Jurisdiction: US — Arizona (APS/SRP)
Elliot Road Technology Corridor, Mesa, Arizona; 187 acres. Google's first physical presence in AZ.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Google Mesa Data Center | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Google Mesa Data Center | Newest capital evidence is 2023-09-09 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Google Mesa Data Center | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Google Mesa Data Center | Newest infrastructure evidence is 2023-09-09 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Google Mesa Data Center | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Google Mesa Data Center | Newest regulatory evidence is 2023-09-09 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Google Mesa Data Center | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2019-07-07). |
| Schedule | milestone achieved | +5 | Groundbreaking | Milestone "Groundbreaking" achieved on/ahead of its first announced date (2023-09-09). |
| Schedule | staleness decay | -25 | Google Mesa Data Center | Newest schedule evidence is 2023-09-09 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Groundbreaking · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| — | — | ||
| City of Mesa | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
AZ Big Media · Jul 7, 2019 · backs: actual date
https://azbigmedia.com/business/economic-development/mesa-approves-deal-to-bring-1b-google-site-to-city/
AZ Big Media · Sep 9, 2023 · backs: actual date, status
https://azbigmedia.com/business/google-breaks-ground-on-massive-600-million-mesa-data-center/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· AZ Big Media
· AZ Big Media