Compute Institute
Ratings for the physical buildout of AI
MSB Global Services Matrix Data Center Campus

MSB Global Services Matrix Data Center Campus

Construction
Confirmed

Jurisdiction: US — Texas (ERCOT)

Sulphur Springs, Hopkins County, Texas; 1,677 acres of industrial land (per MSB press kit). Exact coordinates not stated in sources, left null. (Distance-from-Dallas claim not confirmed by sources on re-fetch and removed.)

Capacity
3,000 MW basis: unspecified
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

55.3 /100
55.3/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

65 /100
65/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 MSB Global Services Matrix Data Center Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Capital staleness decay +10 MSB Global Services Matrix Data Center Campus Newest capital evidence is 2025-06-13 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 MSB Global Services Matrix Data Center Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 MSB Global Services Matrix Data Center Campus Newest infrastructure evidence is 2025-06-13 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 MSB Global Services Matrix Data Center Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 MSB Global Services Matrix Data Center Campus Newest regulatory evidence is 2025-06-13 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 MSB Global Services Matrix Data Center Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-06-13).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2025-02-01).
Schedule staleness decay -25 MSB Global Services Matrix Data Center Campus Newest schedule evidence is 2025-06-13 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

  2. Announcement

    Achieved

    Announcement · Actual:

  3. Commissioning

    Expected
    1 revision

    Commissioning · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
MSB Global Services, LLC
Developer
City of Sulphur Springs
Government Partner

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. MSB Global Services · Jun 13, 2025 · backs: actual date, expected date, status

    https://msbglobalservices.com/matrix-data-center-campus-breaks-ground-in-sulphur-springs-tx-a-new-era-for-net-zero-ai-infrastructure/

  2. MSB Global Services · backs: capacity mw

    https://msbglobalservices.com/sulphur-springs/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · KLTV (Gray Media)

  2. · MSB Global Services