Jurisdiction: US — Indiana (MISO)
Pittsboro, Hendricks County, Indiana; ~285 acres of a 626-acre site. Colocation, 3 buildings (256+96+48MW). Rezoning approved Mar 2025 (lawsuit pending).
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | baseline | 70 | Vantage Pittsboro Campus | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Capital | staleness decay | +10 | Vantage Pittsboro Campus | Newest capital evidence is 2025-03-19 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | staleness decay | -20 | Vantage Pittsboro Campus | Newest infrastructure evidence is 2025-03-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | Vantage Pittsboro Campus | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | baseline | 70 | Vantage Pittsboro Campus | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | permit granted | +6 | Utility Approval | Permitting milestone "Utility Approval" achieved on 2025-03-19. |
| Regulatory | staleness decay | -25 | Vantage Pittsboro Campus | Newest regulatory evidence is 2025-03-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Vantage Pittsboro Campus | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-02-07). |
| Schedule | milestone achieved | +5 | Utility Approval | Milestone "Utility Approval" achieved on/ahead of its first announced date (2025-03-19). |
| Schedule | staleness decay | -25 | Vantage Pittsboro Campus | Newest schedule evidence is 2025-03-19 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Utility approval · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Vantage Data Centers | — | — | |
| Hendricks Power Cooperative | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
IBJ · Feb 7, 2025 · backs: actual date
https://www.ibj.com/articles/data-center-developer-eyeing-hendricks-county-site
IBJ · Mar 19, 2025 · backs: actual date, status
https://www.ibj.com/articles/pittsboro-officials-approve-rezoning-for-proposed-data-center
IBJ · Feb 25, 2025 · backs: capacity mw
https://www.ibj.com/articles/pittsboro-plan-commission-supports-data-center-rezoning-request
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· IBJ
· IBJ
· IBJ