CyrusOne Project Peach (Coweta County)

CyrusOne Project Peach (Coweta County)

Permitted
Confirmed

Jurisdiction: US — Georgia (Southern/Georgia Power)

320+ acres at SR-14/US-29, Weldon Road and Johnston Circle, near Palmetto (Coweta County side). 2.1M sq ft campus, ~700MW energy draw, phased through 2036; rezoning approved April 2026 (3-2); Georgia Power PPA still pending (12-month extension granted Oct 2025).

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

63 /100
63/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

80 /100
80/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 CyrusOne Project Peach (Coweta County) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory baseline 70 CyrusOne Project Peach (Coweta County) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Infrastructure baseline 70 CyrusOne Project Peach (Coweta County) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 CyrusOne Project Peach (Coweta County) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).

Milestones

  1. Utility Approval

    Expected
    1 revision

    Utility approval · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
CyrusOne
Developer
Georgia Power
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Newnan Times-Herald · backs: expected date, status

    https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Newnan Times-Herald

  2. Newnan Times-Herald