Jurisdiction: US — Rest of US (composite)
Franklin Farm mega-site near Holly Ridge/Rayville, Richland Parish, Louisiana (coordinates approximate)
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Meta Hyperion (Richland Parish) | Capital base before committed-capital evidence (announcement-only anchor region, §B.2.4). |
| Capital | capital commitment | +32.14 | PIMCO (lender) | lender role committed $18,000,000,000 (coverage 104% of $27,000,000,000 capex). |
| Capital | capital commitment | +12.5 | Blue Owl Capital (investor) | investor role committed $7,000,000,000 (coverage 104% of $27,000,000,000 capex). |
| Capital | capital commitment | +5.36 | BlackRock (lender) | lender role committed $3,000,000,000 (coverage 104% of $27,000,000,000 capex). |
| Infrastructure | baseline | 70 | Meta Hyperion (Richland Parish) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | Meta Hyperion (Richland Parish) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Hyperion (Richland Parish) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2024-12-01). |
Announcement · Actual:
Energization · Expected:
Commissioning · Expected:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Blue Owl Capital | 80% | $7.0B | |
| Meta | 20% | — | |
| Meta | — | — | |
| Meta | — | — | |
| Entergy Louisiana | — | — | |
| Entergy Louisiana | — | — | |
| PIMCO | — | $18.0B | |
| BlackRock | — | $3.0B | |
| Morgan Stanley | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Meta Data Centers · backs: actual date, capacity mw
https://datacenters.atmeta.com/richland-parish-data-center/
About Meta · Dec 1, 2025 · backs: status
https://about.fb.com/news/2025/12/metas-richland-parish-data-center-supports-louisiana-economy-875-million-in-contracts/
The Lens NOLA · Mar 30, 2026 · backs: expected date
https://thelensnola.org/2026/03/30/meta-triples-order-of-gas-fired-power-plants-for-its-ai-campus-in-louisiana/
Fox8 · May 12, 2026 · backs: expected date
https://www.fox8live.com/2026/05/12/metas-27-billion-ai-data-center-is-transforming-rural-louisiana/
ENR · backs: capex usd
https://www.enr.com/articles/62766-27b-meta-data-center-pushes-louisiana-toward-massive-power-expansion
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· About Meta · relevance 0.85
· Meta Investor Relations · relevance 0.85
· Global Data Center Hub · relevance 0.70
· Entergy · relevance 0.90
Meta Data Centers · relevance 0.70
ENR · relevance 0.85
Bloomberg · relevance 0.85