Compute Institute
Ratings for the physical buildout of AI
PowerHouse 95 (Spotsylvania)

PowerHouse 95 (Spotsylvania)

Construction
Confirmed

Jurisdiction: US — Virginia (PJM/Dominion)

145 acres, Spotsylvania County (~60mi south of Ashburn, I-95 corridor) — first major hyperscale campus in the county: up to eight 3-story buildings / 3.5M sq ft; three 300MW substations (800MW campus); groundbroke Jul 2024, first 150MW target Oct 2025. AREP/Harrison Street JV.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

53.5 /100
53.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 PowerHouse 95 (Spotsylvania) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 PowerHouse 95 (Spotsylvania) Newest capital evidence is 2024-07-01 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory staleness decay -20 PowerHouse 95 (Spotsylvania) Newest regulatory evidence is 2024-07-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 PowerHouse 95 (Spotsylvania) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 PowerHouse 95 (Spotsylvania) Newest infrastructure evidence is 2024-07-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 PowerHouse 95 (Spotsylvania) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 PowerHouse 95 (Spotsylvania) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2024-07-01).
Schedule staleness decay -25 PowerHouse 95 (Spotsylvania) Newest schedule evidence is 2024-07-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
PowerHouse Data Centers
Developer
Harrison Street
Investor

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. PowerHouse Data Centers · Jul 1, 2024 · backs: actual date, status

    https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · PowerHouse Data Centers · relevance 0.95

  2. · PRNewswire · relevance 0.95