Jurisdiction: US — Rest of US (composite)
Methodology prs-v0.1 · computed · trigger: event driven
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Comanche Circle | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | baseline | 70 | Comanche Circle | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | baseline | 70 | Comanche Circle | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Comanche Circle | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
No entity roles recorded for this project.
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Salon · Jun 6, 2026 · backs: capacity mw, status
https://www.salon.com/2026/06/06/officials-powerless-to-stop-8-new-data-centers-that-could-transform-small-texas-county-partner/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Salon · relevance 0.70
· The Texas Tribune · relevance 0.75