Ratings for the physical buildout of AI
Amazon Devlin Technology Park (Bristow)

Amazon Devlin Technology Park (Bristow)

Planned
Probable

Jurisdiction: US — Virginia (PJM/Dominion)

~188.5 acres purchased by Amazon (Nov 5 2025, $700M, ~$3.7M/acre — ~70% of the 270-acre Devlin Technology Park) along Devlin Road, Bristow, Prince William County — from Stanley Martin Homes; zoned M-2 for a data center campus + up to three substations (REZ2022-00022); sq-ft cap 3.5M per 2025 reporting (4.2-4.25M in earlier records — flagged). No construction permits yet.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

47 /100
47/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

55 /100
55/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Amazon Devlin Technology Park (Bristow) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Amazon Devlin Technology Park (Bristow) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Amazon Devlin Technology Park (Bristow) Newest infrastructure evidence is 2025-11-04 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Amazon Devlin Technology Park (Bristow) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 Amazon Devlin Technology Park (Bristow) Newest regulatory evidence is 2025-11-04 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Amazon Devlin Technology Park (Bristow) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule staleness decay -25 Amazon Devlin Technology Park (Bristow) Newest schedule evidence is 2025-11-04 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Amazon Data Services
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Data Center Dynamics · Nov 4, 2025 · backs: status

    https://www.datacenterdynamics.com/en/news/amazon-pays-700m-for-planned-data-center-site-in-virginias-prince-william-county-report/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Data Center Dynamics · relevance 0.95

  2. · Prince William County Planning Commission · relevance 0.30

  3. Virginia Business · relevance 0.85