Jurisdiction: US — Georgia (Southern/Georgia Power)
Douglas County, Georgia (Atlanta West). 120MW initial + 80MW expansion.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | DC BLOX Atlanta West | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | staleness decay | -20 | DC BLOX Atlanta West | Newest regulatory evidence is 2025-08-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | DC BLOX Atlanta West | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | DC BLOX Atlanta West | Newest infrastructure evidence is 2025-08-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | DC BLOX Atlanta West | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | DC BLOX Atlanta West | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-08-11). |
| Schedule | staleness decay | -25 | DC BLOX Atlanta West | Newest schedule evidence is 2025-08-11 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Energization · Expected:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| DC BLOX | — | — | |
| ING Capital LLC | — | — | |
| Mizuho Bank, Ltd | — | — | |
| Natixis Corporate & Investment Banking | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
DC BLOX · Aug 11, 2025 · backs: actual date, capacity mw, expected date, status
https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· DC BLOX