Jurisdiction: Malaysia — Johor (Johor-Singapore SEZ)
Johor Ulu Tiram (land assembled in Mukim of Plentong, 2024: 48ac + 20ac) — Bridge's second Johor hyperscale campus; 400MW TNB Electricity Supply Agreement (Dec 2024, 'Malaysia's fastest ESA delivery' per reporting) incl. CRESS green-energy framework with TNB Renewables.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Bridge Data Centres MY07 (Ulu Tiram) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Bridge Data Centres MY07 (Ulu Tiram) | Newest capital evidence is 2024-11-30 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Bridge Data Centres MY07 (Ulu Tiram) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Bridge Data Centres MY07 (Ulu Tiram) | Newest infrastructure evidence is 2024-11-30 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Bridge Data Centres MY07 (Ulu Tiram) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | permit granted | +6 | Utility Approval | Permitting milestone "Utility Approval" achieved on 2024-12-01. |
| Regulatory | staleness decay | -25 | Bridge Data Centres MY07 (Ulu Tiram) | Newest regulatory evidence is 2024-12-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Bridge Data Centres MY07 (Ulu Tiram) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Utility Approval | Milestone "Utility Approval" achieved on/ahead of its first announced date (2024-12-01). |
| Schedule | staleness decay | -25 | Bridge Data Centres MY07 (Ulu Tiram) | Newest schedule evidence is 2024-12-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Utility approval · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Bridge Data Centres | — | — | |
| Tenaga Nasional Berhad | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
W.Media · Nov 30, 2024 · backs: actual date, status
https://w.media/tnb-and-bridge-data-centres-ink-400mw-power-deal-to-boost-malaysias-digital-hub-status/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics · relevance 0.90
· W.Media · relevance 0.90