Compute Institute
Ratings for the physical buildout of AI
Amazon / AWS Falls Township Data Center (Keystone Trade Center)

Amazon / AWS Falls Township Data Center (Keystone Trade Center)

Construction
Confirmed

Jurisdiction: US — Pennsylvania (PJM)

Keystone Trade Center (former US Steel Fairless Works, ~1,800 acres), Falls Township / Levittown, Bucks County. NorthPoint Development site; Building 6 at 1 Ben Fairless Drive converts to a data center; 700 S. Port Road considered for phase two.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

59 /100
59/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Amazon / AWS Falls Township Data Center (Keystone Trade Center) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Amazon / AWS Falls Township Data Center (Keystone Trade Center) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Amazon / AWS Falls Township Data Center (Keystone Trade Center) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Amazon / AWS Falls Township Data Center (Keystone Trade Center) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-06-09).
Schedule staleness decay -25 Amazon / AWS Falls Township Data Center (Keystone Trade Center) Newest schedule evidence is 2025-06-09 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Amazon
Owner
NorthPoint Development
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Falls Township (official) · backs: actual date

    https://www.fallstwp.com/resources/news/article/?id=10070

  2. Bucks County Beacon · May 1, 2026 · backs: status

    https://buckscountybeacon.com/2026/05/falls-township-residents-say-they-were-left-in-the-dark-throughout-data-center-planning-process/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Bucks County Beacon

  2. Falls Township (official)