DC BLOX Atlanta East (Rockdale County)

Construction
Confirmed

Jurisdiction: US — Georgia (Southern/Georgia Power)

1726 Farmer Road, Conyers, GA (Rockdale County), ~24 miles east of Atlanta. 4 buildings, 747,787 sq ft.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

60.8 /100
60.8/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

65 /100
65/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 DC BLOX Atlanta East (Rockdale County) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 DC BLOX Atlanta East (Rockdale County) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 DC BLOX Atlanta East (Rockdale County) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 DC BLOX Atlanta East (Rockdale County) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2024-11-14).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2024-09-01).
Schedule staleness decay -25 DC BLOX Atlanta East (Rockdale County) Newest schedule evidence is 2024-11-14 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

  2. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
DC BLOX
Developer
Georgia Power
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. DC BLOX · Nov 14, 2024 · backs: actual date

    https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/

  2. DC BLOX · backs: actual date, status

    https://www.dcblox.com/data-centers/rockdale-county-ga-hyperscale-data-center-campus/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · DC BLOX

  2. DC BLOX