Jurisdiction: US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO)
~900 acres, Gallatin (Sumner County) — up to 12 data halls / ~1.5M sq ft; launched Nov 2024; drawing up to ~300MW; Sep 2025 planning permission added a 135,000 sq ft rapid-deployment ('tent') structure paired with off-grid gas (Williams Socrates, 400MW behind-the-meter).
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | staleness decay | +10 | Meta Gallatin Data Center | Newest capital evidence is 2024-11-01 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | Meta Gallatin Data Center | Newest regulatory evidence is 2024-11-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | Meta Gallatin Data Center | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Meta Gallatin Data Center | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2024-11-01 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | Meta Gallatin Data Center | Newest infrastructure evidence is 2024-11-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Meta Gallatin Data Center | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Gallatin Data Center | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2024-11-01). |
| Schedule | staleness decay | -25 | Meta Gallatin Data Center | Newest schedule evidence is 2024-11-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Commissioning · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta | — | — | |
| DPR Construction | — | — | |
| Tennessee Valley Authority | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Meta Data Centers · Nov 1, 2024 · backs: actual date, status
https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics · relevance 0.85
· Meta Data Centers · relevance 0.90
WPLN News · relevance 0.40