Meta Jeffersonville Data Center

Meta Jeffersonville Data Center

Construction
Confirmed

Jurisdiction: US — Indiana (MISO)

Jeffersonville, Indiana (Clark County); >$800M, ~700k sq ft. Turner sole GC.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

55.3 /100
55.3/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

65 /100
65/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Meta Jeffersonville Data Center No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 Meta Jeffersonville Data Center Newest capital evidence is 2024-01-25 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Meta Jeffersonville Data Center No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Meta Jeffersonville Data Center Newest infrastructure evidence is 2024-01-25 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Meta Jeffersonville Data Center No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 Meta Jeffersonville Data Center Newest regulatory evidence is 2024-01-25 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Meta Jeffersonville Data Center No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2024-01-25).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2024-01-01).
Schedule staleness decay -25 Meta Jeffersonville Data Center Newest schedule evidence is 2024-01-25 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

  2. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Meta
Owner
Turner Construction
General Contractor

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Turner Construction · Jan 25, 2024 · backs: actual date, status

    https://www.turnerconstruction.com/insights/turner-construction-company-to-build-hyperscale-data-center-for-meta-in-indiana

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Turner Construction