Jurisdiction: US — Arizona (APS/SRP)
Eastmark community, Mesa, Arizona. 5-building campus, >2.5M sq ft; operational Jan 2025.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | baseline | 70 | Meta Mesa Data Center | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Capital | baseline | 40 | Meta Mesa Data Center | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Meta Mesa Data Center | Newest capital evidence is 2025-02-11 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | interconnection progress | +15 | Energization | Power/interconnection milestone "Energization" achieved on 2025-01-30 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | Meta Mesa Data Center | Newest infrastructure evidence is 2025-01-30 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Meta Mesa Data Center | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Meta Mesa Data Center | Newest regulatory evidence is 2025-02-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Meta Mesa Data Center | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2021-08-01). |
| Schedule | milestone achieved | +5 | Energization | Milestone "Energization" achieved on/ahead of its first announced date (2025-01-30). |
| Schedule | staleness decay | -25 | Meta Mesa Data Center | Newest schedule evidence is 2025-01-30 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Energization · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta | — | — | |
| DPR Construction | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
AZ Big Media · May 6, 2022 · backs: actual date
https://azbigmedia.com/business/meta-mesa-data-center-will-expand-to-more-than-2-5m-sf/
AZ Big Media · Feb 11, 2025 · backs: actual date, status
https://azbigmedia.com/real-estate/commercial-real-estate/meta-announces-mesa-data-center-is-operational/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· AZ Big Media
· AZ Big Media
· AZ Big Media