Jurisdiction: US — Rest of US (composite)
1500 Beech Road, New Albany, Licking County, Ohio (coordinates approximate); on-site natural gas generation by Williams Companies plus nuclear supply agreements
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Meta Prometheus (New Albany) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Meta Prometheus (New Albany) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | Meta Prometheus (New Albany) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Prometheus (New Albany) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-07-01). |
| Schedule | milestone slippage | -40 | Energization | Milestone "Energization" slipped 8 month(s): first announced expectation 2026-01-01 (revision history, 2 revision(s)) vs current 2026-09-30. |
Announcement · Actual:
Energization · Expected:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta | 100% | — | |
| Meta | — | — | |
| Meta | — | — | |
| Williams Companies | — | — | |
| Williams Companies | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Broadband Breakfast · Jan 9, 2026 · backs: actual date
https://broadbandbreakfast.com/big-tech-data-centers-metas-massive-nuclear-power-deals-20b-by-xai-in-mississippi/
MLQ · backs: expected date
https://mlq.ai/news/meta-deploys-tent-based-data-centers-in-ohio-and-tennessee-backed-by-400mw-of-off-grid-gas-power/
NBC4 WCMH · backs: capacity mw
https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/
DC Pulse · backs: capex usd, status
https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Broadband Breakfast · relevance 0.70
· Power Engineering · relevance 0.70
Data Center Frontier · relevance 0.70
NBC4 WCMH · relevance 0.90
DC Pulse · relevance 0.90