Jurisdiction: US — Texas (ERCOT)
768-acre campus just outside Grand Prairie in northern Ellis County, Texas, between Dallas and Fort Worth, north of Route 67 near Midlothian (PR + DCD + Bisnow). Discrepancy: company project page lists "Grand Prairie" / 810 acres / 28 buildings across four phases / Q4 2026–Q1 2027 delivery, versus PR's 768 acres / 24 buildings / three phases / May 2026 first-building energization. No verified coordinates.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | AREP PowerHouse Grand Prairie | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | AREP PowerHouse Grand Prairie | Newest capital evidence is 2025-02-25 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | AREP PowerHouse Grand Prairie | Newest regulatory evidence is 2025-02-25 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | AREP PowerHouse Grand Prairie | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | AREP PowerHouse Grand Prairie | Newest infrastructure evidence is 2025-02-25 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | AREP PowerHouse Grand Prairie | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | AREP PowerHouse Grand Prairie | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-02-25). |
| Schedule | staleness decay | -25 | AREP PowerHouse Grand Prairie | Newest schedule evidence is 2025-02-25 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Groundbreaking · Expected:
Announcement · Actual:
Energization · Expected:
Utility approval
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| ERCOT | — | — | |
| PowerHouse Data Centers | — | — | |
| American Real Estate Partners (AREP) | — | — | |
| Provident Data Centers | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
PowerHouse Data Centers · Feb 25, 2025 · backs: actual date, capacity mw, expected date, status
https://www.powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus
Bisnow · Jan 8, 2025 · backs: expected date
https://www.bisnow.com/national/news/data-center/provident-powerhouse-partner-on-768-acre-texas-data-center-campus-127465
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics
· PowerHouse Data Centers
· PR Newswire
· Bisnow