Ratings for the physical buildout of AI
AI Data Center Projects
156 tracked projects representing
115,101 MW of announced or built capacity across
23 jurisdictions.
156 carry a current 0–100 delivery health score (higher is healthier),
scored across schedule, regulatory, infrastructure, and capital risk — every factor cites its source.
Insights
Five mega-builds (xAI Memphis, Stargate Wisconsin, AWS Lake Anna, Meta Hyperion, Fermi Matador) are tracking healthy at 80–82 PRS and gaining momentum, while two critical projects—Prince William and Project Aggie—have collapsed to 10 PRS, signaling severe permitting or infrastructure blockers that will delay delivery by quarters. The delivery takeaway: regulatory and utility readiness, not construction speed, now gates the timeline.
AI-generated · updated 2 hours ago
Status
All statuses Announced Planned Permitting Permitted Construction Energized Commissioned Operating Stalled Cancelled
Jurisdiction
All jurisdictions Argentina Australia France Germany Japan Malaysia — Johor (Johor-Singapore SEZ) Netherlands Singapore South Korea United Arab Emirates United Kingdom US — Arizona (APS/SRP) US — Georgia (Southern/Georgia Power) US — Indiana (MISO) US — Iowa (MISO) US — Minnesota (Xcel / MISO) US — North Carolina (Duke Energy) US — Ohio (AEP Ohio / PJM) US — Pennsylvania (PJM) US — Rest of US (composite) US — Texas (ERCOT) US — Virginia (PJM/Dominion) US — Wisconsin (MISO)
Health score
All scores 80-100 60-79 40-59 0-39
Clear filters
2 projects