Jurisdiction: Malaysia — Johor (Johor-Singapore SEZ)
Kulai, Johor — Malaysia's first solar-powered integrated DC park (500MW campus design; 500MW on-site solar + 600MW grid backup). First 72MW building (anchor: Sea Ltd per launch reporting); Nvidia GB200 AI cloud commissioned Oct 2025; GDS/DayOne runs 168MW across 8 buildings within the park.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | baseline | 70 | YTL Green Data Center Park (Kulai) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Capital | baseline | 40 | YTL Green Data Center Park (Kulai) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2025-10-01 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | YTL Green Data Center Park (Kulai) | Newest infrastructure evidence is 2025-10-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | YTL Green Data Center Park (Kulai) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | YTL Green Data Center Park (Kulai) | Newest regulatory evidence is 2025-11-03 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | YTL Green Data Center Park (Kulai) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2022-04-21). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2025-10-01). |
| Schedule | staleness decay | -25 | YTL Green Data Center Park (Kulai) | Newest schedule evidence is 2025-10-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Commissioning · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| YTL Power International | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
YTL Power · Apr 21, 2022 · backs: actual date, capacity mw
https://www.ytl.com/press-releases/ytl-green-data-center-park-launches-in-johor-the-first-integrated-data-center-park-powered-by-renewable-solar-energy-in-malaysia-2/
W.Media · Nov 3, 2025 · backs: actual date, status
https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· The Star · relevance 0.70
· W.Media · relevance 0.90
· Free Malaysia Today · relevance 0.90
· YTL Power · relevance 0.85