Jurisdiction: US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM)
Morgantown Generating Station (Potomac River, Charles County, MD) — TeraWulf acquired the grid-connected plant (~210MW operational today, ~250 buildable acres) to develop an AI/HPC campus; ~500MW initial phase target, up to 1GW. FERC approval pending at research date.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | TeraWulf Chesapeake Data Campus (Morgantown) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | TeraWulf Chesapeake Data Campus (Morgantown) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | TeraWulf Chesapeake Data Campus (Morgantown) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | TeraWulf Chesapeake Data Campus (Morgantown) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2026-02-02). |
| Schedule | staleness decay | -25 | TeraWulf Chesapeake Data Campus (Morgantown) | Newest schedule evidence is 2026-02-02 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| TeraWulf | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
TeraWulf Inc. · Feb 2, 2026 · backs: actual date, status
https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· TeraWulf Inc. · relevance 0.70