Jurisdiction: US — Virginia (PJM/Dominion)
~140 acres south of Jefferson Highway (Rt 33), Louisa County Technology Overlay District — AWS's SECOND Louisa campus (the seeded aws-louisa-county / Lake Anna Tech Campus is the first, under construction). Up to 8 buildings + substation; scaled-down refile (Aug 2025) after AWS withdrew a larger 7.2M sq ft proposal.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | AWS Desper Creek Technology Campus (Louisa County) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | AWS Desper Creek Technology Campus (Louisa County) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | AWS Desper Creek Technology Campus (Louisa County) | Newest infrastructure evidence is 2025-09-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | AWS Desper Creek Technology Campus (Louisa County) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | AWS Desper Creek Technology Campus (Louisa County) | Newest regulatory evidence is 2025-09-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | AWS Desper Creek Technology Campus (Louisa County) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | AWS Desper Creek Technology Campus (Louisa County) | Newest schedule evidence is 2025-09-16 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Amazon Web Services | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
U.S. Army Corps of Engineers, Norfolk District · Sep 16, 2025 · backs: status
https://www.nao.usace.army.mil/Media/Public-Notices/Article/4304300/nao-2024-02685-desper-creek-technology-campus-lousia-virginia/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· U.S. Army Corps of Engineers, Norfolk District · relevance 0.70