Compute Institute
Ratings for the physical buildout of AI
TeraWulf Chesapeake Data Campus (Morgantown)

TeraWulf Chesapeake Data Campus (Morgantown)

Announced
Probable

Jurisdiction: US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM)

Morgantown Generating Station (Potomac River, Charles County, MD) — TeraWulf acquired the grid-connected plant (~210MW operational today, ~250 buildable acres) to develop an AI/HPC campus; ~500MW initial phase target, up to 1GW. FERC approval pending at research date.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

58.5 /100
58.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 TeraWulf Chesapeake Data Campus (Morgantown) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 TeraWulf Chesapeake Data Campus (Morgantown) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 TeraWulf Chesapeake Data Campus (Morgantown) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 TeraWulf Chesapeake Data Campus (Morgantown) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2026-02-02).
Schedule staleness decay -25 TeraWulf Chesapeake Data Campus (Morgantown) Newest schedule evidence is 2026-02-02 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
TeraWulf
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. TeraWulf Inc. · Feb 2, 2026 · backs: actual date, status

    https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · TeraWulf Inc. · relevance 0.70