Jurisdiction: US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO)
1275 North Community Circle, Eagle Mountain (Utah County) — 488 acres, ~4.5M sq ft, 28 data halls across phases (~300MW design scope per the GC); first DC operational 2021; 2022 mega-expansion (+2M sq ft, ~$1.5B); Rocky Mountain Power + Faraday Solar (Utah's largest, operational Nov 2025, 20yr PPA).
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Meta Eagle Mountain Campus | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Meta Eagle Mountain Campus | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | Meta Eagle Mountain Campus | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Eagle Mountain Campus | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Groundbreaking | Milestone "Groundbreaking" achieved on/ahead of its first announced date (2018-01-01). |
| Schedule | staleness decay | -25 | Meta Eagle Mountain Campus | Newest schedule evidence is 2018-01-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Groundbreaking · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta | — | — | |
| Mortenson | — | — | |
| Rocky Mountain Power | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Mortenson · backs: actual date, status
https://www.mortenson.com/projects/eagle-mountain-data-center
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Daily Herald · relevance 0.90
Mortenson · relevance 0.70