Google Waltham Cross Data Centre

Google Waltham Cross Data Centre

Operating
Confirmed

Jurisdiction: United Kingdom

33-acre site (acquired late 2020), Waltham Cross, Hertfordshire — Google's first UK-owned DC; construction from Jan 2024; opened Sep 16 2025 by Chancellor Rachel Reeves; part of a two-year £5B UK investment. Capacity undisclosed (the Google pattern).

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

56.5 /100
56.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

60 /100
60/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Regulatory staleness decay -20 Google Waltham Cross Data Centre Newest regulatory evidence is 2025-09-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Capital baseline 40 Google Waltham Cross Data Centre No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Google Waltham Cross Data Centre No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure interconnection progress +15 Commissioning Power/interconnection milestone "Commissioning" achieved on 2025-09-16 — largest single health event (§B.2.3).
Infrastructure staleness decay -25 Google Waltham Cross Data Centre Newest infrastructure evidence is 2025-09-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Google Waltham Cross Data Centre No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Google Waltham Cross Data Centre No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Commissioning Milestone "Commissioning" achieved on/ahead of its first announced date (2025-09-16).
Schedule staleness decay -25 Google Waltham Cross Data Centre Newest schedule evidence is 2025-09-16 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Commissioning

    Achieved

    Commissioning · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Google
Owner

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Google · Sep 16, 2025 · backs: actual date, status

    https://blog.google/around-the-globe/google-europe/united-kingdom/waltham-cross-data-centre/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Google · relevance 0.90