Compute Institute
Ratings for the physical buildout of AI
Hut 8 River Bend Data Center Campus

Hut 8 River Bend Data Center Campus

Construction
Confirmed

Jurisdiction: US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission)

West Feliciana Parish (near St. Francisville), southeast Louisiana. 330MW initial Entergy utility capacity with potential +1,000MW; 245MW IT leased for 15 years ($7.0B contract) with a Google financial backstop; Jacobs as EPCM.

Capacity
245 MW basis: it load
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

59 /100
59/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Hut 8 River Bend Data Center Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Hut 8 River Bend Data Center Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Hut 8 River Bend Data Center Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Hut 8 River Bend Data Center Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-12-17).
Schedule staleness decay -25 Hut 8 River Bend Data Center Campus Newest schedule evidence is 2025-12-17 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Google
Investor
Entergy Louisiana
Utility Provider
Hut 8
Developer
Jacobs
Epc Contractor

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Louisiana Economic Development · Dec 17, 2025 · backs: actual date, status

    https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center

  2. PRNewswire · Dec 17, 2025 · backs: capacity mw

    https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Jacobs · relevance 0.85

  2. · Construction Dive · relevance 0.90

  3. · Louisiana Economic Development · relevance 0.95

  4. · PRNewswire · relevance 0.90