Compute Institute
Ratings for the physical buildout of AI
Crusoe Callaway County Missouri data center

Crusoe Callaway County Missouri data center

Announced
Rumored

Jurisdiction: US — Rest of US (composite)

Capacity
1,800 MW basis: unspecified
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

60.5 /100
60.5/100

Methodology prs-v0.1 · computed · trigger: event driven

Schedule

80 /100
80/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Crusoe Callaway County Missouri data center No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory baseline 70 Crusoe Callaway County Missouri data center No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Infrastructure baseline 70 Crusoe Callaway County Missouri data center No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Crusoe Callaway County Missouri data center No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

No entity roles recorded for this project.

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Data Center Dynamics · Jun 18, 2026 · backs: capacity mw, status

    https://www.datacenterdynamics.com/en/news/crusoe-could-build-14-acre-data-center-in-unincorporated-missouri-land/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Data Center Dynamics · relevance 0.85