Jurisdiction: US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO)
6477 West Wells Park Road, West Jordan (Salt Lake County) — 100 acres, 4-phase / 1.5M sq ft HQ campus; Phase 1 operating since 2023; Phases 2 (75MW, Dec 2023 start) + 3 (72MW, Jan 2024 start) building to 2026; on-site 200MW substation; $2B JPMorgan/Starwood construction loan. Also self-generating: Utah DAQ AO DAQE-AN160660003-24 permits 72 gas engines (~235.6MW) as PRIMARY power for two new buildings, making the site a Title V major CO/HAP source with 47 tpy NOx offsets.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Novva West Jordan Campus | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Novva West Jordan Campus | Newest capital evidence is 2025-03-05 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Novva West Jordan Campus | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Novva West Jordan Campus | Newest infrastructure evidence is 2025-03-05 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Novva West Jordan Campus | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Novva West Jordan Campus | Newest regulatory evidence is 2025-03-05 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Novva West Jordan Campus | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | Novva West Jordan Campus | Newest schedule evidence is 2025-03-05 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| JPMorgan Chase | — | — | |
| Novva Data Centers | — | — | |
| Starwood Property Trust | — | — | |
| Layton Construction | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Business Wire (CIM Group / Novva release) · Mar 5, 2025 · backs: status
https://www.businesswire.com/news/home/20250305288564/en/CIM-Group-and-Novva-Data-Centers-Announce-$2-Billion-in-New-Financing-to-Accelerate-Growth-in-Delivering-Sustainable-Efficient-Data-Centers-Across-the-Western-U.S.
Data Center Dynamics · Jun 1, 2024 · backs: capacity mw
https://www.datacenterdynamics.com/en/news/novva-secures-2bn-loan-to-expand-west-jordan-campus-in-utah/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Business Wire (CIM Group / Novva release) · relevance 0.70
· daqpermitting.utah.gov · relevance 0.90
· Data Center Dynamics · relevance 0.90
Novva Data Centers · relevance 0.30
EDC Utah · relevance 0.90