Compute Institute
Ratings for the physical buildout of AI
EdgeConneX New Albany Campus

EdgeConneX New Albany Campus

Construction
Confirmed

Jurisdiction: US — Ohio (AEP Ohio / PJM)

9850 Innovation Campus Way, New Albany (Licking County), Ohio; 270 acres from VanTrust; New Albany International Business Park. 1.225M sq ft across several buildings.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

51 /100
51/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 EdgeConneX New Albany Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory staleness decay -20 EdgeConneX New Albany Campus Newest regulatory evidence is 2025-07-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 EdgeConneX New Albany Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 EdgeConneX New Albany Campus Newest infrastructure evidence is 2025-07-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 EdgeConneX New Albany Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 EdgeConneX New Albany Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-07-11).
Schedule staleness decay -25 EdgeConneX New Albany Campus Newest schedule evidence is 2025-07-11 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Commissioning

    Expected
    1 revision

    Commissioning · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
EdgeConneX
Developer
EQT
Investor
PowerConneX
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Data Center Dynamics · Jul 11, 2025 · backs: actual date, expected date, status

    https://www.datacenterdynamics.com/en/news/edgeconnex-files-to-convert-warehouse-and-build-new-700000-sq-ft-data-center-in-new-albany-ohio/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Data Center Dynamics