Jurisdiction: US — Ohio (AEP Ohio / PJM)

New Albany, Licking County, Ohio (and Franklin County). Amazon operates campuses in both counties; part of a multi-billion Ohio expansion.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

54.5 /100
54.5/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

65 /100
65/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 AWS New Albany Data Center Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 AWS New Albany Data Center Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 AWS New Albany Data Center Campus Newest infrastructure evidence is 2025-08-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 AWS New Albany Data Center Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 AWS New Albany Data Center Campus Newest regulatory evidence is 2025-08-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 AWS New Albany Data Center Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2016-01-01).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2023-06-26).
Schedule staleness decay -25 AWS New Albany Data Center Campus Newest schedule evidence is 2023-06-26 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Amazon Web Services
Owner

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. About Amazon · Aug 1, 2025 · backs: status

    https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news

  2. WOSU/Ideastream · Jun 26, 2023 · backs: actual date

    https://www.ideastream.org/2023-06-26/amazon-to-spend-7-8-billion-to-build-more-central-ohio-data-centers

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · About Amazon

  2. · WOSU/Ideastream