Jurisdiction: Germany
13-hectare brownfield (former 1.3GW Lübbenau coal plant, shut 1996), Lübbenau/Spreewald, Brandenburg. Two phases, up to 100,000 GPUs; STACKIT operates; waste heat to district heating. Groundbreaking Nov 17 2025; Phase 1 (three modules) targeted end-2027.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Schwarz Digits Datacenter Lübbenau | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Schwarz Digits Datacenter Lübbenau | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | Schwarz Digits Datacenter Lübbenau | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Schwarz Digits Datacenter Lübbenau | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Groundbreaking | Milestone "Groundbreaking" achieved on/ahead of its first announced date (2025-11-17). |
| Schedule | staleness decay | -25 | Schwarz Digits Datacenter Lübbenau | Newest schedule evidence is 2025-11-17 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Groundbreaking · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Schwarz Digits | — | — | |
| STACKIT | — | — | |
| Max Bögl | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Wirtschaftsförderung Brandenburg (WFBB) · backs: status
https://www.wfbb.de/aktuelles/newsletter/ansiedlungserfolg-schwarz-gruppe-investiert-11-milliarden-euro
Firmengruppe Max Bögl · backs: actual date
https://max-boegl.de/news/groesster-einzelauftrag-der-firmengeschichte-max-boegl-realisiert-data-center-fuer-schwarz-digits
Schwarz Digits · Nov 17, 2025 · backs: announced date, capacity mw, capex usd, gpu count estimated
https://schwarz-digits.de/presse/archiv/2025/spatenstich-in-luebbenau-schwarz-digits-investiert-11-milliarden-euro-in-europas-digitale-souveraenitaet
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics · relevance 0.90
· Schwarz Digits · relevance 0.90
Wirtschaftsförderung Brandenburg (WFBB) · relevance 0.10
Firmengruppe Max Bögl · relevance 0.70