Jurisdiction: US — Virginia (PJM/Dominion)
6110 Technology Creek Drive, White Oak Technology Park, Henrico County — 66 acres directly across Technology Boulevard from QTS's RIC4 site; four buildings planned, >1M sq ft, >200MW campus at full build; RCH-1 (360,000 sq ft / 48MW) first, 18MW by 2027, remainder ~2030. NEW record 2026-07-06 — the project the QTS-RIC4 correction disentangled (Clark's actual Henrico project).
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | Newest capital evidence is 2025-05-21 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | Newest regulatory evidence is 2025-05-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | Newest infrastructure evidence is 2025-05-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-02-18). |
| Schedule | staleness decay | -25 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | Newest schedule evidence is 2025-02-18 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Iron Mountain | — | — | |
| Clark Construction | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Data Center Frontier · Mar 5, 2025 · backs: actual date
https://www.datacenterfrontier.com/site-selection/article/55269118/amid-shifting-regional-data-center-policies-iron-mountain-and-dc-blox-both-expand-in-virginias-henrico-county
Data Center Dynamics · May 21, 2025 · backs: status
https://www.datacenterdynamics.com/en/news/iron-mountain-starts-work-on-data-center-campus-near-richmond-virginia/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Richmond BizSense · relevance 0.90
· Data Center Dynamics · relevance 0.90
· Data Center Frontier · relevance 0.75
· Data Center Dynamics · relevance 0.95
www.businesswire.com · relevance 0.90