Jurisdiction: US — Texas (ERCOT)
Approximately 1,785-acre site in Cameron County, Texas, near (east of) Valley International Airport, in the Harlingen area of the Rio Grande Valley.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | baseline | 70 | Eneus Energy Cameron County data center | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Capital | baseline | 40 | Eneus Energy Cameron County data center | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | baseline | 70 | Eneus Energy Cameron County data center | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | permit granted | +6 | Utility Approval | Permitting milestone "Utility Approval" achieved on 2025-10-01. |
| Schedule | baseline | 80 | Eneus Energy Cameron County data center | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-07-01). |
| Schedule | milestone achieved | +5 | Utility Approval | Milestone "Utility Approval" achieved on/ahead of its first announced date (2025-10-01). |
| Schedule | staleness decay | -25 | Eneus Energy Cameron County data center | Newest schedule evidence is 2025-10-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Utility approval · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Eneus Energy | — | — | |
| RGV Property Group | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Eneus Energy · backs: capacity mw, capex usd, status
https://eneusenergy.com/harlingen
Data Center Dynamics · Feb 5, 2026 · backs: actual date
https://www.datacenterdynamics.com/en/news/2gw-data-center-could-be-developed-in-cameron-county-texas/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Hoodline
· Data Center Dynamics
Eneus Energy