194 tracked projects representing
117,627 MW of announced or built capacity across
29 jurisdictions.
194 carry a current 0–100 delivery health score (higher is healthier),
scored across schedule, regulatory, infrastructure, and capital risk — every factor cites its source.
Insights
Wisconsin and Georgia builds are tracking cleanly toward delivery (80+), while three projects—Calvert Cliffs, College Station, and Prince William—have collapsed to critical (10), signaling permitting or infrastructure deadlock. The real risk: Meta's Altoona and Prometheus both dropped 14+ points recently, suggesting mid-construction problems are emerging across the portfolio.
AI-generated · updated 19 hours ago
Status
All statuses Announced Planned Permitting Permitted Construction Energized Commissioned Operating Stalled Cancelled
Jurisdiction
All jurisdictions Argentina Australia France Germany Ireland Japan Malaysia — Johor (Johor-Singapore SEZ) Netherlands Singapore South Korea United Arab Emirates United Kingdom US — Arizona (APS/SRP) US — Georgia (Southern/Georgia Power) US — Indiana (MISO) US — Iowa (MISO) US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) US — Minnesota (Xcel / MISO) US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) US — North Carolina (Duke Energy) US — Ohio (AEP Ohio / PJM) US — Pennsylvania (PJM) US — Rest of US (composite) US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) US — Texas (ERCOT) US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) US — Virginia (PJM/Dominion) US — Wisconsin (MISO)
Health score
All scores 80-100 60-79 40-59 0-39
Clear filters