Rowan Bauxite II (Quantum Frederick)

Rowan Bauxite II (Quantum Frederick)

Construction
Confirmed

Jurisdiction: US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM)

Quantum Frederick Park, Frederick County, MD — second Bauxite phase, 822,620 sq ft on 111.5 acres (Bauxite III, 591,913 sq ft / 55 acres, follows). Campus target ~625MW total by 2027.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

51.8 /100
51.8/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

55 /100
55/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Rowan Bauxite II (Quantum Frederick) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 Rowan Bauxite II (Quantum Frederick) Newest capital evidence is 2025-02-25 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Rowan Bauxite II (Quantum Frederick) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Rowan Bauxite II (Quantum Frederick) Newest infrastructure evidence is 2025-02-25 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Rowan Bauxite II (Quantum Frederick) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 Rowan Bauxite II (Quantum Frederick) Newest regulatory evidence is 2025-02-25 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Rowan Bauxite II (Quantum Frederick) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule staleness decay -25 Rowan Bauxite II (Quantum Frederick) Newest schedule evidence is 2025-02-25 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Rowan Digital Infrastructure
Developer
Sumitomo Mitsui Banking Corporation
Lender
MUFG Bank
Lender

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Rowan Digital Infrastructure · Feb 25, 2025 · backs: status

    https://rowan.digital/quinbrooks-rowan-digital-infrastructure-secures-1-24-billion-financing-for-hyperscale-campus-in-maryland/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Rowan Digital Infrastructure · relevance 0.90

  2. · Frederick County Planning Commission · relevance 0.90

  3. Quinbrook Infrastructure Partners · relevance 0.30