Ratings for the physical buildout of AI
AI Data Center Projects
194 tracked projects representing
117,627 MW of announced or built capacity across
29 jurisdictions.
194 carry a current 0–100 delivery health score (higher is healthier),
scored across schedule, regulatory, infrastructure, and capital risk — every factor cites its source.
Insights
Wisconsin and Georgia leads are accelerating hard—Stargate Wisconsin +23 points, Fermi Matador +20.4—while three major projects (AWS Calvert, Project Aggie, Prince William) have cratered to health 10, signaling permitting or infrastructure gridlock. The delivery bet: Midwest and Southeast corridor builds are pulling ahead; coastal and legacy-site projects are stalling.
AI-generated · updated 6 hours ago
Status
All statuses Announced Planned Permitting Permitted Construction Energized Commissioned Operating Stalled Cancelled
Jurisdiction
All jurisdictions Argentina Australia France Germany Ireland Japan Malaysia — Johor (Johor-Singapore SEZ) Netherlands Singapore South Korea United Arab Emirates United Kingdom US — Arizona (APS/SRP) US — Georgia (Southern/Georgia Power) US — Indiana (MISO) US — Iowa (MISO) US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) US — Minnesota (Xcel / MISO) US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) US — North Carolina (Duke Energy) US — Ohio (AEP Ohio / PJM) US — Pennsylvania (PJM) US — Rest of US (composite) US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) US — Texas (ERCOT) US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) US — Virginia (PJM/Dominion) US — Wisconsin (MISO)
Health score
All scores 80-100 60-79 40-59 0-39
Clear filters
4 projects