Jurisdiction: US — Indiana (MISO)
Lebanon, Indiana (LEAP Innovation District, Boone County); $10B, ~4M sq ft, 1GW.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Meta Lebanon Data Center Campus (LEAP District) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Meta Lebanon Data Center Campus (LEAP District) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | Meta Lebanon Data Center Campus (LEAP District) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Lebanon Data Center Campus (LEAP District) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2026-02-13). |
Announcement · Actual:
Groundbreaking
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta | — | — | |
| Turner Construction | — | — | |
| Mortenson | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Turner Construction · Feb 13, 2026 · backs: actual date, capacity mw, status
https://www.turnerconstruction.com/insights/turner-selected-as-one-of-the-contractors-for-10-billion-meta-data-center-campus-in-indiana
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Turner Construction
Mortenson