Jurisdiction: US — Pennsylvania (PJM)
Former Alcoa/Arconic campus, 1,395 acres, Upper Burrell, Westmoreland County (near New Kensington / Pittsburgh). Behind-the-meter on-site generation model; first tenant deployment (TensorWave, 10MW) targeted H1 2026.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | TECfusions Keystone Connect (Upper Burrell) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | TECfusions Keystone Connect (Upper Burrell) | Newest capital evidence is 2025-01-14 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | TECfusions Keystone Connect (Upper Burrell) | Newest regulatory evidence is 2025-01-14 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | TECfusions Keystone Connect (Upper Burrell) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | TECfusions Keystone Connect (Upper Burrell) | Newest infrastructure evidence is 2025-01-14 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | TECfusions Keystone Connect (Upper Burrell) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | TECfusions Keystone Connect (Upper Burrell) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-01-14). |
| Schedule | staleness decay | -25 | TECfusions Keystone Connect (Upper Burrell) | Newest schedule evidence is 2025-01-14 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| TECfusions | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
PRNewswire · Jan 14, 2025 · backs: actual date, status
https://www.prnewswire.com/news-releases/tecfusions-unveils-massive-1400-acre-data-center-project-in-pennsylvania-revitalizing-former-industrial-plant-302350041.html
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· PRNewswire
· PRNewswire