Jurisdiction: Australia
51 Huntingwood Drive, ~30km west of Sydney — nine phases across 8.3ha; 132kV on-site substation; PUE 1.15 design. Land acquired Nov 2021 (~A$110M); DA filed; billed as APAC's largest single campus (ex-China) at announcement.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | AirTrunk SYD3 (Western Sydney) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | AirTrunk SYD3 (Western Sydney) | Newest capital evidence is 2024-01-01 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | AirTrunk SYD3 (Western Sydney) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | AirTrunk SYD3 (Western Sydney) | Newest infrastructure evidence is 2024-01-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | AirTrunk SYD3 (Western Sydney) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | AirTrunk SYD3 (Western Sydney) | Newest regulatory evidence is 2024-01-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | AirTrunk SYD3 (Western Sydney) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | AirTrunk SYD3 (Western Sydney) | Newest schedule evidence is 2024-01-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| AirTrunk | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
AirTrunk · Jan 1, 2024 · backs: status
https://airtrunk.com/airtrunk-expands-western-sydney-region-with-new-syd3-hyperscale-data-centre-asia-pacifics-largest/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· AirTrunk · relevance 0.95