Jurisdiction: Singapore
Jalan Tukang (near the Tanjong Kling DC park) — nine stories, 20MW, $260M initial; Q1 2027 target; one of four DC-CFA1 winners after Singapore's 2019-2022 moratorium (80MW pool: Equinix, GDS, Microsoft, AirTrunk+ByteDance consortium); liquid cooling for AI density.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Equinix SG6 (Singapore) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Equinix SG6 (Singapore) | Newest capital evidence is 2024-11-19 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Equinix SG6 (Singapore) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Equinix SG6 (Singapore) | Newest infrastructure evidence is 2024-11-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Equinix SG6 (Singapore) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Equinix SG6 (Singapore) | Newest regulatory evidence is 2024-11-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Equinix SG6 (Singapore) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | Equinix SG6 (Singapore) | Newest schedule evidence is 2024-11-19 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Equinix | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Singapore EDB · Nov 19, 2024 · backs: status
https://www.edb.gov.sg/en/about-edb/media-releases-publications/equinix-advances-ai-with-high-performance-data-center-in-singapore.html
Equinix, Inc. · Nov 19, 2024 · backs: capacity mw
https://www.prnewswire.com/news-releases/equinix-to-help-accelerate-ai-innovation-in-singapore-with-us260-million-data-center-expansion-302309285.html
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Singapore EDB · relevance 0.75
· Equinix, Inc. · relevance 0.85
· IMDA · relevance 0.70
· Data Center Dynamics · relevance 0.85