Confirmed

Jurisdiction: US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO)

1275 North Community Circle, Eagle Mountain (Utah County) — 488 acres, ~4.5M sq ft, 28 data halls across phases (~300MW design scope per the GC); first DC operational 2021; 2022 mega-expansion (+2M sq ft, ~$1.5B); Rocky Mountain Power + Faraday Solar (Utah's largest, operational Nov 2025, 20yr PPA).

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

61.5 /100
61.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Meta Eagle Mountain Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Meta Eagle Mountain Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Meta Eagle Mountain Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Meta Eagle Mountain Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2018-01-01).
Schedule staleness decay -25 Meta Eagle Mountain Campus Newest schedule evidence is 2018-01-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Meta
Owner
Mortenson
General Contractor
Rocky Mountain Power
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Mortenson · backs: actual date, status

    https://www.mortenson.com/projects/eagle-mountain-data-center

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Daily Herald · relevance 0.90

  2. Mortenson · relevance 0.70