Jurisdiction: Australia
Eight-storey, 34,000 sqm Sydney facility — A$1B investment, 80MW/10,800 racks; phase 1 opened Aug 2022, phase 2 (built by Multiplex) completed Jun 2023. Uptime Tier IV design (Greenbox Architects).
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | staleness decay | +10 | NEXTDC S3 (Sydney) | Newest capital evidence is 2023-06-01 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | NEXTDC S3 (Sydney) | Newest regulatory evidence is 2023-06-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | NEXTDC S3 (Sydney) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | NEXTDC S3 (Sydney) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2023-06-01 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | NEXTDC S3 (Sydney) | Newest infrastructure evidence is 2023-06-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | NEXTDC S3 (Sydney) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | NEXTDC S3 (Sydney) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2023-06-01). |
| Schedule | staleness decay | -25 | NEXTDC S3 (Sydney) | Newest schedule evidence is 2023-06-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Commissioning · Actual:
No active constraint observations recorded against this project.
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
NEXTDC · backs: capacity mw
https://www.nextdc.com/data-centres/sydney-data-centres/s3-sydney
Data Center Dynamics · Jun 1, 2023 · backs: actual date, status
https://www.datacenterdynamics.com/en/news/nextdcs-completes-s3-data-center-expansion-in-sydney/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Multiplex · relevance 0.90
· Data Center Dynamics · relevance 0.90
· NEXTDC · relevance 0.90
NEXTDC · relevance 0.30