|
xAI Colossus 2 (Memphis)
|
US — Rest of US (composite)
|
xAI
|
1,000
facility total
|
Operating
|
79.8/100
|
|
AWS Project Rainier (New Carlisle)
|
US — Rest of US (composite)
|
Amazon Web Services
|
2,200
facility total
|
Operating
|
77/100
|
|
Stargate Abilene (Crusoe campus)
|
US — Texas (ERCOT)
|
Crusoe
|
1,200
facility total
|
Operating
|
75.8/100
|
|
Meta Stanton Springs / Newton Data Center
|
US — Georgia (Southern/Georgia Power)
|
Meta
|
—
|
Operating
|
74/100
|
|
QTS Atlanta Metro DC1
|
US — Georgia (Southern/Georgia Power)
|
QTS Data Centers
|
—
|
Operating
|
69.5/100
|
|
Stack Infrastructure NVA02 (Manassas)
|
US — Virginia (PJM/Dominion)
|
STACK Infrastructure
|
420
it load
|
Operating
|
69.5/100
|
|
QTS Ashburn 1 (ASH1)
|
US — Virginia (PJM/Dominion)
|
QTS Data Centers
|
55
it load
|
Operating
|
69.5/100
|
|
Iron Mountain VA-1 (Manassas)
|
US — Virginia (PJM/Dominion)
|
Iron Mountain
|
—
|
Operating
|
69.5/100
|
|
NEXTDC M3 (West Footscray, Melbourne)
|
Australia
|
NEXTDC
|
—
|
Operating
|
69.5/100
|
|
Google Papillion Data Center (Sarpy County)
|
US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP)
|
Google
|
—
|
Operating
|
69.5/100
|
|
Aligned Salt Lake Metro Campus (SLC-01 to SLC-04)
|
US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO)
|
Aligned Data Centers
|
—
|
Operating
|
69.5/100
|
|
Meta El Paso Data Center
|
US — Texas (ERCOT)
|
Meta
|
100
unspecified
|
Operating
|
66.3/100
|
|
Cirion BUE1 Buenos Aires Expansion
|
Argentina
|
Cirion Technologies
|
9
unspecified
|
Operating
|
64/100
|
|
Microsoft Fairwater Atlanta
|
US — Georgia (Southern/Georgia Power)
|
Microsoft
|
—
|
Operating
|
63/100
|
|
Meta Henrico Data Center (White Oak Technology Park)
|
US — Virginia (PJM/Dominion)
|
Meta Platforms (Facebook)
|
—
|
Operating
|
62/100
|
|
Vantage Data Centers Ashburn I (VA1)
|
US — Virginia (PJM/Dominion)
|
Vantage Data Centers
|
206
it load
|
Operating
|
61.5/100
|
|
Switch The Keep Campus (Douglas County)
|
US — Georgia (Southern/Georgia Power)
|
Switch
|
—
|
Operating
|
61.5/100
|
|
Meta Eagle Mountain Campus
|
US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO)
|
Meta
|
—
|
Operating
|
61.5/100
|
|
Meta (Facebook) Forest City Data Center
|
US — North Carolina (Duke Energy)
|
Meta (Facebook)
|
—
|
Operating
|
60/100
|
|
Google Douglas County Data Center
|
US — Georgia (Southern/Georgia Power)
|
Google
|
—
|
Operating
|
59.5/100
|
|
Google Lenoir Data Center
|
US — North Carolina (Duke Energy)
|
Google
|
—
|
Operating
|
59.5/100
|
|
Google Winschoten Data Center (Groningen)
|
Netherlands
|
Google
|
—
|
Operating
|
58.5/100
|
|
YTL Green Data Center Park (Kulai)
|
Malaysia — Johor (Johor-Singapore SEZ)
|
YTL Power International
|
500
unspecified
|
Operating
|
58.5/100
|
|
Microsoft West Des Moines Data Centers
|
US — Iowa (MISO)
|
Microsoft
|
—
|
Operating
|
58/100
|
|
Edged Atlanta ATL01 Campus (Tilford Yard)
|
US — Georgia (Southern/Georgia Power)
|
Edged
|
168
it load
|
Operating
|
58/100
|
|
NEXTDC S3 (Sydney)
|
Australia
|
NEXTDC
|
80
unspecified
|
Operating
|
58/100
|
|
Digital Edge SEL2 (Incheon)
|
South Korea
|
Digital Edge, SK Ecoplant
|
36
unspecified
|
Operating
|
58/100
|
|
Empyrion KR1 Gangnam (Seoul)
|
South Korea
|
Empyrion Digital
|
—
|
Operating
|
58/100
|
|
Bridge Data Centres MY06 (Sedenak)
|
Malaysia — Johor (Johor-Singapore SEZ)
|
Bridge Data Centres
|
110
unspecified
|
Operating
|
58/100
|
|
GDS / DayOne Nusajaya Tech Park Campus
|
Malaysia — Johor (Johor-Singapore SEZ)
|
GDS Holdings
|
—
|
Operating
|
58/100
|
|
AirTrunk TOK1 (Inzai, Tokyo East)
|
Japan
|
AirTrunk
|
—
|
Operating
|
58/100
|
|
AirTrunk TOK2 (Koto, Tokyo West)
|
Japan
|
AirTrunk
|
—
|
Operating
|
58/100
|
|
Meta Gallatin Data Center
|
US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO)
|
Meta
|
—
|
Operating
|
58/100
|
|
Google Hanau Data Center
|
Germany
|
Google, GARBE.DC
|
—
|
Operating
|
57.5/100
|
|
Google Clarksville Data Center
|
US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO)
|
Google
|
—
|
Operating
|
57.5/100
|
|
Google Waltham Cross Data Centre
|
United Kingdom
|
Google
|
—
|
Operating
|
56.5/100
|
|
AWS New Albany Data Center Campus
|
US — Ohio (AEP Ohio / PJM)
|
Amazon Web Services
|
—
|
Operating
|
56/100
|
|
Google Council Bluffs Data Center
|
US — Iowa (MISO)
|
Google
|
—
|
Operating
|
55/100
|
|
Microsoft Boydton Campus
|
US — Virginia (PJM/Dominion)
|
Microsoft
|
—
|
Operating
|
54/100
|
|
NTT VA6 (Ashburn)
|
US — Virginia (PJM/Dominion)
|
NTT Ltd.
|
24
it load
|
Operating
|
54/100
|
|
Apple Maiden Data Center
|
US — North Carolina (Duke Energy)
|
Apple
|
—
|
Operating
|
52/100
|
|
xAI Colossus 1 (Memphis)
|
US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO)
|
xAI
|
—
|
Operating
|
52/100
|
|
Meta Sarpy Data Center (Papillion/Springfield)
|
US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP)
|
Meta
|
—
|
Operating
|
52/100
|