Jurisdiction: US — Georgia (Southern/Georgia Power)
320+ acres at SR-14/US-29, Weldon Road and Johnston Circle, near Palmetto (Coweta County side). 2.1M sq ft campus, ~700MW energy draw, phased through 2036; rezoning approved April 2026 (3-2); Georgia Power PPA still pending (12-month extension granted Oct 2025).
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | CyrusOne Project Peach (Coweta County) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | baseline | 70 | CyrusOne Project Peach (Coweta County) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | baseline | 70 | CyrusOne Project Peach (Coweta County) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | CyrusOne Project Peach (Coweta County) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
Utility approval · Expected:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| CyrusOne | — | — | |
| Georgia Power | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Newnan Times-Herald · backs: expected date, status
https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Newnan Times-Herald
Newnan Times-Herald