Compute Institute
Ratings for the physical buildout of AI
Google New Albany Campus (Montauk Innovations)

Google New Albany Campus (Montauk Innovations)

Announced
Probable

Jurisdiction: US — Ohio (AEP Ohio / PJM)

~85 acres at 2565 Harrison Road NW, New Albany (Licking County), Ohio; acquired from DBT-Data. Land acquisition; development 'potential' per Google.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

51 /100
51/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Google New Albany Campus (Montauk Innovations) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 Google New Albany Campus (Montauk Innovations) Newest capital evidence is 2025-06-13 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory staleness decay -20 Google New Albany Campus (Montauk Innovations) Newest regulatory evidence is 2025-06-13 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Google New Albany Campus (Montauk Innovations) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Google New Albany Campus (Montauk Innovations) Newest infrastructure evidence is 2025-06-13 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Google New Albany Campus (Montauk Innovations) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Google New Albany Campus (Montauk Innovations) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-06-13).
Schedule staleness decay -25 Google New Albany Campus (Montauk Innovations) Newest schedule evidence is 2025-06-13 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Google
Developer
Montauk Innovations LLC
Developer
DBT-Data
Investor

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Data Center Dynamics · Jun 13, 2025 · backs: actual date, status

    https://www.datacenterdynamics.com/en/news/google-acquires-85-acres-in-new-albany-ohio/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · ABC6 On Your Side

  2. · Data Center Dynamics