Energy AI Campus (Pike County, Ohio) | US — Rest of US (composite) | Construction | Construction | No announced timeline — ghosted on the map | 10,000 MW | Jurisdiction centroid | |
| Stratos Project | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 9,000 MW | Jurisdiction centroid | |
| Comanche Circle | US — Rest of US (composite) | Permitted | Pre-construction | No announced timeline — ghosted on the map | 5,000 MW | Jurisdiction centroid | |
| GW Ranch (Pacifico Energy) | US — Texas (ERCOT) | Permitted | Construction | Construction: announced Q1 2026 (resolves ); Live: announced Q1 2027 (resolves ) | 5,000 MW | Jurisdiction centroid | |
| SoftBank France AI Data Center Program (Hauts-de-France) | France | Announced | Live | — | 5,000 MW | City | |
| Homer City Energy Campus | US — Rest of US (composite) | Construction | Construction | Live: announced 2027 (resolves ) | 4,400 MW | City | |
| Shippingport / Bruce Mansfield Data Center (Project Phoenix) | US — Pennsylvania (PJM) | Permitted | Pre-construction | No announced timeline — ghosted on the map | 3,600 MW | Jurisdiction centroid | |
| MSB Global Services Matrix Data Center Campus | US — Texas (ERCOT) | Construction | Live | Live: announced Mar 2026 (resolves ) | 3,000 MW | Jurisdiction centroid | |
| TECfusions Keystone Connect (Upper Burrell) | US — Pennsylvania (PJM) | Planned | Pre-construction | No announced timeline — ghosted on the map | 3,000 MW | Jurisdiction centroid | |
| Google Project Skyway (Pine Island, MN) | US — Minnesota (Xcel / MISO) | Stalled | Pre-construction | No announced timeline — ghosted on the map | 2,700 MW | City | |
| AWS Project Rainier (New Carlisle) | US — Rest of US (composite) | Operating | Live | — | 2,200 MW | City | |
| Eneus Energy Cameron County data center | US — Texas (ERCOT) | Announced | Pre-construction | No announced timeline — ghosted on the map | 2,000 MW | Jurisdiction centroid | |
| Meta Hyperion (Richland Parish) | US — Rest of US (composite) | Construction | Construction | Live: announced 2028 (resolves ) | 2,000 MW | City | |
| Microsoft Pecos data center campus | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 2,000 MW | Jurisdiction centroid | |
| Poolside Project Horizon | US — Texas (ERCOT) | Stalled | Live | Live: announced Dec 2025 (resolves ) | 2,000 MW | Jurisdiction centroid | |
| Sweetwater 1 and 2 (IREN) | US — Texas (ERCOT) | Energized | Live | — | 2,000 MW | Jurisdiction centroid | |
| Tract Caldwell County Technology Park | US — Texas (ERCOT) | Announced | Pre-construction | Live: announced 2028 (resolves ) | 2,000 MW | Jurisdiction centroid | |
| Wheatfield data center and gas plant | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 2,000 MW | Jurisdiction centroid | |
| AWS Susquehanna Nuclear Data Center Campus | US — Rest of US (composite) | Construction | Construction | Live: announced 2029 (resolves ) | 1,920 MW | City | |
| Talen Energy - AWS Susquehanna PPA | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 1,920 MW | Jurisdiction centroid | |
| AREP PowerHouse Grand Prairie | US — Texas (ERCOT) | Planned | Live | Construction: announced Q1 2025 (resolves ); Live: announced May 2026 (resolves ) | 1,800 MW | Jurisdiction centroid | |
| Crusoe Callaway County Missouri data center | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 1,800 MW | Jurisdiction centroid | |
| Joliet data center campus | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 1,800 MW | Jurisdiction centroid | |
| Yorkville data center campus | US — Rest of US (composite) | Announced | Pre-construction | No announced timeline — ghosted on the map | 1,800 MW | Jurisdiction centroid | |
| Crusoe / Blue Energy Data Center (Victoria, TX) | US — Texas (ERCOT) | Announced | Pre-construction | Live: announced 2028 (resolves ) | 1,500 MW | Jurisdiction centroid | |
| Vantage Data Centers Frontier (Shackelford County / Stargate) | US — Texas (ERCOT) | Construction | Construction | Live: announced H2 2026 (resolves ) | 1,400 MW | City | |
| Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus | US — Pennsylvania (PJM) | Announced | Pre-construction | No announced timeline — ghosted on the map | 1,350 MW | Jurisdiction centroid | |
| CloudBurst Data Center (New Braunfels) | US — Texas (ERCOT) | Construction | Construction | Live: announced 2026 (resolves ) | 1,200 MW | Jurisdiction centroid | |
| Stargate Abilene (Crusoe campus) | US — Texas (ERCOT) | Operating | Live | — | 1,200 MW | City | |
| Stargate Milam County (OpenAI / SB Energy) | US — Texas (ERCOT) | Construction | Construction | Live: announced Oct 2026 (resolves ) | 1,200 MW | City | |
| Crane Clean Energy Center | US — Pennsylvania (PJM) | Announced | Live | Live: announced 1970 (resolves ) | 1,000 MW | City | |
| Meta Lebanon Data Center Campus (LEAP District) | US — Indiana (MISO) | Construction | Construction | No announced timeline — ghosted on the map | 1,000 MW | Jurisdiction centroid | |
| Meta Prometheus (New Albany) | US — Rest of US (composite) | Construction | Construction | Live: announced Q3 2026 (resolves ) | 1,000 MW | City | |
| Stargate Michigan - The Barn (Saline Township) | US — Rest of US (composite) | Construction | Construction | Live: announced H1 2028 (resolves ) | 1,000 MW | City | |
| Stargate New Mexico - Project Jupiter (Dona Ana County) | US — Rest of US (composite) | Construction | Construction | Live: announced 2026 (resolves ) | 1,000 MW | City | |
| Stargate UAE (Abu Dhabi) | United Arab Emirates | Announced | Pre-construction | Live: announced Q3 2026 (resolves ) | 1,000 MW | Region | |
| xAI Colossus 2 (Memphis) | US — Rest of US (composite) | Operating | Live | — | 1,000 MW | City | |
| Amazon / AWS Salem Township Data Center Campus (Susquehanna) | US — Pennsylvania (PJM) | Construction | Construction | No announced timeline — ghosted on the map | 960 MW | Jurisdiction centroid | |
| Robena Mine Data Center (Project Hummingbird) | US — Pennsylvania (PJM) | Planned | Live | Live: announced 1970 (resolves ) | 910 MW | Jurisdiction centroid | |
| Stargate Wisconsin - Vantage Lighthouse (Port Washington) | US — Rest of US (composite) | Construction | Construction | Live: announced Q3 2027 (resolves ) | 902 MW | City | |
| Cologix Johnstown AI-Ready Campus | US — Ohio (AEP Ohio / PJM) | Announced | Construction | Construction: announced 2025 (resolves ) | 800 MW | Jurisdiction centroid | |
| Nexus Data Center (Hubbard) | US — Texas (ERCOT) | Announced | Pre-construction | Live: announced 2026 (resolves ) | 612 MW | Jurisdiction centroid | |
| Project Aggie (College Station) | US — Texas (ERCOT) | Cancelled | Pre-construction | No announced timeline — ghosted on the map | 600 MW | Jurisdiction centroid | |
| Aligned Project Caprock (Hale County) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | 540 MW | Jurisdiction centroid | |
| Stargate Argentina (Patagonia) | Argentina | Announced | Pre-construction | Construction: announced 2026 (resolves ); Live: announced 2027 (resolves ) | 500 MW | Jurisdiction centroid | |
| EdgeCore Mesa (Greater Phoenix) | US — Arizona (APS/SRP) | Construction | Live | — | 496 MW | Jurisdiction centroid | |
| DataBank Red Oak Campus (South Dallas) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | 480 MW | Jurisdiction centroid | |
| Stack Infrastructure NVA02 (Manassas) | US — Virginia (PJM/Dominion) | Operating | Live | — | 420 MW | Jurisdiction centroid | |
| Vantage Pittsboro Campus | US — Indiana (MISO) | Permitted | Pre-construction | No announced timeline — ghosted on the map | 400 MW | Jurisdiction centroid | |
| Project Comal | US — Texas (ERCOT) | Permitted | Pre-construction | No announced timeline — ghosted on the map | 360 MW | Jurisdiction centroid | |
| Novva Data Centers Mesa | US — Arizona (APS/SRP) | Planned | Pre-construction | Live: announced Q4 2026 (resolves ) | 300 MW | Jurisdiction centroid | |
| Rowan Cinco Data Center Campus (Medina County) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | 300 MW | Jurisdiction centroid | |
| Compass Datacenters Goodyear | US — Arizona (APS/SRP) | Construction | Construction | No announced timeline — ghosted on the map | 212 MW | Jurisdiction centroid | |
| Vantage Data Centers Ashburn I (VA1) | US — Virginia (PJM/Dominion) | Operating | Live | — | 206 MW | Jurisdiction centroid | |
| Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | United Arab Emirates | Planned | Pre-construction | Live: announced 2026 (resolves ) | 200 MW | Jurisdiction centroid | |
| T5 @ Atlanta IV (Palmetto) | US — Georgia (Southern/Georgia Power) | Planned | Pre-construction | Live: announced 2027 (resolves ) | 200 MW | Jurisdiction centroid | |
| DataBank Culpeper Campus (IAD5/IAD6) | US — Virginia (PJM/Dominion) | Planned | Pre-construction | No announced timeline — ghosted on the map | 192 MW | Jurisdiction centroid | |
| Vantage Data Centers OH1 (New Albany) | US — Ohio (AEP Ohio / PJM) | Construction | Live | Live: announced 2025 (resolves ) | 192 MW | Jurisdiction centroid | |
| Vantage Data Centers AZ1 (Goodyear) | US — Arizona (APS/SRP) | Construction | Construction | No announced timeline — ghosted on the map | 176 MW | Jurisdiction centroid | |
| Edged Atlanta ATL01 Campus (Tilford Yard) | US — Georgia (Southern/Georgia Power) | Operating | Live | — | 168 MW | Jurisdiction centroid | |
| Meta Temple Data Center | US — Texas (ERCOT) | Commissioned | Live | — | 152 MW | Jurisdiction centroid | |
| DataBank Lithia Springs Campus (ATL5/ATL6) | US — Georgia (Southern/Georgia Power) | Construction | Construction | No announced timeline — ghosted on the map | 120 MW | Jurisdiction centroid | |
| DC BLOX Atlanta West | US — Georgia (Southern/Georgia Power) | Construction | Construction | Live: announced 2027 (resolves ) | 120 MW | Jurisdiction centroid | |
| CoreWeave Lancaster AI Data Center Campus | US — Pennsylvania (PJM) | Planned | Pre-construction | No announced timeline — ghosted on the map | 100 MW | Jurisdiction centroid | |
| Khazna QAJ1 Ajman AI Data Center | United Arab Emirates | Construction | Construction | Live: announced Dec 2026 (resolves ) | 100 MW | City | |
| Meta El Paso Data Center | US — Texas (ERCOT) | Construction | Construction | Live: announced 2028 (resolves ) | 100 MW | City | |
| Microsoft Project Rita (Tyrone) | US — Georgia (Southern/Georgia Power) | Permitted | Pre-construction | No announced timeline — ghosted on the map | 96 MW | Jurisdiction centroid | |
| NEXTDC S3 (Sydney) | Australia | Operating | Live | — | 80 MW | Jurisdiction centroid | |
| Metrobloks IND-A1 (Indianapolis) | US — Indiana (MISO) | Permitted | Pre-construction | No announced timeline — ghosted on the map | 72 MW | Jurisdiction centroid | |
| T5 @ Charlotte II (Kings Mountain) | US — North Carolina (Duke Energy) | Planned | Pre-construction | Live: announced 2026 (resolves ) | 60 MW | Jurisdiction centroid | |
| QTS Ashburn 1 (ASH1) | US — Virginia (PJM/Dominion) | Operating | Live | — | 55 MW | Jurisdiction centroid | |
| Digital Edge SEL2 (Incheon) | South Korea | Operating | Live | — | 36 MW | Jurisdiction centroid | |
| Khazna AUH8 Masdar City AI Data Center | United Arab Emirates | Construction | Live | Live: announced Aug 2026 (resolves ) | 30 MW | City | |
| NTT VA6 (Ashburn) | US — Virginia (PJM/Dominion) | Operating | Live | — | 24 MW | Jurisdiction centroid | |
| Equinix SG6 (Singapore) | Singapore | Construction | Construction | No announced timeline — ghosted on the map | 20 MW | Jurisdiction centroid | |
| DC BLOX Henrico (Wilkinson Road) | US — Virginia (PJM/Dominion) | Construction | Construction | No announced timeline — ghosted on the map | 10 MW | City | |
| Cirion BUE1 Buenos Aires Expansion | Argentina | Operating | Live | — | 9 MW | Jurisdiction centroid | |
| ARSAT Benavidez Data Center Hall IV Expansion | Argentina | Planned | Pre-construction | No announced timeline — ghosted on the map | 1 MW | City | |
| AirTrunk Osaka Campus (OSK1 + OSK2) | Japan | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| AirTrunk SYD3 (Western Sydney) | Australia | Permitting | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Aligned IAD-02 (Ashburn) | US — Virginia (PJM/Dominion) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Amazon / AWS Falls Township Data Center (Keystone Trade Center) | US — Pennsylvania (PJM) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Amazon Devlin Technology Park (Bristow) | US — Virginia (PJM/Dominion) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Apple Maiden Data Center | US — North Carolina (Duke Energy) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| AWS Desper Creek Technology Campus (Louisa County) | US — Virginia (PJM/Dominion) | Permitting | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| AWS Georgia Data Center Campuses (Butts & Douglas Counties) | US — Georgia (Southern/Georgia Power) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | City | |
| AWS Hilliard Third Campus (Scioto Darby Road) | US — Ohio (AEP Ohio / PJM) | Permitted | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| AWS Louisa County Campuses (Lake Anna Tech Campus) | US — Virginia (PJM/Dominion) | Construction | Construction | Live: announced 2040 (resolves ) | Undisclosed | City | |
| AWS New Albany Data Center Campus | US — Ohio (AEP Ohio / PJM) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Blackstone QTS Cambois Campus (Blyth) | United Kingdom | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Bridge Data Centres MY07 (Ulu Tiram) | Malaysia — Johor (Johor-Singapore SEZ) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract | Australia | Permitted | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Crusoe / Lancium Abilene AI Campus (Stargate) | US — Texas (ERCOT) | Construction | Live | — | Undisclosed | Jurisdiction centroid | |
| CyrusOne New Albany COL-1 | US — Ohio (AEP Ohio / PJM) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| CyrusOne Project Peach (Coweta County) | US — Georgia (Southern/Georgia Power) | Permitted | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| CyrusOne Whitney Campus (DFW10 series, Bosque County) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| DC BLOX Atlanta East (Rockdale County) | US — Georgia (Southern/Georgia Power) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| du-Microsoft Hyperscale Data Center (Dubai) | United Arab Emirates | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| EdgeConneX New Albany Campus | US — Ohio (AEP Ohio / PJM) | Construction | Live | Live: announced Apr 2026 (resolves ) | Undisclosed | Jurisdiction centroid | |
| EdgeCore Culpeper Campus | US — Virginia (PJM/Dominion) | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Empyrion KR1 Gangnam (Seoul) | South Korea | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Energy Capital Partners / Calpine York 2 Data Center | US — Pennsylvania (PJM) | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google / Intersect Meitner Energy Center (Texas Panhandle) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google Chesterfield Data Center Campus (Project Peanut) | US — Virginia (PJM/Dominion) | Permitting | Construction | Construction: announced H1 2026 (resolves ) | Undisclosed | City | |
| Google Council Bluffs Data Center | US — Iowa (MISO) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Google Douglas County Data Center | US — Georgia (Southern/Georgia Power) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Google Fort Wayne Data Center | US — Indiana (MISO) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google Goodnight Campus (Armstrong County, TX) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | City | |
| Google Hanau Data Center | Germany | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Google Haskell County Data Centers | US — Texas (ERCOT) | Construction | Live | Live: announced Jun 2026 (resolves ) | Undisclosed | City | |
| Google Lenoir Data Center | US — North Carolina (Duke Energy) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Google Mesa Data Center | US — Arizona (APS/SRP) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google Midlothian Campus - Building 5 (Sharka) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google New Albany Campus (Montauk Innovations) | US — Ohio (AEP Ohio / PJM) | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google Project Pegasus (LaGrange) | US — Georgia (Southern/Georgia Power) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Google Tussenweg / Green Box Computing (Hollands Kroon) | Netherlands | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | City | |
| Google Waltham Cross Data Centre | United Kingdom | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | US — Virginia (PJM/Dominion) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Iron Mountain VA-1 (Manassas) | US — Virginia (PJM/Dominion) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Meta (Facebook) Forest City Data Center | US — North Carolina (Duke Energy) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Meta Altoona Data Center | US — Iowa (MISO) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Meta Henrico Data Center (White Oak Technology Park) | US — Virginia (PJM/Dominion) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Meta Jeffersonville Data Center | US — Indiana (MISO) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Meta Mesa Data Center | US — Arizona (APS/SRP) | Announced | Live | — | Undisclosed | Jurisdiction centroid | |
| Meta Stanton Springs / Newton Data Center | US — Georgia (Southern/Georgia Power) | Operating | Live | — | Undisclosed | City | |
| Microsoft Boydton Campus | US — Virginia (PJM/Dominion) | Operating | Live | — | Undisclosed | City | |
| Microsoft Fairwater (Mount Pleasant) | US — Rest of US (composite) | Energized | Live | — | Undisclosed | City | |
| Microsoft Fairwater Atlanta | US — Georgia (Southern/Georgia Power) | Operating | Live | — | Undisclosed | City | |
| Microsoft Granger Data Center (St. Joe Farms) | US — Indiana (MISO) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) | Netherlands | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | City | |
| Microsoft Mount Pleasant Data Center Campus | US — Wisconsin (MISO) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Microsoft New Albany Data Centers | US — Ohio (AEP Ohio / PJM) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Microsoft Palmetto Data Center | US — Georgia (Southern/Georgia Power) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Microsoft Southeast Asia 3 Region (Johor Bahru) | Malaysia — Johor (Johor-Singapore SEZ) | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Microsoft West Des Moines Data Centers | US — Iowa (MISO) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| NEXTDC M3 (West Footscray, Melbourne) | Australia | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) | Australia | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) | United Kingdom | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| NTT Grove at Gainesville Campus (VA10-VA13) | US — Virginia (PJM/Dominion) | Construction | Live | — | Undisclosed | Jurisdiction centroid | |
| Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) | Argentina | Announced | Pre-construction | Live: announced 2030 (resolves ) | Undisclosed | Jurisdiction centroid | |
| PowerHouse 95 (Spotsylvania) | US — Virginia (PJM/Dominion) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Prince William Digital Gateway (QTS / Compass) | US — Virginia (PJM/Dominion) | Cancelled | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | City | |
| Project Gravity (Archbald / Gouldsboro Data Center Campus) | US — Pennsylvania (PJM) | Stalled | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Prologis Project Sail (Coweta County) | US — Georgia (Southern/Georgia Power) | Permitted | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Prologis Shelbyville Data Center Campus | US — Indiana (MISO) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| QTS Atlanta Metro DC1 | US — Georgia (Southern/Georgia Power) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| QTS Fayetteville Campus (Project Excalibur) | US — Georgia (Southern/Georgia Power) | Construction | Live | — | Undisclosed | Jurisdiction centroid | |
| QTS Salem Township Campus | US — Pennsylvania (PJM) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| QTS White Oak Expansion (RIC4/RIC5, Henrico) | US — Virginia (PJM/Dominion) | Permitted | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Rowan Project Temple (Bell County) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| SK Group + AWS Ulsan AI Data Center | South Korea | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Skybox / Prologis PowerCampus Austin (Hutto) | US — Texas (ERCOT) | Construction | Construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Stack Infrastructure Berry Hill Megasite (Pittsylvania) | US — Virginia (PJM/Dominion) | Planned | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid | |
| Switch The Keep Campus (Douglas County) | US — Georgia (Southern/Georgia Power) | Operating | Live | — | Undisclosed | Jurisdiction centroid | |
| Telecom Argentina Edge AI Data Center Conversion Program | Argentina | Announced | Pre-construction | No announced timeline — ghosted on the map | Undisclosed | Jurisdiction centroid |
Markers are sized by disclosed capacity and colored by the latest project health score (0–100); the capacity heat layer (Heat / Markers / Both toggle) is weighted purely by stored MW — undisclosed capacity registers only a trace of presence, never an estimate. Undisclosed sites are plotted at their jurisdiction's centroid and labeled as such — a centroid is never presented as an exact site location. The phase filter and month scrubber move projects through phases per announced timelines — as announced by developers and press, not a Compute Institute forecast; a milestone dated only "2028" resolves to the end of its stated period. Projects with no announced timeline are ghosted at low opacity on the map — shown, never hidden silently, never interpolated.
Construction-stage projects carry the most tracked capacity: 44,878 MW (39.0% of the 115,101 MW pipeline).
Interactive chart — the same data is in the table below.
|
Status
|
Projects
|
Tracked MW
|
|---|---|---|
| Announced | 28 | 36,082 MW |
| Planned | 18 | 6,763 MW |
| Permitting | 3 | 0 MW |
| Permitted | 12 | 14,528 MW |
| Construction | 58 | 44,878 MW |
| Energized | 2 | 2,000 MW |
| Commissioned | 1 | 152 MW |
| Operating | 29 | 5,398 MW |
| Stalled | 3 | 4,700 MW |
| Cancelled | 2 | 600 MW |
Lifecycle order; MW sums cover projects with a stored capacity figure (77 without one). Statuses and capacities are provenance-backed project fields. Each stage links to the projects dashboard pre-filtered to that status.
Per announced timelines, tracked operating capacity reaches 60.7 GW by 2032 — 81 projects carry no dated timeline and are shown separately, never interpolated.
Interactive chart — the same data is in the table below.
|
Project
|
Milestone
|
Announced date
|
Precision
|
Resolves to
|
Evidence
|
|---|---|---|---|---|---|
| Fermi America Project Matador HyperGrid | Energization | H2 2026 | Half-year | ||
| Groundbreaking | 2027 | Year | |||
| Commissioning | 2033 | Year | |||
| SB Energy AI Campus (Pike County, Ohio) | None announced — no dated milestone on record (Construction) | ||||
| Stratos Project | None announced — no dated milestone on record (Announced) | ||||
| Comanche Circle | None announced — no dated milestone on record (Permitted) | ||||
| GW Ranch (Pacifico Energy) | Groundbreaking | Q1 2026 | Quarter | ||
| Energization | Q1 2027 | Quarter | |||
| SoftBank France AI Data Center Program (Hauts-de-France) | None announced — no dated milestone on record (Announced) | ||||
| Homer City Energy Campus | Commissioning | 2027 | Year | ||
| Energization | 2027 | Year | |||
| Shippingport / Bruce Mansfield Data Center (Project Phoenix) | None announced — no dated milestone on record (Permitted) | ||||
| MSB Global Services Matrix Data Center Campus | Commissioning | Mar 2026 | Month | ||
| TECfusions Keystone Connect (Upper Burrell) | None announced — no dated milestone on record (Planned) | ||||
| Google Project Skyway (Pine Island, MN) | None announced — no dated milestone on record (Stalled) | ||||
| AWS Project Rainier (New Carlisle) | Groundbreaking | 2026 | Year | ||
| Eneus Energy Cameron County data center | None announced — no dated milestone on record (Announced) | ||||
| Meta Hyperion (Richland Parish) | Energization | 2028 | Year | ||
| Commissioning | 2030 | Year | |||
| Microsoft Pecos data center campus | None announced — no dated milestone on record (Announced) | ||||
| Poolside Project Horizon | Energization | Dec 2025 | Month | ||
| Commissioning | 2027 | Year | |||
| Sweetwater 1 and 2 (IREN) | Energization | 2027 | Year | ||
| Tract Caldwell County Technology Park | Energization | 2028 | Year | ||
| Wheatfield data center and gas plant | None announced — no dated milestone on record (Announced) | ||||
| AWS Susquehanna Nuclear Data Center Campus | Energization | 2029 | Year | ||
| Energization | 2032 | Year | |||
| Talen Energy - AWS Susquehanna PPA | None announced — no dated milestone on record (Announced) | ||||
| AREP PowerHouse Grand Prairie | Groundbreaking | Q1 2025 | Quarter | ||
| Energization | May 2026 | Month | |||
| Crusoe Callaway County Missouri data center | None announced — no dated milestone on record (Announced) | ||||
| Joliet data center campus | None announced — no dated milestone on record (Announced) | ||||
| Yorkville data center campus | None announced — no dated milestone on record (Announced) | ||||
| Crusoe / Blue Energy Data Center (Victoria, TX) | Energization | 2028 | Year | ||
| Vantage Data Centers Frontier (Shackelford County / Stargate) | Commissioning | H2 2026 | Half-year | ||
| Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus | None announced — no dated milestone on record (Announced) | ||||
| CloudBurst Data Center (New Braunfels) | Energization | 2026 | Year | ||
| Stargate Abilene (Crusoe campus) | Phase 2 energization — full 1.2 GW campus (eight buildings) | H1 2026 | Half-year | ||
| Commissioning | H1 2026 | Half-year | |||
| Stargate Milam County (OpenAI / SB Energy) | Commissioning | Oct 2026 | Month | ||
| Energization | 2026 | Year | |||
| Crane Clean Energy Center | Energization | 1970 | Year | ||
| Meta Lebanon Data Center Campus (LEAP District) | None announced — no dated milestone on record (Construction) | ||||
| Meta Prometheus (New Albany) | Energization | Q3 2026 | Quarter | ||
| Stargate Michigan - The Barn (Saline Township) | Commissioning | H1 2028 | Half-year | ||
| Stargate New Mexico - Project Jupiter (Dona Ana County) | Commissioning | 2026 | Year | ||
| Stargate UAE (Abu Dhabi) | First 200 MW phase of Stargate UAE live | Q3 2026 | Quarter | ||
| xAI Colossus 2 (Memphis) | Energization | Apr 2026 | Month | ||
| Energization | Q2 2027 | Quarter | |||
| Amazon / AWS Salem Township Data Center Campus (Susquehanna) | None announced — no dated milestone on record (Construction) | ||||
| Robena Mine Data Center (Project Hummingbird) | Commissioning | 1970 | Year | ||
| Stargate Wisconsin - Vantage Lighthouse (Port Washington) | Commissioning | Q3 2027 | Quarter | ||
| Commissioning | 2028 | Year | |||
| Cologix Johnstown AI-Ready Campus | Groundbreaking | 2025 | Year | ||
| Nexus Data Center (Hubbard) | Energization | 2026 | Year | ||
| Project Aggie (College Station) | Announcement | Sep 9, 2025 | Exact day | ||
| Aligned Project Caprock (Hale County) | None announced — no dated milestone on record (Construction) | ||||
| Stargate Argentina (Patagonia) | Groundbreaking | 2026 | Year | ||
| Energization | 2027 | Year | |||
| EdgeCore Mesa (Greater Phoenix) | None announced — no dated milestone on record (Construction) | ||||
| DataBank Red Oak Campus (South Dallas) | None announced — no dated milestone on record (Construction) | ||||
| Stack Infrastructure NVA02 (Manassas) | None announced — no dated milestone on record (Operating) | ||||
| Vantage Pittsboro Campus | None announced — no dated milestone on record (Permitted) | ||||
| Project Comal | None announced — no dated milestone on record (Permitted) | ||||
| Novva Data Centers Mesa | Commissioning | Q4 2026 | Quarter | ||
| Rowan Cinco Data Center Campus (Medina County) | None announced — no dated milestone on record (Construction) | ||||
| Compass Datacenters Goodyear | None announced — no dated milestone on record (Construction) | ||||
| Vantage Data Centers Ashburn I (VA1) | None announced — no dated milestone on record (Operating) | ||||
| Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | Energization | 2026 | Year | ||
| T5 @ Atlanta IV (Palmetto) | Commissioning | 2027 | Year | ||
| DataBank Culpeper Campus (IAD5/IAD6) | None announced — no dated milestone on record (Planned) | ||||
| Vantage Data Centers OH1 (New Albany) | Commissioning | 2025 | Year | ||
| Vantage Data Centers AZ1 (Goodyear) | None announced — no dated milestone on record (Construction) | ||||
| Edged Atlanta ATL01 Campus (Tilford Yard) | None announced — no dated milestone on record (Operating) | ||||
| Meta Temple Data Center | None announced — no dated milestone on record (Commissioned) | ||||
| DataBank Lithia Springs Campus (ATL5/ATL6) | None announced — no dated milestone on record (Construction) | ||||
| DC BLOX Atlanta West | Energization | 2027 | Year | ||
| CoreWeave Lancaster AI Data Center Campus | None announced — no dated milestone on record (Planned) | ||||
| Khazna QAJ1 Ajman AI Data Center | Commissioning | Dec 2026 | Month | ||
| Meta El Paso Data Center | Energization | 2028 | Year | ||
| Microsoft Project Rita (Tyrone) | None announced — no dated milestone on record (Permitted) | ||||
| NEXTDC S3 (Sydney) | None announced — no dated milestone on record (Operating) | ||||
| Metrobloks IND-A1 (Indianapolis) | None announced — no dated milestone on record (Permitted) | ||||
| T5 @ Charlotte II (Kings Mountain) | Commissioning | 2026 | Year | ||
| QTS Ashburn 1 (ASH1) | Energization | Q2 2026 | Quarter | ||
| Digital Edge SEL2 (Incheon) | None announced — no dated milestone on record (Operating) | ||||
| Khazna AUH8 Masdar City AI Data Center | Commissioning | Aug 2026 | Month | ||
| NTT VA6 (Ashburn) | None announced — no dated milestone on record (Operating) | ||||
| Equinix SG6 (Singapore) | None announced — no dated milestone on record (Construction) | ||||
| DC BLOX Henrico (Wilkinson Road) | None announced — no dated milestone on record (Construction) | ||||
| Cirion BUE1 Buenos Aires Expansion | Commissioning | Nov 2025 | Month | ||
| ARSAT Benavidez Data Center Hall IV Expansion | None announced — no dated milestone on record (Planned) | ||||
| AirTrunk Osaka Campus (OSK1 + OSK2) | None announced — no dated milestone on record (Construction) | ||||
| AirTrunk SYD3 (Western Sydney) | None announced — no dated milestone on record (Permitting) | ||||
| Aligned IAD-02 (Ashburn) | None announced — no dated milestone on record (Construction) | ||||
| Amazon / AWS Falls Township Data Center (Keystone Trade Center) | None announced — no dated milestone on record (Construction) | ||||
| Amazon Devlin Technology Park (Bristow) | None announced — no dated milestone on record (Planned) | ||||
| Apple Maiden Data Center | None announced — no dated milestone on record (Operating) | ||||
| AWS Desper Creek Technology Campus (Louisa County) | None announced — no dated milestone on record (Permitting) | ||||
| AWS Georgia Data Center Campuses (Butts & Douglas Counties) | None announced — no dated milestone on record (Planned) | ||||
| AWS Hilliard Third Campus (Scioto Darby Road) | None announced — no dated milestone on record (Permitted) | ||||
| AWS Louisa County Campuses (Lake Anna Tech Campus) | Commissioning | 2040 | Year | ||
| AWS New Albany Data Center Campus | None announced — no dated milestone on record (Operating) | ||||
| Blackstone QTS Cambois Campus (Blyth) | None announced — no dated milestone on record (Construction) | ||||
| Bridge Data Centres MY07 (Ulu Tiram) | None announced — no dated milestone on record (Construction) | ||||
| CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract | None announced — no dated milestone on record (Permitted) | ||||
| Crusoe / Lancium Abilene AI Campus (Stargate) | None announced — no dated milestone on record (Construction) | ||||
| CyrusOne New Albany COL-1 | None announced — no dated milestone on record (Construction) | ||||
| CyrusOne Project Peach (Coweta County) | Utility Approval | Oct 2026 | Month | ||
| CyrusOne Whitney Campus (DFW10 series, Bosque County) | None announced — no dated milestone on record (Construction) | ||||
| DC BLOX Atlanta East (Rockdale County) | None announced — no dated milestone on record (Construction) | ||||
| du-Microsoft Hyperscale Data Center (Dubai) | None announced — no dated milestone on record (Planned) | ||||
| EdgeConneX New Albany Campus | Commissioning | Apr 2026 | Month | ||
| EdgeCore Culpeper Campus | None announced — no dated milestone on record (Announced) | ||||
| Empyrion KR1 Gangnam (Seoul) | None announced — no dated milestone on record (Operating) | ||||
| Energy Capital Partners / Calpine York 2 Data Center | None announced — no dated milestone on record (Announced) | ||||
| Google / Intersect Meitner Energy Center (Texas Panhandle) | None announced — no dated milestone on record (Construction) | ||||
| Google Chesterfield Data Center Campus (Project Peanut) | Groundbreaking | H1 2026 | Half-year | ||
| Google Council Bluffs Data Center | None announced — no dated milestone on record (Operating) | ||||
| Google Douglas County Data Center | None announced — no dated milestone on record (Operating) | ||||
| Google Fort Wayne Data Center | None announced — no dated milestone on record (Construction) | ||||
| Google Goodnight Campus (Armstrong County, TX) | None announced — no dated milestone on record (Construction) | ||||
| Google Hanau Data Center | None announced — no dated milestone on record (Operating) | ||||
| Google Haskell County Data Centers | Energization | Jun 2026 | Month | ||
| Google Lenoir Data Center | None announced — no dated milestone on record (Operating) | ||||
| Google Mesa Data Center | None announced — no dated milestone on record (Construction) | ||||
| Google Midlothian Campus - Building 5 (Sharka) | None announced — no dated milestone on record (Construction) | ||||
| Google New Albany Campus (Montauk Innovations) | None announced — no dated milestone on record (Announced) | ||||
| Google Project Pegasus (LaGrange) | None announced — no dated milestone on record (Construction) | ||||
| Google Tussenweg / Green Box Computing (Hollands Kroon) | None announced — no dated milestone on record (Announced) | ||||
| Google Waltham Cross Data Centre | None announced — no dated milestone on record (Operating) | ||||
| Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | None announced — no dated milestone on record (Construction) | ||||
| Iron Mountain VA-1 (Manassas) | None announced — no dated milestone on record (Operating) | ||||
| Meta (Facebook) Forest City Data Center | None announced — no dated milestone on record (Operating) | ||||
| Meta Altoona Data Center | None announced — no dated milestone on record (Construction) | ||||
| Meta Henrico Data Center (White Oak Technology Park) | None announced — no dated milestone on record (Operating) | ||||
| Meta Jeffersonville Data Center | None announced — no dated milestone on record (Construction) | ||||
| Meta Mesa Data Center | None announced — no dated milestone on record (Announced) | ||||
| Meta Stanton Springs / Newton Data Center | Commissioning | Dec 31, 2026 | Exact day | ||
| Commissioning | 2028 | Year | |||
| Commissioning | 2030 | Year | |||
| Commissioning | 2032 | Year | |||
| Microsoft Boydton Campus | None announced — no dated milestone on record (Operating) | ||||
| Microsoft Fairwater (Mount Pleasant) | Energization | 2026 | Year | ||
| Energization | H2 2027 | Half-year | |||
| Microsoft Fairwater Atlanta | None announced — no dated milestone on record (Operating) | ||||
| Microsoft Granger Data Center (St. Joe Farms) | None announced — no dated milestone on record (Planned) | ||||
| Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) | None announced — no dated milestone on record (Announced) | ||||
| Microsoft Mount Pleasant Data Center Campus | None announced — no dated milestone on record (Construction) | ||||
| Microsoft New Albany Data Centers | None announced — no dated milestone on record (Planned) | ||||
| Microsoft Palmetto Data Center | None announced — no dated milestone on record (Construction) | ||||
| Microsoft Southeast Asia 3 Region (Johor Bahru) | None announced — no dated milestone on record (Announced) | ||||
| Microsoft West Des Moines Data Centers | None announced — no dated milestone on record (Operating) | ||||
| NEXTDC M3 (West Footscray, Melbourne) | None announced — no dated milestone on record (Operating) | ||||
| NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) | None announced — no dated milestone on record (Announced) | ||||
| Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) | None announced — no dated milestone on record (Announced) | ||||
| NTT Grove at Gainesville Campus (VA10-VA13) | None announced — no dated milestone on record (Construction) | ||||
| Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) | Commissioning | 2030 | Year | ||
| PowerHouse 95 (Spotsylvania) | None announced — no dated milestone on record (Construction) | ||||
| Prince William Digital Gateway (QTS / Compass) | None announced — no dated milestone on record (Cancelled) | ||||
| Project Gravity (Archbald / Gouldsboro Data Center Campus) | None announced — no dated milestone on record (Stalled) | ||||
| Prologis Project Sail (Coweta County) | None announced — no dated milestone on record (Permitted) | ||||
| Prologis Shelbyville Data Center Campus | None announced — no dated milestone on record (Planned) | ||||
| QTS Atlanta Metro DC1 | None announced — no dated milestone on record (Operating) | ||||
| QTS Fayetteville Campus (Project Excalibur) | None announced — no dated milestone on record (Construction) | ||||
| QTS Salem Township Campus | None announced — no dated milestone on record (Planned) | ||||
| QTS White Oak Expansion (RIC4/RIC5, Henrico) | None announced — no dated milestone on record (Permitted) | ||||
| Rowan Project Temple (Bell County) | None announced — no dated milestone on record (Construction) | ||||
| SK Group + AWS Ulsan AI Data Center | None announced — no dated milestone on record (Construction) | ||||
| Skybox / Prologis PowerCampus Austin (Hutto) | None announced — no dated milestone on record (Construction) | ||||
| Stack Infrastructure Berry Hill Megasite (Pittsylvania) | None announced — no dated milestone on record (Planned) | ||||
| Switch The Keep Campus (Douglas County) | None announced — no dated milestone on record (Operating) | ||||
| Telecom Argentina Edge AI Data Center Conversion Program | None announced — no dated milestone on record (Announced) | ||||
Phases derive from milestone-type transitions (groundbreaking → construction; energization/commissioning → operating) plus current statuses. 47 of 156 projects carry dated milestone claims (64 dated milestones; precision mix: 2 day, 11 month, 9 quarter, 7 half, 35 year). Already-due claims apply from the current month; nothing is interpolated or forecast.