Jurisdiction: US — Texas (ERCOT)
Sulphur Springs, Hopkins County, Texas; 1,677 acres of industrial land (per MSB press kit). Exact coordinates not stated in sources, left null. (Distance-from-Dallas claim not confirmed by sources on re-fetch and removed.)
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | MSB Global Services Matrix Data Center Campus | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | MSB Global Services Matrix Data Center Campus | Newest capital evidence is 2025-06-13 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | MSB Global Services Matrix Data Center Campus | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | MSB Global Services Matrix Data Center Campus | Newest infrastructure evidence is 2025-06-13 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | MSB Global Services Matrix Data Center Campus | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | MSB Global Services Matrix Data Center Campus | Newest regulatory evidence is 2025-06-13 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | MSB Global Services Matrix Data Center Campus | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-06-13). |
| Schedule | milestone achieved | +5 | Groundbreaking | Milestone "Groundbreaking" achieved on/ahead of its first announced date (2025-02-01). |
| Schedule | staleness decay | -25 | MSB Global Services Matrix Data Center Campus | Newest schedule evidence is 2025-06-13 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Groundbreaking · Actual:
Announcement · Actual:
Commissioning · Expected:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| MSB Global Services, LLC | — | — | |
| City of Sulphur Springs | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
MSB Global Services · Jun 13, 2025 · backs: actual date, expected date, status
https://msbglobalservices.com/matrix-data-center-campus-breaks-ground-in-sulphur-springs-tx-a-new-era-for-net-zero-ai-infrastructure/
MSB Global Services · backs: capacity mw
https://msbglobalservices.com/sulphur-springs/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· KLTV (Gray Media)
· MSB Global Services
MSB Global Services