Compute Institute
Ratings for the physical buildout of AI
Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses

Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses

Planned
Probable

Jurisdiction: US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission)

Interconnected multi-campus development spanning Caddo and Bossier Parishes (Shreveport-Bossier area), northwest Louisiana. STACK Infrastructure develops/owns; Amazon is the $12B hyperscale customer; SWEPCO territory.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

58.5 /100
58.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2026-02-23).
Schedule staleness decay -25 Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses Newest schedule evidence is 2026-02-23 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
STACK Infrastructure
Developer
Amazon
Anchor Tenant
Southwestern Electric Power Company
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Louisiana Economic Development · Feb 23, 2026 · backs: actual date, status

    https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Louisiana Economic Development · relevance 0.90

  2. · About Amazon · relevance 0.70