Jurisdiction: Argentina
ARSAT national data center, Benavidez, Tigre Partido, Buenos Aires Province (Av. Juan D. Peron 7934); coordinates approximate to Benavidez
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | ARSAT Benavidez Data Center Hall IV Expansion | Capital base before committed-capital evidence (announcement-only anchor region, §B.2.4). |
| Capital | capital commitment | +30 | ARSAT (Empresa Argentina de Soluciones Satelitales) (government partner) | government_partner role committed $17,000,000 (capex undisclosed — coverage unverifiable). |
| Infrastructure | baseline | 70 | ARSAT Benavidez Data Center Hall IV Expansion | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | ARSAT Benavidez Data Center Hall IV Expansion | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | ARSAT Benavidez Data Center Hall IV Expansion | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-08-31). |
| Schedule | staleness decay | -25 | ARSAT Benavidez Data Center Hall IV Expansion | Newest schedule evidence is 2025-08-31 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| ARSAT (Empresa Argentina de Soluciones Satelitales) | 100% | $0.0B | |
| ARSAT (Empresa Argentina de Soluciones Satelitales) | — | — | |
| ARSAT (Empresa Argentina de Soluciones Satelitales) | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
DCD · backs: actual date, capacity mw, status
https://www.datacenterdynamics.com/en/news/arsat-plans-multi-million-dollar-expansion-of-buenos-aires-data-center/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
DCD · relevance 0.90