Nscale AI Campus Loughton (Microsoft anchor / Stargate UK)

Nscale AI Campus Loughton (Microsoft anchor / Stargate UK)

Announced
Probable

Jurisdiction: United Kingdom

Langston Road, Loughton, Essex — 'the UK's largest AI supercomputer': 50MW scalable to 90MW; 23,040 Nvidia GB300 GPUs (Q1 2027 delivery); facility live target Q4 2026; Microsoft anchor commitment under the Stargate UK umbrella (Nscale + OpenAI + Nvidia).

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

47.5 /100
47.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory staleness decay -20 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) Newest regulatory evidence is 2025-09-18 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) Newest infrastructure evidence is 2025-09-18 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-09-18).
Schedule staleness decay -25 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) Newest schedule evidence is 2025-09-18 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Microsoft
Anchor Tenant
Nscale
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Nscale · Sep 18, 2025 · backs: actual date, status

    https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Nscale · relevance 0.70