Compute Institute
Ratings for the physical buildout of AI
Edged Atlanta ATL01 Campus (Tilford Yard)

Edged Atlanta ATL01 Campus (Tilford Yard)

Operating
Confirmed

Jurisdiction: US — Georgia (Southern/Georgia Power)

1800 Thomas Street NW, Atlanta (Tilford Yard, ~80 acres), Fulton County. Three buildings: ATL01-1 (27MW, opened Aug 2024) + ATL01-2 (100MW) operating; ATL01-3 (42MW) topped out, operational early 2027. Waterless ThermalWorks cooling; all three fully leased.

Capacity
168 MW basis: it load
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

58 /100
58/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

60 /100
60/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital staleness decay +10 Edged Atlanta ATL01 Campus (Tilford Yard) Newest capital evidence is 2024-08-22 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory staleness decay -20 Edged Atlanta ATL01 Campus (Tilford Yard) Newest regulatory evidence is 2024-08-22 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Capital baseline 40 Edged Atlanta ATL01 Campus (Tilford Yard) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Edged Atlanta ATL01 Campus (Tilford Yard) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure interconnection progress +15 Commissioning Power/interconnection milestone "Commissioning" achieved on 2024-08-22 — largest single health event (§B.2.3).
Infrastructure staleness decay -25 Edged Atlanta ATL01 Campus (Tilford Yard) Newest infrastructure evidence is 2024-08-22 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Edged Atlanta ATL01 Campus (Tilford Yard) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Edged Atlanta ATL01 Campus (Tilford Yard) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Commissioning Milestone "Commissioning" achieved on/ahead of its first announced date (2024-08-22).
Schedule staleness decay -25 Edged Atlanta ATL01 Campus (Tilford Yard) Newest schedule evidence is 2024-08-22 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Commissioning

    Achieved

    Commissioning · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Georgia Power
Utility Provider
Edged
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. PRNewswire · Aug 22, 2024 · backs: actual date, capacity mw, status

    https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · PRNewswire

  2. Data Center Dynamics