Compute Institute
Ratings for the physical buildout of AI
Vantage Pittsboro Campus

Vantage Pittsboro Campus

Permitted
Confirmed

Jurisdiction: US — Indiana (MISO)

Pittsboro, Hendricks County, Indiana; ~285 acres of a 626-acre site. Colocation, 3 buildings (256+96+48MW). Rezoning approved Mar 2025 (lawsuit pending).

Capacity
400 MW basis: facility total
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

53.2 /100
53.2/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

65 /100
65/100

Regulatory

51 /100
51/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Infrastructure baseline 70 Vantage Pittsboro Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Capital staleness decay +10 Vantage Pittsboro Campus Newest capital evidence is 2025-03-19 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure staleness decay -20 Vantage Pittsboro Campus Newest infrastructure evidence is 2025-03-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Capital baseline 40 Vantage Pittsboro Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory baseline 70 Vantage Pittsboro Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory permit granted +6 Utility Approval Permitting milestone "Utility Approval" achieved on 2025-03-19.
Regulatory staleness decay -25 Vantage Pittsboro Campus Newest regulatory evidence is 2025-03-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Vantage Pittsboro Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-02-07).
Schedule milestone achieved +5 Utility Approval Milestone "Utility Approval" achieved on/ahead of its first announced date (2025-03-19).
Schedule staleness decay -25 Vantage Pittsboro Campus Newest schedule evidence is 2025-03-19 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Utility Approval

    Achieved

    Utility approval · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Vantage Data Centers
Developer
Hendricks Power Cooperative
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. IBJ · Feb 7, 2025 · backs: actual date

    https://www.ibj.com/articles/data-center-developer-eyeing-hendricks-county-site

  2. IBJ · Mar 19, 2025 · backs: actual date, status

    https://www.ibj.com/articles/pittsboro-officials-approve-rezoning-for-proposed-data-center

  3. IBJ · Feb 25, 2025 · backs: capacity mw

    https://www.ibj.com/articles/pittsboro-plan-commission-supports-data-center-rezoning-request

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · IBJ

  2. · IBJ

  3. · IBJ