Jurisdiction: US — Ohio (AEP Ohio / PJM)
New Albany, Licking County, Ohio (and Franklin County). Amazon operates campuses in both counties; part of a multi-billion Ohio expansion.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | AWS New Albany Data Center Campus | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | AWS New Albany Data Center Campus | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | AWS New Albany Data Center Campus | Newest infrastructure evidence is 2025-08-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | AWS New Albany Data Center Campus | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | AWS New Albany Data Center Campus | Newest regulatory evidence is 2025-08-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | AWS New Albany Data Center Campus | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2016-01-01). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2023-06-26). |
| Schedule | staleness decay | -25 | AWS New Albany Data Center Campus | Newest schedule evidence is 2023-06-26 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Amazon Web Services | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
About Amazon · Aug 1, 2025 · backs: status
https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news
WOSU/Ideastream · Jun 26, 2023 · backs: actual date
https://www.ideastream.org/2023-06-26/amazon-to-spend-7-8-billion-to-build-more-central-ohio-data-centers
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· About Amazon
· WOSU/Ideastream