Jurisdiction: United Arab Emirates
UAE, multiple Khazna-delivered sites; specific facilities not disclosed in cited sources. Note: may partially overlap with Khazna's announced build pipeline (e.g. AUH4/AUH8) — claims kept separate pending site-level disclosure
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | Capital base before committed-capital evidence (announcement-only anchor region, §B.2.4). |
| Capital | capital commitment | +30 | Microsoft (investor) | investor role committed $15,200,000,000 (capex undisclosed — coverage unverifiable). |
| Infrastructure | baseline | 70 | Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | baseline | 70 | Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-11-01). |
Announcement · Actual:
Energization · Expected:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| G42 | — | — | |
| G42 | — | — | |
| Microsoft | — | $15.2B | |
| Khazna Data Centers | — | — | |
| Khazna Data Centers | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Microsoft Source EMEA · backs: actual date, capacity mw, expected date
https://news.microsoft.com/source/emea/2025/11/microsoft-and-g42-accelerate-uaes-digital-future-with-major-data-centre-expansion/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
Microsoft Source EMEA · relevance 0.70