Compute Institute
Ratings for the physical buildout of AI
AirTrunk SYD3 (Western Sydney)

AirTrunk SYD3 (Western Sydney)

Permitting
Probable

Jurisdiction: Australia

51 Huntingwood Drive, ~30km west of Sydney — nine phases across 8.3ha; 132kV on-site substation; PUE 1.15 design. Land acquired Nov 2021 (~A$110M); DA filed; billed as APAC's largest single campus (ex-China) at announcement.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

50.5 /100
50.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

55 /100
55/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 AirTrunk SYD3 (Western Sydney) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 AirTrunk SYD3 (Western Sydney) Newest capital evidence is 2024-01-01 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 AirTrunk SYD3 (Western Sydney) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 AirTrunk SYD3 (Western Sydney) Newest infrastructure evidence is 2024-01-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 AirTrunk SYD3 (Western Sydney) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 AirTrunk SYD3 (Western Sydney) Newest regulatory evidence is 2024-01-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 AirTrunk SYD3 (Western Sydney) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule staleness decay -25 AirTrunk SYD3 (Western Sydney) Newest schedule evidence is 2024-01-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
AirTrunk
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. AirTrunk · Jan 1, 2024 · backs: status

    https://airtrunk.com/airtrunk-expands-western-sydney-region-with-new-syd3-hyperscale-data-centre-asia-pacifics-largest/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · AirTrunk · relevance 0.95