Jurisdiction: US — Virginia (PJM/Dominion)
White Oak Technology Park, eastern Henrico County (I-295/I-64), Sandston/Richmond area, VA. Online since Aug 2020; planned ~2.5M sq ft, 300+ acre campus.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | staleness decay | +10 | Meta Henrico Data Center (White Oak Technology Park) | Newest capital evidence is 2020-08-05 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | Meta Henrico Data Center (White Oak Technology Park) | Newest regulatory evidence is 2020-08-05 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | Meta Henrico Data Center (White Oak Technology Park) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Meta Henrico Data Center (White Oak Technology Park) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2020-08-05 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | Meta Henrico Data Center (White Oak Technology Park) | Newest infrastructure evidence is 2020-08-05 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Meta Henrico Data Center (White Oak Technology Park) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Henrico Data Center (White Oak Technology Park) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2017-10-05). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2020-08-05). |
| Schedule | milestone achieved | +5 | Groundbreaking | Milestone "Groundbreaking" achieved on/ahead of its first announced date (2018-02-01). |
| Schedule | staleness decay | -25 | Meta Henrico Data Center (White Oak Technology Park) | Newest schedule evidence is 2020-08-05 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Groundbreaking · Actual:
Commissioning · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta Platforms (Facebook) | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Henrico EDA · May 3, 2018 · backs: actual date
https://henrico.com/breaking-news-facebook-receive-cici-award-for-henrico-project/
Henrico EDA · Aug 5, 2020 · backs: actual date, status
https://henrico.com/press-release/facebooks-henrico-data-center-is-officially-online/
WVTF/Radio IQ · Oct 5, 2017 · backs: actual date
https://www.wvtf.org/news/2017-10-05/facebook-comes-to-virginia-with-billion-dollar-data-center
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Henrico EDA
· Henrico EDA