Compute Institute
Ratings for the physical buildout of AI
Khazna QAJ1 Ajman AI Data Center

Khazna QAJ1 Ajman AI Data Center

Construction
Confirmed

Jurisdiction: United Arab Emirates

Al Amerah area, Ajman, UAE; coordinates approximate to district, exact parcel not published in cited sources

Capacity
100 MW basis: unspecified
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

67.8 /100
67.8/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

85 /100
85/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Khazna QAJ1 Ajman AI Data Center No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Khazna QAJ1 Ajman AI Data Center No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Khazna QAJ1 Ajman AI Data Center No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Khazna QAJ1 Ajman AI Data Center No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2024-10-31).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Commissioning

    Expected
    1 revision

    Commissioning · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
G42
Investor
Khazna Data Centers
Operator
Khazna Data Centers
Owner
MGX
Investor
Silver Lake
Investor
Abu Dhabi Commercial Bank
Lender
First Abu Dhabi Bank
Lender
Laing O'Rourke
Epc Contractor
Etihad Water and Electricity (EtihadWE)
Power Supplier

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Khazna · backs: capacity mw

    https://www.khazna.ae/news/khazna-announces-the-uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership/

  2. DCD · backs: actual date

    https://www.datacenterdynamics.com/en/news/khazna-announces-100mw-ajman-data-center-uae/

  3. Blackridge Research · backs: expected date, status

    https://www.blackridgeresearch.com/project-profiles/ajman-data-center-project-khazna-location-cost-contractors-current-status-latest-updates

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Khazna · relevance 0.30

  2. Khazna · relevance 0.70

  3. DCD · relevance 0.90

  4. The Tech Capital · relevance 0.90

  5. Blackridge Research · relevance 0.70