Compute Institute
Ratings for the physical buildout of AI
Equinix SG6 (Singapore)

Equinix SG6 (Singapore)

Construction
Confirmed

Jurisdiction: Singapore

Jalan Tukang (near the Tanjong Kling DC park) — nine stories, 20MW, $260M initial; Q1 2027 target; one of four DC-CFA1 winners after Singapore's 2019-2022 moratorium (80MW pool: Equinix, GDS, Microsoft, AirTrunk+ByteDance consortium); liquid cooling for AI density.

Capacity
20 MW basis: unspecified
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

51.8 /100
51.8/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

55 /100
55/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Equinix SG6 (Singapore) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 Equinix SG6 (Singapore) Newest capital evidence is 2024-11-19 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Equinix SG6 (Singapore) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Equinix SG6 (Singapore) Newest infrastructure evidence is 2024-11-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Equinix SG6 (Singapore) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 Equinix SG6 (Singapore) Newest regulatory evidence is 2024-11-19 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Equinix SG6 (Singapore) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule staleness decay -25 Equinix SG6 (Singapore) Newest schedule evidence is 2024-11-19 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Equinix
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Singapore EDB · Nov 19, 2024 · backs: status

    https://www.edb.gov.sg/en/about-edb/media-releases-publications/equinix-advances-ai-with-high-performance-data-center-in-singapore.html

  2. Equinix, Inc. · Nov 19, 2024 · backs: capacity mw

    https://www.prnewswire.com/news-releases/equinix-to-help-accelerate-ai-innovation-in-singapore-with-us260-million-data-center-expansion-302309285.html

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Singapore EDB · relevance 0.75

  2. · Equinix, Inc. · relevance 0.85

  3. · IMDA · relevance 0.70

  4. · Data Center Dynamics · relevance 0.85