Jurisdiction: US — Virginia (PJM/Dominion)
145 acres, Spotsylvania County (~60mi south of Ashburn, I-95 corridor) — first major hyperscale campus in the county: up to eight 3-story buildings / 3.5M sq ft; three 300MW substations (800MW campus); groundbroke Jul 2024, first 150MW target Oct 2025. AREP/Harrison Street JV.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | PowerHouse 95 (Spotsylvania) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | PowerHouse 95 (Spotsylvania) | Newest capital evidence is 2024-07-01 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | PowerHouse 95 (Spotsylvania) | Newest regulatory evidence is 2024-07-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | PowerHouse 95 (Spotsylvania) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | PowerHouse 95 (Spotsylvania) | Newest infrastructure evidence is 2024-07-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | PowerHouse 95 (Spotsylvania) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | PowerHouse 95 (Spotsylvania) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Groundbreaking | Milestone "Groundbreaking" achieved on/ahead of its first announced date (2024-07-01). |
| Schedule | staleness decay | -25 | PowerHouse 95 (Spotsylvania) | Newest schedule evidence is 2024-07-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Groundbreaking · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| PowerHouse Data Centers | — | — | |
| Harrison Street | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
PowerHouse Data Centers · Jul 1, 2024 · backs: actual date, status
https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· PowerHouse Data Centers · relevance 0.95
· PRNewswire · relevance 0.95