Jurisdiction: US — Texas (ERCOT)
Pecos County, West Texas; sited within 8,000+ acres. Off-grid/private-grid power generation and data center campus.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | GW Ranch (Pacifico Energy) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | GW Ranch (Pacifico Energy) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | GW Ranch (Pacifico Energy) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | GW Ranch (Pacifico Energy) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-08-21). |
Announcement · Actual:
Groundbreaking · Expected:
Energization · Expected:
Utility approval
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Pacifico Energy | — | — | |
| Texas Commission on Environmental Quality (TCEQ) | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Pacifico Energy · backs: capacity mw, expected date, status
https://www.pacificoenergy.com/gw-ranch
Data Center Dynamics · Aug 21, 2025 · backs: actual date
https://www.datacenterdynamics.com/en/news/pacifico-energy-unveils-5gw-offgrid-natural-gas-project-in-texas-slated-to-serve-a-hyperscale-data-center/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
Pacifico Energy